COIT20248 Information Systems Analysis And Design 2

tag 0 Download10 Pages / 2,353 Words tag Add in library Click this icon and make it bookmark in your library to refer it later. GOT IT

Question:

For the purpose of this assignment, you are assumed to be one of the software consultants appointed to shoulder the system analysis responsibilities in, Global Business Systems in the project outlined in the case study.

You will plan and manage the project as well as investigate and document its system requirements. For your Assignment 1 submission, you will produce a report that discusses this project based on your understanding of it and the related investigation results through the tasks below.

Task 1:

Approaches to Systems Development

  • How wouldUNICEF Child Care go about developing its information systems?
  • Justify your choice of your selected approach to systems development.

Task 2:

Systems Requirements

  • What are the primary functional requirements for the system in the case study?
  • What are the non-functional requirements for the system in the case study?

Task 3:

Project Cost Benefit Analysis

  • Discuss your Project Cost Benefit Analysis.
  • Provide an excel spread sheet with details in a Project Cost Benefit Analysis.

Task 4:

Project Schedule

  • Show a work breakdown structure and a project schedule as a Gantt Chart. Explain both of them and discuss how they relate to each other.
  • Given the system goals, requirements, and scope as they are currently understood, is the project schedule reasonable? Why or why not?

Task 5:

System Information Requirement Investigation Techniques

  • Who are the stakeholders involved?
  • Explain your choice of the 3 most useful investigation techniques.
  • Justify the usefulness of these 3 investigation techniques.
 

Answer:

Introduction 

The report mainly focusses on the information system development for the “UNICEF Child Care” organization so that the problems that the organization is facing due to the utilization of manual system can be mitigated easily. The new system will provide the facility of depositing fees online and after the payment, a thanking email for the payment will be generated automatically. The data as well as information related with payment will be stored within the client login so that at the end of the year they have consolidated statement regarding payment. In addition to this, the ordering of supplies product for the childcare will become automated.

Task 1: Approaches to system Development

How Child Care go about developing its information system

 It is identified that in order to develop the information system for the UNICEF childcare organization, it is very much necessary to select proper software development methodology as per the project necessity. The needs for the development of information system is generally fragmented down into number of phases and proper effort is provided in order to complete the development of the information system for the UNICEF child care organization successfully (Mir & Pinnington, 2014).  Furthermore, proper budget as well as time must be analyzed for the project so that the project tasks that are assigned to various project stakeholders could be completed effectively within due date. Proper management is quite important in order to develop the system as per the organizational goals and objectives.

Justification for the selected approach for the system development

In this project, agile project methodology is selected for developing an information system for the “UNICEF Child care” organization.  The selection of the model is done after focusing on number of factors including size of project team as well as nature of Information system required (Serrador & Pinto, 2015).  It is analyzed that agile method will be most suitable for the project as the project  it virtually eliminates the chances of project failures and also assists in minimizing the number of errors that is mainly generated during the advancement of project development process. In addition to this, this project methodology helps in enhancing collaboration and ownership among the various team members of the project.

 

Task 2: Systems Requirement

Listing primary functional requirement for the system

The functional requirements of the system includes:

Administrative functions: Various administrative functions are needed in order to manage the information that is present within the information system database.

Business rules: It is found that business rules are generally needed in order to analyze the project requirements so that the needs of the project can be easily aligned with the information system development (Buede & Miller, 2016). 

External interfaces: In order to record the information as well as data that are generally inputted by the users, external interfaces are generally needed.

Legal and regulatory requirements: It is necessary to resolve all the regulatory issues as well as challenges before the deployment phase of the information system that is mainly developed for UNICEF childcare (Volk, Stengel & Schultmann, 2014).

Authentication: It is necessary to protect the account of the admin as well as users by providing the facility of authentication so that other personnel do not misuse confidential information.

Listing non-functional requirement for the system

The non-functional requirements of the system includes:

Data integrity: It is very much necessary to integrate the data that is mainly present within the database of the information system (Hosseini et al., 2016).

Scalability: In order to enhance system scalability as well as flexibility by minimizing the operational cost that is associated with the information system, it is necessary to implement cloud solution.

Performance:  It is quite necessary to have system that have very much less response time as compared to others (Ismail & King, 2014).

Security: Proper security as well as encryption facility must be provided to the database of the system in order to avoid misuse of information and data.

 

Task 3: Project Cost Benefit Analysis

Cost benefit analysis is mainly undertaken within the project in order to estimate all the costs that are involved with the project and the various possible profits that are generally derived from the project (Boardman et al., 2017).  It is identified that with the help of cost benefit analysis, both positive as well as negative aspect of the project can be properly analyzed in order to elaborate the benefits of the project in context to effort as well as time. In addition to this, both the ratio of operating costs as well as benefits can be identified with the help of CB analysis.

Cost Benefit Analysis for UNICEF Case Study

Hardware

 $         80,000.00

Software

 $         70,000.00

Development team salaries

 $         70,000.00

Training

 $           5,000.00

Total Development Cost

 $       225,000.00

Maintenance

 $           6,000.00

Changes

 $           3,000.00

Operational Labor

 $         30,000.00

Total Operational Cost

 $         39,000.00

Approximate salary savings

 $         54,000.00

Reduced Food Wastage

 $         60,000.00

Total Benefit

 $       114,000.00

Discount Rate Used

6.00%

 

Project Cost-Benefit Analysis

 

 

 

 

 

 

 

 

Analysis Variables:

 

 

 

 

 

 

 

 

Discount Rate Used

6.00%

 

 

 

 

 

 

 

Annual Benefits

 $   114,000.00

 

 

 

 

 

 

 

Annual Operational Costs

 $     39,000.00

 

 

 

 

 

 

 

One-Time Development Cost

 $   225,000.00

 

 

 

 

 

 

 

 

 

 

 

Year of Project

 

 

 

 

 

 

0

1

2

3

4

5

TOTALS

Economic Benefit

 

$0.00

 $        114,000.00

 $        114,000.00

 $          114,000.00

 $        114,000.00

 $      114,000.00

 

Discount Rate

 

1.0000

0.9434

0.8900

0.8396

0.7921

0.7473

 

PV of Benefits

 

$0.00

$107,547.17

$101,459.59

$95,716.60

$90,298.68

$85,187.43

 

NPV of all BENEFITS

 

$0.00

 $        107,547.17

 $        209,006.76

 $          304,723.36

 $        395,022.04

 $      480,209.47

 $     480,209.47

One-Time COSTS

 

 $(225,000.00)

 

 

 

 

 

 

Recurring Costs

 

$0.00

 $         (39,000.00)

 $         (39,000.00)

 $           (39,000.00)

 $         (39,000.00)

 $       (39,000.00)

 

Discount Rate

 

1.0000

0.9434

0.8900

0.8396

0.7921

0.7473

 

PV of Recurring Costs

 

$0.00

 $         (36,792.45)

 $         (34,709.86)

 $           (32,745.15)

 $         (30,891.65)

 $       (29,143.07)

 

NPV of all COSTS

 

 $(225,000.00)

 $       (261,792.45)

 $       (296,502.31)

 $         (329,247.47)

 $       (360,139.12)

 $     (389,282.19)

 $    (389,282.19)

Overall NPV

 

 

 

 

 

 

 

 $      90,927.28

Overall ROI

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0.2336

 
 

Task 4: Project Schedule

Work breakdown structure, project schedule and relation between them

Work breakdown Structure

The Work breakdown Structure is created for the project so that the team work can be organized into number of manageable sections. It is used for visually defining the scope of the project into manageable chunks so that the project team can understand and can able to execute the development of information system for the organization successfully.

 

Figure 1: WBS

(Source: Created by Author)

Gantt chart

Gantt chart is created for this project so that the team members of the project can be able understand the overall impact of project delays for stronger collaboration as well as for better organization of the task. The Gantt chart is also helpful in handling the project successfully by estimating the time that is needed for completing the development of information system. From the Gantt chart, it is assumed that the entire project will be completed in 117 days.

 

Figure 2: Gantt chart

(Source: Created by Author)

Relation between Gantt chart and WBS

The Gantt chart that is provided is mainly used for monitoring the activities of the project that are mainly assigned  for completing the entire project work within the estimated budget and time (Snyder, 2014).  It is identified that the schedule of the project helps in delivering the project on time and it is identified that in order to successfully develop the project schedule, it is necessary to have proper work breakdown structure. It is found that the work breakdown structure generally assists in breaking the project into number of manageable tasks and helps in estimating time within which the activities of the project will be executed.

Explanation for the reasonability of the project schedule

It is very much important to understand the system goals as well as requirements properly for creating the project schedule. The schedule that is developed is mainly aligned with the various project requirements so that the needs of the project can be fulfilled and the schedule can be used by the project managers for executing each of the project activities successfully within the estimated budget as well as time (Wolken-Mohlmann et al., 2016). The schedule of the project must be fragmented into numerous phases so that the cost of the project can be estimated properly.

 

Task 5: System Information Requirement Investigation Techniques

Listing the stakeholders in the project

The stakeholders  of the project are listed below:

  • Chairman (John Smith)
  • Admin staff
  • Accountant
  • Handyman
  • Treasure
  • Public officer
  • Treasurer

Explanation of the three most useful investigation techniques

 The three most important investigation technique that are useful for determining the requirement of the project are as follows:

  • Sampling of forms, databases and documentation
  • Interviews
  • Prototyping

Justification for the usefulness of the three-investigation technique

The benefits of the three-investigation technique are as follows:

Sampling of forms, databases and documentation:

Interviews: Interviews are mainly categorized into structured as well as unstructured interviews. Interviews are performed by involving the human resource department of the organization (Chen et al., 2015). The main purpose of the interview is to gather information about the requirement of the project and for involving the project stakeholders within the entire development process of the project.

Prototyping: It is one of the sampling method in which a simple preliminary design is created for the information system in order to get the approval from the project stakeholder. The prototype is mainly applied within the early stages of development phase for reducing errors within the project (Preston & Roy, 2017).

Sampling of present forms, databases and documentation: This method is mainly utilized in order to collect existing documents that are associated with the organization. The sources that are included with sampling includes emails, reports, customer complaints as well as box notes (Razak et al., 2016).

Conclusion

It can be concluded that the development of Information System for the “UNICEF Childcare” organization is quite advantageous, as it not only helps in resolving the challenges that the company faces due to manual system but also assists in making the operations of the organization automatic. It is identified that Agile project methodology is mainly utilized within the project in order to successful develop the information system. In addition to this, cost benefit analysis is mainly undertaken for analyzing the feasibility of the project.

 

References

Boardman, A. E., Greenberg, D. H., Vining, A. R., & Weimer, D. L. (2017). Cost-benefit analysis: concepts and practice. Cambridge University Press.

Buede, D. M., & Miller, W. D. (2016). The engineering design of systems: models and methods. John Wiley & Sons.

Chen, Y. C., Chung, T. Y., Lin, C. S., Wu, T. S., & Leu, H. S. (2015). Investigation report on an event of neurosurgical postoperative surgical site infections. Journal of Microbiology, Immunology and Infection, 48(2), S115.

Hosseini, M., Shahri, A., Phalp, K. & Ali, R., (2016). June. A modelling language for transparency requirements in business information systems. In International Conference on Advanced Information Systems Engineering (pp. 239-254). Springer, Cham.

Ismail, N. A., & King, M. (2014). Factors influencing the alignment of accounting information systems in small and medium sized Malaysian manufacturing firms. Journal of Information Systems and Small Business, 1(1-2), 1-20.

Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), 202-217.

Preston, R. P., & Roy, J. (2017). Use of unmanned aerial vehicles to supplement conventional investigation methods for underground open void stability and mitigation.

Razak, S. A., Othman, S. H., Aldolah, A. A., & Ngadi, M. A. (2016). Conceptual investigation process model for managing database forensic investigation knowledge. Res. J. Appl. Sci., Eng. Technol., 12(4), 386-394.

Serrador, P., & Pinto, J. K. (2015). Does Agile work?—A quantitative analysis of agile project success. International Journal of Project Management, 33(5), 1040-1051.

Snyder, C. S. (2014). A guide to the project management body of knowledge: PMBOK (®) guide. Project Management Institute: Newtown Square, PA, USA.

Volk, R., Stengel, J., & Schultmann, F. (2014). Building Information Modeling (BIM) for existing buildings—Literature review and future needs. Automation in construction, 38, 109-127.

Wolken-Möhlmann, G., Bendlin, D., Buschmann, J., & Wiggert, M. (2016). Project schedule assessment with a focus on different input weather data sources. Energy Procedia, 94, 517-522.

Download Sample

Get 100% money back after download, simply upload your unique content* of similar no. of pages or more. We verify your content and once successfully verified 100% value credited to your wallet within 7 days.

Upload Unique Document

Document Under Evaluation

Get Credits into Your Wallet

*The content must not be available online or in our existing Database to qualify as unique.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2020). Information Systems Analysis And Design 2. Retrieved from https://myassignmenthelp.com/free-samples/coit20248-information-systems-analysis-and-design-2.

"Information Systems Analysis And Design 2." My Assignment Help, 2020, https://myassignmenthelp.com/free-samples/coit20248-information-systems-analysis-and-design-2.

My Assignment Help (2020) Information Systems Analysis And Design 2 [Online]. Available from: https://myassignmenthelp.com/free-samples/coit20248-information-systems-analysis-and-design-2
[Accessed 10 July 2020].

My Assignment Help. 'Information Systems Analysis And Design 2' (My Assignment Help, 2020) <https://myassignmenthelp.com/free-samples/coit20248-information-systems-analysis-and-design-2> accessed 10 July 2020.

My Assignment Help. Information Systems Analysis And Design 2 [Internet]. My Assignment Help. 2020 [cited 10 July 2020]. Available from: https://myassignmenthelp.com/free-samples/coit20248-information-systems-analysis-and-design-2.


Myassignmenthelp.com helps in writing all types of discussions for any essay topics and any subjects. With a group of over 4000+ PhD experts we have most insightful resource for writing any discussion. So the next time you are wondering how to write a discussion essay, get essay help from us. We segregate the topics of discussions into general and specific, link explanation, description, theory and findings to literature in the best possible way, using the best possible narration. Over periods of time our team has mastered the art of writing great essay. So our work gets accolades from teachers and secures grades. Connect with us today if you have any discussion writing woes.

Latest It Write Up Samples

HI5019 Strategic Information Systems For Business And Enterprise 3

Download : 0 | Pages : 18

Answer: Introduction  Cybersecurity issues can have a direct influence on both business sakes as well as on the reputation of the business (Chhetri, Canedo and Al Faruque 2016). There are numerous Information Systems (IS) which are deployed across commercial establishments to optimize their business operations (Perlroth, Scott and Frenkel 2017). The role of the accountants of the system development projects is very much crucial to mainta...

Read More arrow Tags: Australia Brisbane 7 Strategic Information Systems for Business and Enterprise Holmes Institute 

ICT710 ICT Professional Practice And Ethics

Download : 0 | Pages : 13

Answer: Introduction Information and communications technology or ICT could be referred to as the extension term form information technology, which majorly focuses on the role of different unified communication and overall integration of the telecommunication or telephone lines and wireless signals or computers (Dutta, Geiger and Lanvin 2015, p. 1). Large economic incentives are required for merging different telephone networks with the respe...

Read More arrow Tags: Australia Rochedale 7 ict profesional practice and ethics University of the Sunshine Coast 

BUS5WB Data Warehousing And Big Data 2

Download : 0 | Pages : 2
  • Course Code: BUS5WB
  • University: La Trobe University
  • Country: Australia

Answer: Agile Data Warehouse Development Creation of data warehouse is multi quarter, monolithic and large effort subject to waterfall process. In modern age, that is no longer norm as several organizations are selecting to adopt more iterative and flexible design approach. With needs of business changing faster as well as new businesses requiring to adapt as well as leverage the inputs rapidly and concisely. Agile development approach is the...

Read More arrow Tags: Australia Bundoora 7 Data Warehousing and Big Data La Trobe University 

ITECH7401 Leadership In IT Project Management

Download : 0 | Pages : 3
  • Course Code: ITECH7401
  • University: Federation University
  • Country: Australia

Answer: Budget Estimate and Financial Analysis The Return on Investment (ROI) is 125.10%, which is higher than the required ROI of twenty-five per cent. Thus, the report concludes that this project will be beneficial Port Fairy Caravan and Camping Park Pty Ltd. Year 0 1 2 3 Total Inflows (Income) 0 90000 130000 150000 370000 Outflows (Expenses) -90000 -2000...

Read More arrow Tags: Australia Riverwood 7 Leadership in IT Project Management Federation University 

MAN6910 Business Process Management

Download : 0 | Pages : 5
  • Course Code: MAN6910
  • University: Edith Cowan University
  • Country: Australia

Answer: Issue register Name of issue Patient waiting too long to register Priority 2 Description When the patients visits the hospital, the new patients are required to be registered first for gaining the treatment in the hospital. Data and assumption Over 20% of the patients who are visiting the hospital are raising the issue of extensive waiting time and longer duration for which treatmen...

Read More arrow Tags: Australia Ashgrove 7 business process management Edith Cowan University 
Next
watch

Save Time & improve Grade

Just share Requriment and get customize Solution.

question
We will use e-mail only for:

arrow Communication regarding your orders

arrow To send you invoices, and other billing info

arrow To provide you with information of offers and other benefits

1,359,015

Orders

4.9/5

Overall Rating

5,081

Experts

Our Amazing Features

delivery

On Time Delivery

Our writers make sure that all orders are submitted, prior to the deadline.

work

Plagiarism Free Work

Using reliable plagiarism detection software, Turnitin.com.We only provide customized 100 percent original papers.

time

24 X 7 Live Help

Feel free to contact our assignment writing services any time via phone, email or live chat.

subject

Services For All Subjects

Our writers can provide you professional writing assistance on any subject at any level.

price

Best Price Guarantee

Our best price guarantee ensures that the features we offer cannot be matched by any of the competitors.

Our Experts

Assignment writing guide
student rating student rating student rating student rating student rating 5/5

1896 Order Completed

95% Response Time

Herman Berens

MSc in Psychology

London, United Kingdom

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

440 Order Completed

99% Response Time

Jack Arens

MBA in HRM

London, United Kingdom

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 4/5

2594 Order Completed

95% Response Time

Michael Johnson

Masters of MSc in Economics

Washington, United States

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

184 Order Completed

96% Response Time

Arapera Billing

Masters in Management, MMgt

Wellington, New Zealand

Hire Me

FREE Tools

plagiarism

Plagiarism Checker

Get all your documents checked for plagiarism or duplicacy with us.

essay

Essay Typer

Get different kinds of essays typed in minutes with clicks.

edit

GPA Calculator

Calculate your semester grades and cumulative GPa with our GPA Calculator.

referencing

Chemical Equation Balancer

Balance any chemical equation in minutes just by entering the formula.

calculator

Word Counter & Page Calculator

Calculate the number of words and number of pages of all your academic documents.

Refer Just 5 Friends to Earn More than $2000

Check your estimated earning as per your ability

1

1

1

Your Approx Earning

Live Review

Our Mission Client Satisfaction

Great work from expert! All good just missing one 1 reference, feedback and get it within a few hours.

flag

User Id: 254651 - 10 Jul 2020

Australia

student rating student rating student rating student rating student rating

Amazing work, thank you very much I have achieved amazing results. Thank you for your hard work

flag

User Id: 261191 - 10 Jul 2020

Australia

student rating student rating student rating student rating student rating

Really good work on the code. It ran perfectly and there were no mistakes in the code. All of the instructions were followed and there were no syntax errors at all.

flag

User Id: 457776 - 10 Jul 2020

Australia

student rating student rating student rating student rating student rating

very clear answers, full of information. The doctor was very happy with the answers. Thank you.

flag

User Id: 391476 - 10 Jul 2020

Australia

student rating student rating student rating student rating student rating
callback request mobile
Have any Query?