country
$20 Bonus + 25% OFF
Securing Higher Grades Costing Your Pocket? Book Your Assignment at The Lowest Price Now!

Contributing Factors In Construction Accidents

tag 0 Download6 Pages 1,376 Words tag Add in library Click this icon and make it bookmark in your library to refer it later. GOT IT

Question:

Discuss about the Contributing Factors in Construction Accidents.
 
 

Answer:

Introduction:

The focus of discussion in the current research is to identify the relation between the project safety and the number of non-conformances and/or the volume of the rework in the construction sites. The research in the evidence based literature review indicates that there is positive relation between these two aspects, there is positive relation between the project safety as well as the non-conformances at the construction site reworks.  The current report is a focus on this exhaustive relation and the study is performing to relate these two different aspects. Also recommendations based discussion is provided with proposals to reduce the safety incidents as well as to reduce the amount of rework on construction sites.

The relationship between the safety and quality outcomes do have very limited attention in the construction and the engineering management domain. One of the main factor responsible for the development of such scenario is the fact that the contractors and the builders are not interested to reveal the sensitive information related to the reworks and the associated factors that are relating these incidents with the accidents in general. In accordance with the report presented by Love(2015), there is an extensive 31 months analysis of the relation between the incidents and rework and based on the observations it is indicated that the risk profiles for incidents and the NCRs are established with the mathematical analysis. The data indicated as high as mean ratio of incidents to rework NCRS to be 1:7. Also it is indicated that the relation between incidents and the rework NCRS (p<0.05). Similar indications are reported in other recent empirical evidence based reports; It is found that there two statistically significant relationships; the OSHA recordable rate is positively correlated to rework (r2 =0.968, p-value =0.032); Also the first aid rate is positively correlated to the number of defects (r2 = 0.548, p-value=0.009) (Wanberg, 2013).  There is indication that the most compelling reason for the strong positive correlation between rework and injuries is the fact that rework involves demolition, schedule pressure as well as unstable work processes.

Mortenson construction works have used computer automated, virtual environment technology at the Peguala Ice Arena at Penn State and in the course of time they catched and fixed the problems early. Typical tools like virtual images of mechanical systems are employed to prevent the mistakes that involve the rework in general. Reworks are increasing the construction schedules and delaying the delivery, Further reworks are contributing to the worker injuries and billions of lost revenue (Moore).

 

The problems of NCRS and reworks can be tackled with multiple dimensions. It is required that there should be sufficient care provided at the outset for the sake of exhaustive preplanning of the projects, Also there is need that there should be sufficient allocation of the resources available for completing the project, projects should be subjected to every measure that actually works on to complete the schedule in time. Also there should be strategic promotion of leadership at the work place as well workers should be encouraged to take pride in their work. Further there should be extensive considerations to be taken to encourage strategies for promoting the safety and quality. Also it is not impossible to totally avoid the scheduled delays. It is required that there should be exhaustive planning and effective contracting process to enhance the quality and safety in the work and thereby there should be means to avoid the delay in the works. There should be steep release of the funds in accordance with the project progression requirements and secondly there is need that there should be fines and penalties for the project delays and this inturn will  effect the project progression and scheduling process. Construction business is quite fast and there is need for companies to catch these recent strategies to avert the delays and the progression methodologies to avoid the delays and to keep up the competitive edge in the market(Construction drive).

Apart from these basic considerations there is need to enforce recommendation like those of ARCTM, where is there is specific reference made towards the worker’s training for the job which he is expected to make, enforcement of working conditions which are safe and accident free. Also there is considerable responsibility of the project manager there lies in enforcing better operational conditions in the work place. All of them should be followed with very detailed and specific enforcement at each and every stage of project progression (Abdelhamid,2000).It is also indicated that apart from the basic issues such as workers ignorance and contribution of the apathy of the management towards the workplace safety, there are also issues such as incompetent risk management at the work place as well as improper design of ergonomics at the construction site as well as issues such as deficiencies of the work place being employed in the workplace. All of them do have collective impact on the work place operational integrity and the operational performance (Haslam, 2005).Hwang(2014) indicated that there are several instances of reworks in the construction industry happening because of the lack of systematic planning to avert the same. Hence as per his proposal usage of knowledge based systems to record the ongoing technological progression of the construction works and approaches for elimination of the rework will provide opportunity to enhance the betterment of the organizational performance to avoid reworks in construction. Better design and KMS will contribute in this regard.  A comprehensive project management involving design management, communication management, filed management, project scope management, project process management, active rework, project plan management, external environment management etc required for minimizing the project rework in the construction industry (Ye, 2014).

Conclusion:

The evidence based research findings in relation to the empirical relation between NCRS of reworks and the accident incidents at the site indicate that there is great need to avert the escalation of conditions to the extent of safety incidents as well there is need to avoid loss of revenues to the company in the form of delayed project deliveries as well as in the form of revenue loss due to accidents and related procedural problems and obligations. At the outset there is need to change the traditional construction process monitoring methodologies to more advanced and better technology enabled processes and procedures. Also as indicated in the previous discussion always the project control should be in the hands of able leadership and there should be systematic and strategic interventions from the beginning of the project to avoid delays and expectation mismatch requirements. Also while drafting the contractual obligations there should be sufficient insight and all the terms and the regulations of the project are required to be prepared in detail so that there will be quite a good control of the project progress while preventing the happening of the delays as well as the associated problems of revenue loss from the project.

 

References:

Anon., n.d. [Online] Available at: ‘Moore P, ‘Contractors confront the growing costs of rework’, Engineering News record, 28/11/2012

Anon., n.d. [Online]  Available at: Wanberg J et al, ‘Relationship between Construction Safety and Quality Performance’, Journal of Construction Engineering Management, Volume 139, Issue 10, October 2013

Anon., n.d. [Online]  Available at: The Dotted Line: How to avoid schedule delays through careful planning, effective contracts, https://www.constructiondive.com/news/the-dotted-line-how-to-avoid-schedule-delays-through-careful-planning-eff/440167/

Abdelhamid, T.S. and Everett, J.G., 2000. Identifying root causes of construction accidents. Journal of construction engineering and management, 126(1), pp.52-60.

Hwang, B.G., Zhao, X. and Goh, K.J., 2014. Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management, 32(4), pp.698-708.

Haslam, R.A., Hide, S.A., Gibb, A.G., Gyi, D.E., Pavitt, T., Atkinson, S. and Duff, A.R., 2005. Contributing factors in construction accidents. Applied ergonomics, 36(4), pp.401-415.

Ye, G., Jin, Z., Xia, B. and Skitmore, M., 2014. Analyzing causes for reworks in construction projects in China. Journal of Management in Engineering, 31(6), p.04014097.

Love, P.E., Teo, P., Carey, B., Sing, C.P. and Ackermann, F., 2015. The symbiotic nature of safety and quality in construction: Incidents and rework non-conformances. Safety science, 79, pp.55-62.

OR

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2018). Contributing Factors In Construction Accidents. Retrieved from https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.

"Contributing Factors In Construction Accidents." My Assignment Help, 2018, https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.

My Assignment Help (2018) Contributing Factors In Construction Accidents [Online]. Available from: https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents
[Accessed 04 April 2020].

My Assignment Help. 'Contributing Factors In Construction Accidents' (My Assignment Help, 2018) <https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents> accessed 04 April 2020.

My Assignment Help. Contributing Factors In Construction Accidents [Internet]. My Assignment Help. 2018 [cited 04 April 2020]. Available from: https://myassignmenthelp.com/free-samples/contributing-factors-in-construction-accidents.


For years now, MyAssignmenthelp.com is providing affordable essay help to millions of students worldwide. Our essay assistance services have helped us in assisting students with even the toughest essay assignments. We take pride in the fact that we cater the best assistance to search terms like help me with my essay. We offer affordable services in the fastest way possible. For our fast delivering services, students trust us with their urgent essay assignment needs. Two of our most popular essay writing services are maths essay help and English essay help.

Latest Civil Engineering Samples

CPCCBC5010B: Manage Construction Works Company

Download : 0 | Pages : 14
  • Course Code: CPCCBC5010B
  • University: Victoria University
  • Country: Australia

Answer: Introduction: I would like to express my sincere gratitude for  being able to achieve the targets for last year. I want to believe that lessons were learned from the mistakes that were previously made.. However, we do improve and learn from our mistakes. As the year begins, it comes along with new challenges and meaningful goals. Some of these targets and goals cannot be achieved without the contribution of each and every member ...

Read More arrow

CPCCBC5005A Select And Manage Building And Construction Contractors

Download : 0 | Pages : 18

Answer: Part 1: Select Subcontractors It is very important to select the best subcontractor when implementing a construction project because subcontractors play a very vital role in successful completion of these projects (Hartmann, et al., 2009); (Marzouk, et al., 2013). This task involves evaluating and comparing four quotations submitted by four different companies for formwork and concrete works. The purpose of this evaluation i...

Read More arrow

DT9776 Postgraduate Diploma In Collaborative BIM

Download : 0 | Pages : 17
  • Course Code: DT9776
  • University: Dublin Institute Of Technology
  • Country: Ireland

Answer: Introduction   Much industrial research carried out shows that they are numerous activities in the construction industries, which are adding no value to them during the process of erection. A bigger percentage of those wasteful operations take too much time as well as effort, so it is upon the manager to deal with these activities that affect the construction operations negatively leading to production of dissimilar wastes. ...

Read More arrow

BNV7088 Advanced Quantification And Built Environment

Download : 0 | Pages : 6
  • Course Code: BNV7088
  • University: Birmingham University
  • Country: United Kingdom

Answer: Introduction: New Rules of Measurement 2 has been established as a set of comprehensive measurement guide for the research of either bills of quantities or Programs of Rates for both capital and repair projects (Bam & May, 2018). Advantages of New Rules of Measurement 2 bill of quantities New Rules of Measurement 2 bill of quantities has many advantages and shortcomings.  The core advantages of bill of quantities are: ...

Read More arrow

CPC50210 Diploma Of Building And Construction1

Download : 0 | Pages : 8

Answer: Introduction This assessment has been designed to allow you to provide partial evidence of your competence in the unit CPCCBC5009A Identify services layout and connection methods to medium rise construction projects. In completing your final assessments, you will show evidence of your ability to: Evaluate commonly used methods of water storage supply and layouts. Evaluate methods of sewerage and drainage disposal and their layout...

Read More arrow
Next
watch

Save Time & improve Grades

Just share your requirements and get customized solutions on time.

question
We will use e-mail only for:

arrow Communication regarding your orders

arrow To send you invoices, and other billing info

arrow To provide you with information of offers and other benefits

1,242,865

Orders

4.9/5

Overall Rating

5,067

Experts

Our Amazing Features

delivery

On Time Delivery

Our writers make sure that all orders are submitted, prior to the deadline.

work

Plagiarism Free Work

Using reliable plagiarism detection software, Turnitin.com.We only provide customized 100 percent original papers.

time

24 X 7 Live Help

Feel free to contact our assignment writing services any time via phone, email or live chat.

subject

Services For All Subjects

Our writers can provide you professional writing assistance on any subject at any level.

price

Best Price Guarantee

Our best price guarantee ensures that the features we offer cannot be matched by any of the competitors.

Our Experts

Assignment writing guide
student rating student rating student rating student rating student rating 5/5

234 Order Completed

100% Response Time

Samantha Ji

PhD in Chemistry with Specialization in Organic

Singapore, Singapore

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

1692 Order Completed

98% Response Time

Alfred Dodd

PhD in Computer and Information Science with specialization in Database

Wellington, New Zealand

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

203 Order Completed

97% Response Time

Richard Alpert

PhD in Psychology

London, United Kingdom

Hire Me
Assignment writing guide
student rating student rating student rating student rating student rating 5/5

1896 Order Completed

95% Response Time

Herman Berens

MSc in Psychology

London, United Kingdom

Hire Me

FREE Tools

plagiarism

Plagiarism Checker

Get all your documents checked for plagiarism or duplicacy with us.

essay

Essay Typer

Get different kinds of essays typed in minutes with clicks.

edit

GPA Calculator

Calculate your semester grades and cumulative GPa with our GPA Calculator.

referencing

Chemical Equation Balancer

Balance any chemical equation in minutes just by entering the formula.

calculator

Word Counter & Page Calculator

Calculate the number of words and number of pages of all your academic documents.

Refer Just 5 Friends to Earn More than $2000

Check your estimated earning as per your ability

1

1

1

Your Approx Earning

Live Review

Our Mission Client Satisfaction

Thank you so much for your efforts the solution was perfect and submitted on time.

flag

User Id: 371975 - 03 Apr 2020

Australia

student rating student rating student rating student rating student rating

every thing good and Very classy treatment. thank you very much i hope do my thesis with this web

flag

User Id: 396340 - 03 Apr 2020

Australia

student rating student rating student rating student rating student rating

The work was well present, details and met all expectations. This is a prove that I will always use this platform and recommend this site to friends at schools and family. Keep using great people to keep having users. Just after receiving this assign...

flag

User Id: 203000 - 03 Apr 2020

Australia

student rating student rating student rating student rating student rating

good transcript that it make feel good because i don\'t need to worry about no ideas to write this transcript

flag

User Id: 329158 - 03 Apr 2020

Australia

student rating student rating student rating student rating student rating
callback request mobile
Have any Query?