Contributing Factors In Construction Accidents

tag 0 Download6 Pages / 1,376 Words tag Add in library Click this icon and make it bookmark in your library to refer it later. GOT IT

Question:

Discuss about the Contributing Factors in Construction Accidents.
 
 

Answer:

Introduction:

The focus of discussion in the current research is to identify the relation between the project safety and the number of non-conformances and/or the volume of the rework in the construction sites. The research in the evidence based literature review indicates that there is positive relation between these two aspects, there is positive relation between the project safety as well as the non-conformances at the construction site reworks.  The current report is a focus on this exhaustive relation and the study is performing to relate these two different aspects. Also recommendations based discussion is provided with proposals to reduce the safety incidents as well as to reduce the amount of rework on construction sites.

The relationship between the safety and quality outcomes do have very limited attention in the construction and the engineering management domain. One of the main factor responsible for the development of such scenario is the fact that the contractors and the builders are not interested to reveal the sensitive information related to the reworks and the associated factors that are relating these incidents with the accidents in general. In accordance with the report presented by Love(2015), there is an extensive 31 months analysis of the relation between the incidents and rework and based on the observations it is indicated that the risk profiles for incidents and the NCRs are established with the mathematical analysis. The data indicated as high as mean ratio of incidents to rework NCRS to be 1:7. Also it is indicated that the relation between incidents and the rework NCRS (p<0.05). Similar indications are reported in other recent empirical evidence based reports; It is found that there two statistically significant relationships; the OSHA recordable rate is positively correlated to rework (r2 =0.968, p-value =0.032); Also the first aid rate is positively correlated to the number of defects (r2 = 0.548, p-value=0.009) (Wanberg, 2013).  There is indication that the most compelling reason for the strong positive correlation between rework and injuries is the fact that rework involves demolition, schedule pressure as well as unstable work processes.

Mortenson construction works have used computer automated, virtual environment technology at the Peguala Ice Arena at Penn State and in the course of time they catched and fixed the problems early. Typical tools like virtual images of mechanical systems are employed to prevent the mistakes that involve the rework in general. Reworks are increasing the construction schedules and delaying the delivery, Further reworks are contributing to the worker injuries and billions of lost revenue (Moore).

 

The problems of NCRS and reworks can be tackled with multiple dimensions. It is required that there should be sufficient care provided at the outset for the sake of exhaustive preplanning of the projects, Also there is need that there should be sufficient allocation of the resources available for completing the project, projects should be subjected to every measure that actually works on to complete the schedule in time. Also there should be strategic promotion of leadership at the work place as well workers should be encouraged to take pride in their work. Further there should be extensive considerations to be taken to encourage strategies for promoting the safety and quality. Also it is not impossible to totally avoid the scheduled delays. It is required that there should be exhaustive planning and effective contracting process to enhance the quality and safety in the work and thereby there should be means to avoid the delay in the works. There should be steep release of the funds in accordance with the project progression requirements and secondly there is need that there should be fines and penalties for the project delays and this inturn will  effect the project progression and scheduling process. Construction business is quite fast and there is need for companies to catch these recent strategies to avert the delays and the progression methodologies to avoid the delays and to keep up the competitive edge in the market(Construction drive).

Apart from these basic considerations there is need to enforce recommendation like those of ARCTM, where is there is specific reference made towards the worker’s training for the job which he is expected to make, enforcement of working conditions which are safe and accident free. Also there is considerable responsibility of the project manager there lies in enforcing better operational conditions in the work place. All of them should be followed with very detailed and specific enforcement at each and every stage of project progression (Abdelhamid,2000).It is also indicated that apart from the basic issues such as workers ignorance and contribution of the apathy of the management towards the workplace safety, there are also issues such as incompetent risk management at the work place as well as improper design of ergonomics at the construction site as well as issues such as deficiencies of the work place being employed in the workplace. All of them do have collective impact on the work place operational integrity and the operational performance (Haslam, 2005).Hwang(2014) indicated that there are several instances of reworks in the construction industry happening because of the lack of systematic planning to avert the same. Hence as per his proposal usage of knowledge based systems to record the ongoing technological progression of the construction works and approaches for elimination of the rework will provide opportunity to enhance the betterment of the organizational performance to avoid reworks in construction. Better design and KMS will contribute in this regard.  A comprehensive project management involving design management, communication management, filed management, project scope management, project process management, active rework, project plan management, external environment management etc required for minimizing the project rework in the construction industry (Ye, 2014).

Conclusion:

The evidence based research findings in relation to the empirical relation between NCRS of reworks and the accident incidents at the site indicate that there is great need to avert the escalation of conditions to the extent of safety incidents as well there is need to avoid loss of revenues to the company in the form of delayed project deliveries as well as in the form of revenue loss due to accidents and related procedural problems and obligations. At the outset there is need to change the traditional construction process monitoring methodologies to more advanced and better technology enabled processes and procedures. Also as indicated in the previous discussion always the project control should be in the hands of able leadership and there should be systematic and strategic interventions from the beginning of the project to avoid delays and expectation mismatch requirements. Also while drafting the contractual obligations there should be sufficient insight and all the terms and the regulations of the project are required to be prepared in detail so that there will be quite a good control of the project progress while preventing the happening of the delays as well as the associated problems of revenue loss from the project.

 

References:

Anon., n.d. [Online] Available at: ‘Moore P, ‘Contractors confront the growing costs of rework’, Engineering News record, 28/11/2012

Anon., n.d. [Online]  Available at: Wanberg J et al, ‘Relationship between Construction Safety and Quality Performance’, Journal of Construction Engineering Management, Volume 139, Issue 10, October 2013

Anon., n.d. [Online]  Available at: The Dotted Line: How to avoid schedule delays through careful planning, effective contracts, https://www.constructiondive.com/news/the-dotted-line-how-to-avoid-schedule-delays-through-careful-planning-eff/440167/

Abdelhamid, T.S. and Everett, J.G., 2000. Identifying root causes of construction accidents. Journal of construction engineering and management, 126(1), pp.52-60.

Hwang, B.G., Zhao, X. and Goh, K.J., 2014. Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management, 32(4), pp.698-708.

Haslam, R.A., Hide, S.A., Gibb, A.G., Gyi, D.E., Pavitt, T., Atkinson, S. and Duff, A.R., 2005. Contributing factors in construction accidents. Applied ergonomics, 36(4), pp.401-415.

Ye, G., Jin, Z., Xia, B. and Skitmore, M., 2014. Analyzing causes for reworks in construction projects in China. Journal of Management in Engineering, 31(6), p.04014097.

Love, P.E., Teo, P., Carey, B., Sing, C.P. and Ackermann, F., 2015. The symbiotic nature of safety and quality in construction: Incidents and rework non-conformances. Safety science, 79, pp.55-62.

Download Sample

Get 100% money back after download, simply upload your unique content* of similar no. of pages or more. We verify your content and once successfully verified 100% value credited to your wallet within 7 days.

Upload Unique Document

Document Under Evaluation

Get Credits into Your Wallet

*The content must not be available online or in our existing Database to qualify as unique.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2018). Contributing Factors In Construction Accidents. Retrieved from https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.

"Contributing Factors In Construction Accidents." My Assignment Help, 2018, https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.

My Assignment Help (2018) Contributing Factors In Construction Accidents [Online]. Available from: https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents
[Accessed 02 July 2020].

My Assignment Help. 'Contributing Factors In Construction Accidents' (My Assignment Help, 2018) <https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents> accessed 02 July 2020.

My Assignment Help. Contributing Factors In Construction Accidents [Internet]. My Assignment Help. 2018 [cited 02 July 2020]. Available from: https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.


For years now, MyAssignmenthelp.com is providing affordable essay help to millions of students worldwide. Our essay assistance services have helped us in assisting students with even the toughest essay assignments. We take pride in the fact that we cater the best assistance to search terms like help me with my essay. We offer affordable services in the fastest way possible. For our fast delivering services, students trust us with their urgent essay assignment needs. Two of our most popular essay writing services are maths essay help and English essay help.

Latest Civil Engineering Samples

ARBE2301 Measurement Of Building Works 1

Download : 0 | Pages : 8
  • Course Code: ARBE2301
  • University: The University Of Newcastle
  • Country: Australia

Answer: QS2301 & Associates Pty Limited 1A University Drive CALLAGHAN NSW 2308 [Date] For the Attention of: Process and reasons for building measurement and preparation of BOQs and why there are rules for measurement I would like to take this opportunity to thank you for your interest in our services regarding reviewing your project and the undertaking that involves taking the measurements for you and other works. Like discussed befor...

Read More arrow Tags: Australia Arlington Management University of New South Wales 

CIVL3340 Structural Analysis

Downloads : 10 | Page : 1
  • Course Code: CIVL3340
  • University: Macquarie University
  • Country: Australia

Answers: Q1. Working stress method applied in reinforced concrete designs applying assumption of restricting the behaviour within elastic region. It has non- identical load combination Ultimate load method use stress-strain curves principles with safety determined by load factors. It has identical load combination Limit state method considers safety of the ultimate load, use partial safety factors. The load factor is ultimate strength...

Read More arrow Tags: Australia 22 Structural analysis Macquarie University 

SRT757 Building Systems And Environment

Downloads : 2 | Pages : 7

Answer: Introduction Call centers serve a significant role when it comes to the daily operations of utility, financial as well as technology companies besides public bodies. Reliable and relevant information is needed among the workers in the call centers on the levels of risks as well as the hazards associated with the working environment. General sources of sound in the space and their frequency ranges The main source of sound in the spac...

Read More arrow

BSU6BPA Building Pathology

Download : 0 | Pages : 14

Answer: Introduction Building defects are very common in residential, commercial and industrial buildings. The defects can occur in either old or new buildings (Bakri & Mydin, 2014). These defects have numerous safety, cost and durability implications. Presence of these defects can affect the normal functioning of the building because its occupants or visitors will be worried about their safety (Othma, et al., 2015) and som...

Read More arrow

CPCCBC5010B: Manage Construction Works Company

Download : 1 | Pages : 14
  • Course Code: CPCCBC5010B
  • University: Victoria University
  • Country: Australia

Answer: Introduction: I would like to express my sincere gratitude for  being able to achieve the targets for last year. I want to believe that lessons were learned from the mistakes that were previously made.. However, we do improve and learn from our mistakes. As the year begins, it comes along with new challenges and meaningful goals. Some of these targets and goals cannot be achieved without the contribution of each and every member ...

Read More arrow
Next
watch

Save Time & improve Grade

Just share Requriment and get customize Solution.

question
We will use e-mail only for:

arrow Communication regarding your orders

arrow To send you invoices, and other billing info

arrow To provide you with information of offers and other benefits

1,354,168

Orders

4.9/5

Overall Rating

5,080

Experts

Our Amazing Features

delivery

On Time Delivery

Our writers make sure that all orders are submitted, prior to the deadline.

work

Plagiarism Free Work

Using reliable plagiarism detection software, Turnitin.com.We only provide customized 100 percent original papers.

time

24 X 7 Live Help

Feel free to contact our assignment writing services any time via phone, email or live chat.

subject

Services For All Subjects

Our writers can provide you professional writing assistance on any subject at any level.

price

Best Price Guarantee

Our best price guarantee ensures that the features we offer cannot be matched by any of the competitors.

Our Experts

Assignment writing guide
student rating student rating student rating student rating student rating 5/5

1692 Order Completed

98% Response Time

Alfred Dodd

PhD in Computer and Information Science with specialization in Database

Wellington, New Zealand

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

285 Order Completed

99% Response Time

Eugene Baranowski

MBA in Supply Chain

London, United Kingdom

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

647 Order Completed

98% Response Time

Adlina Han

Masters in Marketing with Specialization in Branding

Singapore, Singapore

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

2279 Order Completed

97% Response Time

Zachary Perez

PhD in Computer Science and Information System

Washington, United States

Hire Me

FREE Tools

plagiarism

Plagiarism Checker

Get all your documents checked for plagiarism or duplicacy with us.

essay

Essay Typer

Get different kinds of essays typed in minutes with clicks.

edit

GPA Calculator

Calculate your semester grades and cumulative GPa with our GPA Calculator.

referencing

Chemical Equation Balancer

Balance any chemical equation in minutes just by entering the formula.

calculator

Word Counter & Page Calculator

Calculate the number of words and number of pages of all your academic documents.

Refer Just 5 Friends to Earn More than $2000

Check your estimated earning as per your ability

1

1

1

Your Approx Earning

Live Review

Our Mission Client Satisfaction

Work clearly captured the differences and benefits of various forecasting methods. I made the right decision for help!

flag

User Id: 383727 - 02 Jul 2020

Australia

student rating student rating student rating student rating student rating

at first i got the assignment in different company's name which was supposed to be Bearena pty ltd...i told them about this one and today i have received the same assignment, they have just change the company's name..rest is same...not a even single ...

flag

User Id: 410147 - 02 Jul 2020

Australia

student rating student rating student rating student rating student rating

Great work, I appreciate such an excellent work. Great APA format and references. I will recommend you to my friends.

flag

User Id: 400631 - 02 Jul 2020

Australia

student rating student rating student rating student rating student rating

Was on time .save by the bell.thank you so much.all exams was done. You guys are the best

flag

User Id: 260883 - 02 Jul 2020

Australia

student rating student rating student rating student rating student rating
callback request mobile
Have any Query?