For this assessment you are required to manage risks in a range of contexts across Town and Country Services. You must demonstrate your ability to:
For the provided case study, you will assume the role of the Risk Manager and it is your responsibility to identify and manage the risks in the regional expansion project. The Board of Directors of Town and Country Services will be responsible for strategic and financial risks.
In order to complete this project, you must develop a risk management plan which:
As part of the task you are to complete a written report for your manager (your assessor) that addresses the following 4 Stages of the risk management process.
As a business manager, when developing risk management plans for a project, you need to clearly identify a project’s goals or objectives and its scope and critical success factors of risk management.
(a) Describe goals/objectives of the business. Consider factors including:
(b) Explain the scope of the project in terms of “deliverables” (what it is designed to achieve)
(c) Relate the deliverables to the goals/objectives of the organisation and explain how the project promotes them
(d) Identify the Critical Success Factors (CSF) – factors that must be present in order for the project to be successful and promote Town and Country Service’s goal.
You realise that your action plan for implementing risk treatments needs to be reviewed. You need to evaluate the plan and write up what you find in a report which you will provide to your manager.
Risk Management is a complex process involving various levels of investigation and assessment before providing appropriate measures that would help in controlling the impacts of the risks. The concept of risk management, in business industries, has become increasingly relevant, with the expansion of the business market and new entries of smaller organizations. The initial step to risk management needs to identify and evaluate various risk factors and prioritize them according to the objectives of the organization (Lam, 2014). Secondly, it provides plausible solutions for the various identified risk factors and implements relevant economic measures that would minimize their exposure to risks. Thirdly, it identifies the particular ways through which the risk management could be made more sustainable. Instead of a one-time solution, a good risk management plan aims at a structural change in the organizational processes that would protect the organization from external threats or challenges (Rodrigues-da-Silva & Crispim, 2014).
The Town and Country Services in New South Wales, is a large-scale Company providing a wide range of construction services since 1973. The Company provides experiential as well as practical guidance in architectural construction planning. The Company’s new venture in the four different states of New South Wales—Orange, Bathrust, Mudgee and Wagga Wagga, requires a solid and full-proof risk management plan, in order to ensure smooth execution and delivery of services. This paper aims to investigate the context and organizational processes of the objectives in order to identify the particular risks and also provide appropriate measures for controlling them.
Understanding the context of the particular industry of the Company is extremely necessary as it forms the groundwork of the entire research with substantial information regarding the external industry environment of the business. A PESTEL analysis of the market industry has been conducted in order to identify the external factors that might affect the organization’s performance (Rastogi & Trivedi, 2016).
Political factors- The local governments of the chosen cities are highly supportive of new business enterprises coming up in the market, which works as a positive factor for the Company (Gray, Harymawan & Nowland, 2016).
Economic factors- As a central hub of most business is NSW, these cities are exposed to further economic growth and prosperity, which is economically beneficial for a new startup.
Social factors- With improvement in economy and lifestyles, there is an increased demand for professional guidance and elaborate planning in case of architectural designs for companies or households.
Technological factors- The advancement in technology has exposed the consumers to world-scale business market and raised their expectations in terms of service delivery.
Environmental factors- NSW is also one of the leading states facing stiff environmental issues related to global warming and pollution. Business corporations need to be environment-friendly in these areas (Akanni, Oke & Akpomiemie, 2015).
Legal factors- In terms of legality, the start-up businesses in these areas enjoy particular privileges and legal support in order to encourage more business interactions.
Understanding and estimating the prospect of a business concept can be considered the scope of the project. In order to clearly understand the scope of this Company expansion in 4 different states, we need to critically look at the main objectives of the organization, estimated deliverables from the project, relation shared between the objectives of the Company and its new venture, and its critical success factors.
Goals and Objectives of BusinessImprovising on the technological aspects of the organizational procedures is one of the chief aims of the Company, in order to attract the modern day customers (Dong & Martin, 2017).
Enhancing the Company’s service-delivery by launching new, innovative products and services, like providing a panel of architects as consultants for private or public constructions.
The Company aims to open new markets with the help of TCS, so that any consumer can avail their services, without having to be physically present.
Organizational Structure:
The Company aims employ in both full-time and part-time basis. The professional architects are on a part-time contract, where as consultants are hired on a full-time basis (Albers, Wohlgezogen & Zajac, 2016).
Deliverables is referred to the particular products and services, or quality of servicing that the Company aims to deliver to its customers (Beltagui, Darler & Candi, 2015). The Town and Country Construction Services is expanding its businesses over the states of Orange, Bathrust, Mudgee and Wagga Wagga, with the particular deliverables as their end result:
As compared and contrasted against the particular goals and objectives of the organization, the new venture reflects several areas that complement each other (Lamas Leite et al., 2017). The new venture of expanding the business is another attempt at enhancing their product and service-delivery, in order to achieve their organizational objectives.
Technology: One of the strategies to improvise and keep up with the technological advancements is to be creative and innovative in new business ventures in order to achieve customer-satisfaction.
Service-delivery: With further expansion of business in new markets, the Company would be able to enhance their service-delivery by adding more products and services to their deliverables.
Business Market: The Company would successfully expand the territory of their business market with new start-ups in different cities.
Organizational Structure: The Company would be able to support a mixed organizational structure that employs both part-time as well as full-time employees.
The critical success factors of the project, as analyzed against the Company objectives and the external market industry are as follows:
A risk management procedure for a business organization requires us to think of the business scenario from the perspective of each stakeholder in the organizational processes. The stakeholders of the Town and Country Construction Services are briefly discussed below:
Clients or Customers: As the Company deals with providing construction services and quality guidance in architecture planning, its success is heavily depended on the satisfaction of the consumers. Consumers of the Company could either be individuals or contractors, developers.
Suppliers and Contractors: Suppliers of intermediary raw materials or intermediary services like transportation and delivery of products, play a very important role in the process of managing organizational risks.
Internal Personnel: Internal management authorities of the Company are an important stakeholder as the strategy-building and decision-making responsibilities are carried out by them.
Project Funding Body: External funding bodies, be it governmental or non-governmental, are important stakeholders as they economically support the project in return of specific gains.
Stakeholders |
Internal/External |
Role in Process |
Stake in Process |
Customers |
External |
Creating demand for the deliverables |
Specific consumer requirements and expectations |
Suppliers |
External |
Supplying intermediary raw goods or services |
Providing raw materials or delivering finished goods and services |
Internal Personnel |
Internal |
Employment, Policy-making, decision-making, strategy-building |
Economic and other value returns |
Project Funding Body |
External |
Providing financial support for execution of processes |
Benefits from Company-profits |
According to (Murata et al., 2017), in order to maintain a smooth communication and understanding amongst the stakeholders of the Company, the following methods could be used:
Political factors: The political stability and support in the chosen states of NSW, is a beneficial factor in the project.
Economic Factors: The recent economic advancements not only created more affordability for consumers but also further scope of investment.
Social factors: With improvement in lifestyle and expectations, demands for professional guidance regarding construction services is on the rise.
Technological factors: Technological improvements in the field of construction services prove to be extremely useful in achieving customer-demands (Abuelmaatti, 2014).
Environmental factors: High concerns regarding degrading environmental conditions are unfavorable and need to be appropriately managed.
Legal factors: Adequate legal support for business start-ups is a huge bonus.
SWOTStrengths: The particular areas of strength of this project include: an increasing consumer-base, legal and economic support from government and improving social and economic conditions of the market in general.
Weaknesses: The project requires heavy economic and intellectual investment, which might be a burden to the Company along with the heavy production and delivery costs.
Opportunities: Implementation of relevant strategies and CSR policies would play a significant role in the successful execution of the project.
Threats: Construction activities create further environmental damage, which becomes a burden for the project objectives.
Risk to the stakeholders is a threat for the organization (Shinkevich et al., 2016). The Risk Management Policies and Strategies of the Town and Country Services emphasize on the value of the stakeholders in the organizational processes. By keeping the interests of the stakeholders in the forefront, the Company aims to achieve a significant level of success in managing and controlling the various risks to the organization and its stakeholders.
The key findings from the research of risk context are as follows:
With the successful completion of the risk assessment procedures, it is important to discuss it with the rest of the stakeholders of the Company. Since the Board of Directors would be responsible for strategic and financial, engaging them in a feedback conversation retrieves significant values. One important factor identified from the discussion is the preparation of budget and cost-saving techniques that would allow them to execute the project in a limited time-period (Islam et al., 2016). Taking into consideration the minutes of the discussions, further strategies and action plan will be developed.
Risk |
Assess Risk (L, M, H, E) |
Controls |
Monitoring |
Timelines |
Responsible |
Insurance risk |
H |
The policies must be renewed |
Proper documentation to be maintained |
Every year ending |
Financial manager |
Customer dissatisfaction |
E |
Feedback to be gathered |
To ensure the need of the customers are heard |
All the time |
Customer relationship manager |
Spilling of water |
M |
Proper pipelines to be maintained |
To ensure there is no leakage of water |
All the time |
Operational manager |
Electricity hazard |
L |
Proper electricity powerpoint to be installed |
To ensure there is no naked wire |
Twice in every year |
Operational manager |
The Risk Management Plan developed from the assessment of various threats and opportunities of the Company, as against its contemporary market position, needs to be evaluated and monitored closely before proceeding for implementation Mahmoudi et al., 2014). Besides the theoretical perspectives, there are significant loopholes in the practical narrative, which needs to be considered before implementing the practices. In order to properly evaluate the risk management procedures, they must be thoroughly checked with the contemporary real-life business scenarios, including existing competitors, entry of new entrepreneurs in the industry, cultural acceptance of the consumers and mutual profit of all the stakeholders.
Due to heavy torrential rains, the new office in Wagga Wagga experienced considerable loss of property. In spite of implementing strategies like buying insurances for risks in new premises, the strategy failed as the insurance did not cover storm damages.
As the risk plan had identified the issue of not being able to afford full-time professional architects, the initial strategy was to fill the vacancies with available employees from the Head Office; however, none of the employees are available for more than a week.
The plan had also identified risk of issues related to the local councils’ compliance to adopting new measures and practices. This issue was faced in Orange, as the local council denied permit to have building over 8-storey.
Though some of the risk factors could not be properly mitigated yet, some of the risks like environmental consequences are now in better control.
Practical loopholes like delays in certification processes were overlooked, which can be controlled by adhering to environment-friendly guidelines.
The risk management plan needs to be more inclusive of practical loopholes and environment-friendly guidelines (Kulczycka & Smol, 2016). They should better analyze future threats.
Risk Plan Effectiveness AnalysisThe Risk Plan was partially effective in the given scenario, as some of the issues remained in the processes, which caused considerable loss of time and resources.
Evaluation of Risk Management ProcessThe chosen evaluation process was conclusive of particular risk management strategies but it failed to achieve the objectives completely due to certain gaps and loopholes in the analyzing process.
To conclude, the development of a Risk Management Plan for the Town and country Services in NSW required to undertake several processes in order to thoroughly understand its context, critically analyze its opportunities and threats, and finally devise relevant strategies and action plan to implement the required changes in the set-up, to control the impacts of these threats. A PESTEL analysis on the contemporary market environment has been conducted to understand the business market, its consumers and their expectations.
The derivations from the PESTEL analysis helped in deriving the particular Strengths, Weaknesses, Opportunities and Threats (SWOT) of the Company, completing a thorough analysis of internal factors. By using the derivations from the PESTEL and SWOT analyses, this research aimed to look at the given scenario from the perspective of a risk manager, venturing in new projects in four different cities. The identification of the particular risk factors helped in devising appropriate strategies that can mitigate or control the risk and their impact on business. The risk assessment procedure arranges the risks on a basis of priority. Finally, an action plan is laid out and discussed with the stakeholders for evaluation of the plan and further amendments.
However, during the implementation process, a number of loopholes could be found in the strategies, which led to dire consequences. Therefore, the research identified the particular gaps in the assessment and provided further recommendations to make it full-proof.
Abuelmaatti, A. (2014). Collaborative technologies for small and medium-sized architecture, engineering and construction enterprises: implementation survey. Journal of Information Technology in Construction (ITcon), 19(12), 210-224. Retrieved from: https://usir.salford.ac.uk/36174/1/2014_12.content.080703.pdf
Akanni, P. O., Oke, A. E., & Akpomiemie, O. A. (2015). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal, 11(1), 91-97. DOI: https://doi.org/10.1016/j.hbrcj.2014.02.010
Albers, S., Wohlgezogen, F., & Zajac, E. J. (2016). Strategic alliance structures: An organization design perspective. Journal of Management, 42(3), 582-614. DOI: https://doi.org/10.1177%2F0149206313488209
Beltagui, A., Darler, W., & Candi, M. (2015). Measuring the deliverable and impressible dimensions of service experience. Creativity and Innovation Management, 24(3), 478-492. DOI: https://doi.org/10.1111/caim.12130
Coombs, T., & Holladay, S. (2015). CSR as crisis risk: expanding how we conceptualize the relationship. Corporate Communications: An International Journal, 20(2), 144-162. DOI: https://doi.org/10.1108/CCIJ-10-2013-0078
Dong, R. R., & Martin, A. (2017). Research on Barriers and Government Driving Force in Technological Innovation of Architecture Based on BIM. EURASIA Journal of Mathematics, Science and Technology Education, 13(8), 5757-5763. DOI: https://doi.org/10.12973/eurasia.2017.01025a
Drew, J., Kortt, M. A., & Dollery, B. (2017). No Aladdin’s Cave in New South Wales? Local government amalgamation, scale economies, and data envelopment analysis specification. Administration & Society, 49(10), 1450-1470. DOI: https://doi.org/10.1177%2F0095399715581045
Gray, S., Harymawan, I., & Nowland, J. (2016). Political and government connections on corporate boards in Australia: Good for business?. Australian Journal of Management, 41(1), 3-26. DOI: https://doi.org/10.1177%2F0312896214535788
Islam, M. A., Ren, S., Mahmud, A. H., & Quan, G. (2016). Online energy budgeting for cost minimization in virtualized data center. IEEE Transactions on Services Computing, 9(3), 421-432. DOI: https://doi.org/10.1109/TSC.2015.2390231
Khalid, M. S. B., & Shafiai, S. B. (2015). Flood disaster management in Malaysia: An evaluation of the effectiveness flood delivery system. International Journal of Social Science and Humanity, 5(4), 398. Retrieved from: https://pdfs.semanticscholar.org/c552/ec3fb7eb811ee3b05eb3a6d865fbca335862.pdf
Kulczycka, J., & Smol, M. (2016). Environmentally friendly pathways for the evaluation of investment projects using life cycle assessment (LCA) and life cycle cost analysis (LCCA). Clean Technologies and Environmental Policy, 18(3), 829-842. DOI: https://doi.org/10.1007/s10098-015-1059-x
Lam, J. (2014). Enterprise risk management: from incentives to controls. John Wiley & Sons. Retrieved from: https://books.google.co.in
Lamas Leite, J. G., de Brito Mello, L. C. B., Longo, O. C., & Cruz, E. P. (2017). Using Analytic Hierarchy Process to Optimize PESTEL Scenario Analysis Tool in Huge Construction Projects. In Applied Mechanics and Materials(Vol. 865, pp. 707-712). Trans Tech Publications. DOI: https://doi.org/10.4028/www.scientific.net/AMM.865.707
Mahmoudi, S., Ghasemi, F., Mohammadfam, I., & Soleimani, E. (2014). Framework for continuous assessment and improvement of occupational health and safety issues in construction companies. Safety and health at work, 5(3), 125-130. DOI: https://doi.org/10.1016/j.shaw.2014.05.005
Murata, K., Tezel, A., Koskela, L., & Tzortzopoulos, P. (2017). An Application of Control Theory to Visual Management for Organizational Communication in Construction. Retrieved from: https://iglc.net/Papers/Details/1385
Nesticò, A., & Pipolo, O. (2015). A protocol for sustainable building interventions: financial analysis and environmental effects. International Journal of Business Intelligence and Data Mining, 10(3), 199-212. Retrieved from: https://www.researchgate.net/profile/Antonio_Nestico/publication/282763719_A_protocol_for_sustainable_building_interventions_Financial_analysis_and_environmental_effects/links/56c3102c08aee3dcd416389c.pdf
Rastogi, N. I. T. A. N. K., & Trivedi, M. K. (2016). PESTLE technique–a tool to identify external risks in construction projects. International Research Journal of Engineering and Technology (IRJET), 3(1), 384-388. Retrieved from: https://irjet.net/archives/V3/i1/IRJET-V3I165.pdf
Rodrigues-da-Silva, L. H., & Crispim, J. A. (2014). The project risk management process, a preliminary study. Procedia technology, 16, 943-949. Retrieved from: https://core.ac.uk/download/pdf
Shinkevich, A. I., Lubnina, A. A., Koryakov, A. G., Mikhailov, V. G., & Vodolazhskaya, E. L. (2016). Economic aspects of risk management of stakeholders activities. International Review of Management and Marketing, 6(2), 328-332. Retrieved from: https://econjournals.com/index.php/irmm/article/viewFile/2150/pdf
Zimmermann, O., Wegmann, L., Koziolek, H., & Goldschmidt, T. (2015, May). Architectural decision guidance across projects-problem space modeling, decision backlog management and cloud computing knowledge. In Software Architecture (WICSA), 2015 12th Working IEEE/IFIP Conference on (pp. 85-94). IEEE. DOI: https://doi.org/10.1109/WICSA.2015.29
To export a reference to this article please select a referencing stye below:
My Assignment Help. (2021). Manage Risk. Retrieved from https://myassignmenthelp.com/free-samples/bsbrsk501-manage-risk/ieee-transactions-on-services-computing.html.
"Manage Risk." My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/bsbrsk501-manage-risk/ieee-transactions-on-services-computing.html.
My Assignment Help (2021) Manage Risk [Online]. Available from: https://myassignmenthelp.com/free-samples/bsbrsk501-manage-risk/ieee-transactions-on-services-computing.html
[Accessed 20 April 2021].
My Assignment Help. 'Manage Risk' (My Assignment Help, 2021) <https://myassignmenthelp.com/free-samples/bsbrsk501-manage-risk/ieee-transactions-on-services-computing.html> accessed 20 April 2021.
My Assignment Help. Manage Risk [Internet]. My Assignment Help. 2021 [cited 20 April 2021]. Available from: https://myassignmenthelp.com/free-samples/bsbrsk501-manage-risk/ieee-transactions-on-services-computing.html.
Citation becomes a problem specially when you have multiple sources to refere to for creating your research papers. We guide you how to write a research paper, provide you with a proper research paper outline, good research paper topics. We also help you with writing a research proposal and various research project ideas. We strictly adhere to the standard guidelines and conventions. Owing to our quality and sucess ratio of students we are one of the best paper writing service in the industry.
Answer Introduction The report will discuss about the importance of UML in bringing the success towards OO software projects today. Object oriented software engineering is a methodology and object modelling language. Ivar Jacobson developed Object oriented software engineering in 1992 (Larman 2014). UML is a standard language used for constructing, specifying, visualising and for documenting artefacts associated with developing a software sys...
Read MoreAnswer “Indeed every opinion is a marriage of information and predisposition”. This is one of arguments made by Zaller in his book, “The Nature and Origin of Mass Opinion”. Undoubtedly the elite discourse has a very crucial role to play in determining the information which voters have regarding potential election candidates (Zaller, 1992). You like or not quite a large number of people who live in large societies a...
Read MoreAnswer Part A: 1. CRM stands for customer relationship management. This is very much necessary to understand and take measures that will effectively manage the customer lifecycle. Customer relationship management follows an approach that ensures managing the company’s interaction with its potential customer and current customer. The customer’s data is being collected with the help of data analysis. The CRM helps to manage the proc...
Read MoreAnswer: The sustainable development goals aim to take actions in the global level to overcome different type of difficulties in the global communities such as poverty, providing protection to the planet to ensure that all the people in this world live in peach and prosperity. There are total 17 goals that include bring changes to face global climate change, economic inequality, sustainable consumption, innovation so that the peace and prioriti...
Read MoreAnswer Annotated Bibliography on Fire and Safety Introduction The fire is form of chemical reaction which is involved with rapid oxidation of the fuel with liberation of both heat as well as light. This paper provides information concerning the precautions which are taken to avoid the fire hazards. The hazards are eradicated for possible sources of the fire ignition which are existed in the organization. The Occupational safety and health ad...
Read MoreJust share requirement and get customized Solution.
Orders
Overall Rating
Experts
Our writers make sure that all orders are submitted, prior to the deadline.
Using reliable plagiarism detection software, Turnitin.com.We only provide customized 100 percent original papers.
Feel free to contact our assignment writing services any time via phone, email or live chat. If you are unable to calculate word count online, ask our customer executives.
Our writers can provide you professional writing assistance on any subject at any level.
Our best price guarantee ensures that the features we offer cannot be matched by any of the competitors.
Get all your documents checked for plagiarism or duplicacy with us.
Get different kinds of essays typed in minutes with clicks.
Calculate your semester grades and cumulative GPa with our GPA Calculator.
Balance any chemical equation in minutes just by entering the formula.
Calculate the number of words and number of pages of all your academic documents.
Our Mission Client Satisfaction
It was perfect I don\'t have to get it redone really on point and very happy with it thanks so much. You guys are a lifesaver
Australia
Good work from them!! Great service!! They didn’t make me wait on my work I got it on time!!
Australia
a great work. to be honest i was\'t sure if the expert would get everything right, but it turned really well.
Australia
The work has been done properly, exactly as required. I\'m very happy with it. Thanks to the expert for such a masterpiece.
Australia