Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave

Unconstrained Schedule

  1. First Draft Schedule for the Project: Network Diagram, a Schedule based on time relationships only, Resource Loading, Cash Flows and the relevant write up
  2. Baseline Schedule and Developing the Baseline: process and presentation
  3. Scope Change Section
  4. Report with a professional appearance with correct grammar
  5. Project planning software files matching the 3 sections of the report

The text across the main body of the document should not exceed 10 pages (not counting tables and figures) using 12 point font, 1.5 spacing, and one inch margins all around.

Draft the initial schedule for the project by developing a network diagram, a schedule based on time relationships, resource loading, cash flows and accompanying analysis. If you think it is necessary, refine your Work Breakdown Structure (WBS) and the elemental estimates, as this is your last chance before developing the baseline schedule of the project to be submitted for implementation. If you do make any modifications, please identify them together with the reason for modification in your report.

Develop a precedence table. The precedence table must show the relationship among all the project’s activities (avoid connecting work packages or higher level deliverables) and show their start dates. Sort this table in the order which these activities need to be started. The table should  not include any deliverables. All the relationships need to be defined clearly. Comments should be provided for all relationships other than FS with no lag.

Now you can develop and present a network diagram (ND) for your project (Precedence Diagram Model or project network). The ND should be presented in the following two forms:

  • A summarized version with each node providing only the ID or WBS code for the corresponding activity. It should identify the critical path within the network for the entire project. This version should fit within one to a few pages.
  • A version showing only the critical path(s) with each node providing basic information on the corresponding critical activity. (Alternatively, the entire network with each node providing basic information on the corresponding activity can be provided. The critical path should be identified in the network. The “expanded” network can run in to tens of pages and should be provided in appendix. Printing the network on paper is discouraged in the interest of environment.)

Check your network for optimality. Question its validity. If you find that portions of the network contain a long, serial string of elements, test the logic. Verify that any two sequential elements cannot be done in parallel because the completion of the first is truly necessary before the start of the second (check the predecessors and successors relationships).

The network must have only one element at the beginning and only one element at the end. The remainder of the elements will reside on various paths that will go from the beginning to the end of the network.

Change the Scope (This is just a "what if" analysis, make sure that you keep a copy of your baseline schedule intact). After you submit the baseline the client expresses gratitude for the baseline that you developed.

The client wishes to inform you that the management is considering some changes in the specifications. This has resulted in a request for scope changes to the project. The client understands that there may be additional costs incurred for these changes. So you are asked to do a “what if” analysis and provide your recommendation for making the final decision based on this alternate scenario.

Use the constrained schedule/baseline (from section 2 in this assignment) as the starting point. Number the activities sequentially starting from 1, skipping the deliverables and summary tasks. If you have used recurring activities, number the parent recurring activity but not the children activities (i.e., the individual instances of the activity).

The scope for some items has been increased, but the scope of other items has been reduced. The impact of changes in the scope is reflected in changes to the activities, summaries of which are given below:

Determine the increase or decrease in costs for individual activities and the WBS elements that are affected by this RFC. What are the impacts of these changes? What is the cost to the project? What is the duration impact? Provide your answers, analysis, and insights.

The client has requested a copy of MS Project (or other project planning software) file with yourproject plan and a scope change report reflecting the RFC. The report should be self contained and should include supporting tables and charts from the MSP file.

Submission Format. Please submit one zipped file that includes the files listed below:

  • A report responding to everything asked for in this assignment in one PDF file.
  • The PM Software (e.g., MS Project) file with the unconstrained schedule
  • The PM Software (e.g., MS Project) file with the baseline schedule
  • The PM Software (e.g., MS Project) file with the changed scope schedule
Unconstrained Schedule

The following assignment has been made for the development of the improved analysis and project management for the utilization of the effective management of the work and aligning the functional management of activities. The following report would involve the completeness of the work and cohesive management of activities.

Task Name

Predecessors

Duration

Start

Successors

Finish

   Identify mission and Objectives,  Create Project Charter

7 days

Mon 10/8/18

4, 5

Tue 10/16/18

   Create Business Plan and Issue

3

5 days

Wed 10/17/18

7

Tue 10/23/18

   Create Project Initiation Document and Issue

3

12 days

Wed 10/24/18

Fri 11/9/18

   Soil Investigation

4

3 days

Wed 10/24/18

8, 9

Fri 10/26/18

   Architectural

7

60 days

Mon 10/29/18

Fri 2/1/19

   Structural

7

15 days

Mon 10/29/18

10

Fri 11/16/18

   Mechanical

9

10 days

Mon 11/19/18

11

Fri 11/30/18

   Electrical

10

15 days

Mon 12/3/18

14, 17

Fri 12/21/18

   Survey

11

5 days

Mon 12/24/18

15

Fri 12/28/18

   Excavation

14

10 days

Mon 12/31/18

Fri 1/11/19

      Grading

11

5 days

Mon 12/24/18

18, 19

Fri 12/28/18

      Water Control

17

29 days

Mon 12/31/18

20

Thu 2/7/19

      Erosion control

17

29 days

Mon 12/31/18

20

Thu 2/7/19

      Underground utilities

18, 19

10 days

Fri 2/8/19

23

Thu 2/21/19

      Piles (Precast)

20

14 days

Fri 2/22/19

25, 26, 49

Wed 3/13/19

         Columns (Basement - Floor 2)

23

28 days

Thu 3/14/19

32

Tue 4/30/19

         Columns (Floor 3 - 4)

23

10 days

Thu 3/14/19

28

Wed 3/27/19

         Columns (Floor 5 - 6)

28

20 days

Thu 4/11/19

30

Tue 5/14/19

         Columns (Floor 7 - 9)

26

10 days

Thu 3/28/19

27

Wed 4/10/19

         Slab -Beams (Basement - Floor 2)

27

12 days

Wed 5/15/19

31

Thu 5/30/19

         Slab-Beams (Floor 3- 4)

30

8 days

Fri 5/31/19

32

Tue 6/11/19

         Slab-Beams (Floor 5 - 6)

25, 31

8 days

Wed 6/12/19

33

Fri 6/21/19

         Slab-Beams (Floor 7 - 9)

32

8 days

Mon 6/24/19

35

Wed 7/3/19

         Roofing Trusses

33

5 days

Thu 7/4/19

36

Wed 7/10/19

         Roofing Cover

35

3 days

Wed 8/28/19

72,  73,  74

Fri 8/30/19

      Columns (Basement - Floor 2)

21

5 days

Mon 9/2/19

40

Fri 9/6/19

      Columns Floor( 3 - 4)

39

5 days

Mon 9/9/19

41,  44,  45

Fri 9/13/19

      Columns Floor( 5 - 6)

40

5 days

Mon 9/16/19

42

Fri 9/20/19

      Columns Floor( 7 - 9)

41

5 days

Mon 9/23/19

46

Fri 9/27/19

      Slab-Beams (Basement - Floor 2)

40

4 days

Mon 9/16/19

Thu 9/19/19

      Slab-Beams Floor( 3 - 4)

40

4 days

Mon 9/16/19

Thu 9/19/19

      Slab-Beams Floor( 5 - 6)

42

4 days

Mon 9/30/19

47

Thu 10/3/19

      Slab-Beams Floor( 7 - 8)

46

4 days

Fri 10/4/19

Wed 10/9/19

   Stairway (Basement - Floor 2)

23

2 days

Thu 3/14/19

50,  52,  56

Fri 3/15/19

   Stairway Floor(3 - 4)

49

2 days

Mon 3/18/19

51

Tue 3/19/19

   Stairway Floor( 5 -6)

50

4 days

Wed 3/20/19

Mon 3/25/19

   Stairway Floor( 7 - 8)

49

4 days

Mon 3/18/19

53

Thu 3/21/19

Patios

52

1 day

Fri 3/22/19

Fri 3/22/19

      Internal wall

49

30 days

Mon 3/18/19

57,  58

Fri 4/26/19

      External wall

56

45 days

Mon 4/29/19

69

Fri 6/28/19

      Screeding

56

90 days

Mon 4/29/19

60

Fri 8/30/19

   Partitions

57

55 days

Mon 7/1/19

60

Fri 9/13/19

   Dry wall

58, 69

45 days

Mon 9/16/19

62,  63,  65,  66

Fri 11/15/19

      Interior doors

60

20 days

Mon 11/18/19

64

Fri 12/13/19

      Windows

60

30 days

Mon 11/18/19

Fri 12/27/19

      Security doors

62

20 days

Mon 12/16/19

67

Fri 1/10/20

      Tiles

60

90 days

Mon 11/18/19

84

Fri 3/20/20

      Glazing works

60

40 days

Mon 11/18/19

67

Fri 1/10/20

      Decoration

66, 64

30 days

Mon 1/13/20

68

Fri 2/21/20

   Carpeting

67

50 days

Mon 2/24/20

85

Fri 5/1/20

      Plumbing systems (Main Line)

36

15 days

Mon 9/2/19

75

Fri 9/20/19

      Plumbing systems (Floor. 1-2)

36

10 days

Mon 10/21/19

74

Fri 11/1/19

      Plumbing systems (Floor. 3-4)

36, 73

10 days

Mon 11/4/19

81

Fri 11/15/19

      Plumbing systems (Floor. 4-6)

72

10 days

Mon 9/23/19

76

Fri 10/4/19

      Plumbing systems (Floor. 7-9)

75

10 days

Mon 10/7/19

78

Fri 10/18/19

   Electrical Fixtures (Distribution)

76

5 days

Mon 10/21/19

79

Fri 10/25/19

   Electrical Fixtures (Floor. 1-2)

78

10 days

Mon 10/28/19

80

Fri 11/8/19

   Electrical Fixtures (Floor. 3-4)

79

10 days

Mon 11/11/19

81

Fri 11/22/19

   Electrical Fixtures (Floor. 5-6)

74, 80

10 days

Mon 11/25/19

82

Fri 12/6/19

   Electrical Fixtures (Floor. 7-9)

81

10 days

Mon 12/9/19

84

Fri 12/20/19

   Systems Controls

65, 82

10 days

Mon 3/23/20

85

Fri 4/3/20

   Fire alarms

84, 68

10 days

Mon 5/4/20

87, 91

Fri 5/15/20

   Mechanical Fixtures (Elevators etc)

85

15 days

Mon 5/18/20

88

Fri 6/5/20

   Mechanical Fixtures (Floor 1- 4)

87

30 days

Mon 6/8/20

89

Fri 7/17/20

   Mechanical Fixtures (Floor 5- 9)

88

30 days

Mon 7/20/20

Fri 8/28/20

Access roads

85

14 days

Mon 5/18/20

92, 93

Thu 6/4/20

Signages

91

5 days

Fri 6/5/20

96

Thu 6/11/20

Parking lot

91

14 days

Fri 6/5/20

96

Wed 6/24/20

   Testing 1

92, 93

2 days

Thu 6/25/20

97,  98,  99,  100,  101,  102,  103,  104,  105

Fri 6/26/20

   Testing 2

96

2 days

Mon 6/29/20

107

Tue 6/30/20

   Testing 3

96

2 days

Wed 7/1/20

108

Thu 7/2/20

   Testing 4

96

2 days

Fri 7/3/20

109

Mon 7/6/20

   Testing 5

96

2 days

Tue 7/7/20

Wed 7/8/20

   Testing 6

96

2 days

Thu 7/9/20

Fri 7/10/20

   Testing 7

96

2 days

Mon 7/13/20

Tue 7/14/20

   Testing 8

96

2 days

Wed 7/15/20

Thu 7/16/20

   Testing 9

96

2 days

Fri 7/17/20

Mon 7/20/20

   Testing 10

96

2 days

Tue 7/21/20

Wed 7/22/20

   Inspections 1

97

1 day

Wed 7/1/20

110

Wed 7/1/20

   Inspections 2

98

1 day

Fri 7/3/20

111

Fri 7/3/20

   Inspections 3

99

1 day

Tue 7/7/20

112

Tue 7/7/20

   Inspections 4

107

1 day

Thu 7/2/20

113

Thu 7/2/20

   Inspections 5

108

1 day

Mon 7/6/20

114

Mon 7/6/20

   Inspections 6

109

1 day

Wed 7/8/20

115

Wed 7/8/20

   Inspections 7

110

1 day

Fri 7/3/20

116

Fri 7/3/20

   Inspections 8

111

1 day

Tue 7/7/20

116

Tue 7/7/20

   Inspections 9

112

1 day

Thu 7/9/20

116

Thu 7/9/20

   Inspections 10

113, 114, 115

1 day

Fri 7/10/20

Fri 7/10/20

The project had been considered for the constructing the flat complex and the utilization of the construction project management principles for the alignment of the effective and improved management process. The project has been divided into phases of planning, basement and floor works, concrete works, electrical works, quality assessment, and inspections. The construction works would be required for making sure that works can be integrated with the alignment of the successful and effective management of construction works. The duration of the projects include the following phases,

Planning: the activities included in this phase are identify mission and objectives, create project charter, create business plan and issue, and create project initiation document and issue.

Design: the design phase would include the activities of the soil investigation, architectural, structural, mechanical, and electrical.

Basement and Floors 1 – 9: The work required in basement and flooring include earthworks, survey, excavation, ground works, grading, water control, erosion control, underground utilities, structures, reinforcements, piles (precast), columns, columns (basement - floor 2), columns (floor 3 - 4), columns (floor 5 - 6), columns (floor 7 - 9), slab-beams, slab -beams (basement - floor 2), slab-beams (floor 3- 4), slab-beams (floor 5 - 6), slab-beams (floor 7 - 9), roofing, roofing trusses, roofing cover, concrete,

Columns: the columns of the flooring would be done by involving the following sub projects columns (basement - floor 2), columns floor (3 - 4), columns floor (5 - 6), columns floor (7 - 9).

Slab-Beams: the slam beams would include the slab-beams (basement - floor 2), slab-beams floor (3 - 4), slab-beams floor (5 - 6), slab-beams floor (7 - 8).

Stairway: Stairway construction would be sub sectioned into stairway (basement - floor 2), stairway floor (3 - 4), stairway floor (5 -6), and stairway floor (7 - 8).

Other works: some other construction works include patios, block wall-masonry, block wall, internal wall, external wall, screeding, interior –finishes, partitions, dry wall, insulation, interior doors, windows, security doors, tiles, glazing works, decoration, carpeting, mep systems

Plumbing: the plumbing works include plumbing systems (main line), plumbing systems (floor. 1-2), plumbing systems (floor. 3-4), plumbing systems (floor. 4-6), plumbing systems (floor. 7-9).

Electrical: the electrical works include electrical fixtures (distribution), electrical fixtures (floor. 1-2), electrical fixtures (floor. 3-4), electrical fixtures (floor. 5-6), electrical fixtures (floor. 7-9), sprinkler, systems controls, fire alarms, mechanical systems, mechanical fixtures (elevators etc), mechanical fixtures (floor 1- 4), mechanical fixtures (floor 5- 9).

Comments on Schedule: The project schedule has been developed using the adaptive framework and the implication of the works intrigued for the management of the operations. The project was schedule with 495 working days (summation of the duration of the critical activities). The work required for the completeness of the specific implication and management has been implied with the addition of the individual work packages. The summary tasks has been reduced to an optimum cost aligning the work developed for the consideration of the smart project completion. The total of the critical tasks duration were consider for the calculation of the work and implication of the work duration.

Task Name

Planned Value - PV (BCWS)

Earned Value - EV (BCWP)

AC (ACWP)

SV

CV

EAC

BAC

VAC

 Identify mission and Objectives, Create Project Charter

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

 Create Business Plan and Issue

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

 Create Project Initiation Document and Issue

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

 Soil Investigation

$0.00

$0.00

$0.00

$0.00

$0.00

$17,496.00

$0.00

($17,496.00)

 Architectural

$0.00

$0.00

$0.00

$0.00

$0.00

$25,416.00

$0.00

($25,416.00)

 Structural

$0.00

$0.00

$0.00

$0.00

$0.00

$23,640.00

$0.00

($23,640.00)

 Mechanical

$0.00

$0.00

$0.00

$0.00

$0.00

$18,072.00

$0.00

($18,072.00)

 Electrical

$0.00

$0.00

$0.00

$0.00

$0.00

$23,640.00

$0.00

($23,640.00)

 Survey

$0.00

$0.00

$0.00

$0.00

$0.00

$15,000.00

$0.00

($15,000.00)

 Excavation

$0.00

$0.00

$0.00

$0.00

$0.00

$21,200.00

$0.00

($21,200.00)

Grading

$0.00

$0.00

$0.00

$0.00

$0.00

$24,360.00

$0.00

($24,360.00)

Water Control

$0.00

$0.00

$0.00

$0.00

$0.00

$4,200.00

$0.00

($4,200.00)

Erosion control

$0.00

$0.00

$0.00

$0.00

$0.00

$6,000.00

$0.00

($6,000.00)

Underground utilities

$0.00

$0.00

$0.00

$0.00

$0.00

$28,000.00

$0.00

($28,000.00)

Piles (Precast)

$0.00

$0.00

$0.00

$0.00

$0.00

$3,651,832.00

$0.00

($3,651,832.00)

 Columns (Basement - Floor 2)

$0.00

$0.00

$0.00

$0.00

$0.00

$212,192.00

$0.00

($212,192.00)

 Columns (Floor 3 - 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$158,200.00

$0.00

($158,200.00)

 Columns (Floor 5 - 6)

$0.00

$0.00

$0.00

$0.00

$0.00

$111,760.00

$0.00

($111,760.00)

 Columns (Floor 7 - 9)

$0.00

$0.00

$0.00

$0.00

$0.00

$88,540.00

$0.00

($88,540.00)

 Slab -Beams (Basement - Floor 2)

$0.00

$0.00

$0.00

$0.00

$0.00

$143,496.00

$0.00

($143,496.00)

 Slab-Beams (Floor 3- 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$105,734.00

$0.00

($105,734.00)

 Slab-Beams (Floor 5 - 6)

$0.00

$0.00

$0.00

$0.00

$0.00

$75,524.00

$0.00

($75,524.00)

 Slab-Beams (Floor 7 - 9)

$0.00

$0.00

$0.00

$0.00

$0.00

$60,419.00

$0.00

($60,419.00)

 Roofing Trusses

$0.00

$0.00

$0.00

$0.00

$0.00

$32,000.00

$0.00

($32,000.00)

 Roofing Cover

$0.00

$0.00

$0.00

$0.00

$0.00

$5,312.00

$0.00

($5,312.00)

Columns (Basement - Floor 2)

$0.00

$0.00

$0.00

$0.00

$0.00

$25,565.00

$0.00

($25,565.00)

Columns Floor( 3 - 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$13,060.00

$0.00

($13,060.00)

Columns Floor( 5 - 6)

$0.00

$0.00

$0.00

$0.00

$0.00

$13,060.00

$0.00

($13,060.00)

Columns Floor( 7 - 9)

$0.00

$0.00

$0.00

$0.00

$0.00

$14,860.00

$0.00

($14,860.00)

Slab-Beams (Basement - Floor 2)

$0.00

$0.00

$0.00

$0.00

$0.00

$18,704.00

$0.00

($18,704.00)

Slab-Beams Floor( 3 - 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$29,466.50

$0.00

($29,466.50)

Slab-Beams Floor( 5 - 6)

$0.00

$0.00

$0.00

$0.00

$0.00

$13,681.50

$0.00

($13,681.50)

Slab-Beams Floor( 7 - 8)

$0.00

$0.00

$0.00

$0.00

$0.00

$24,341.50

$0.00

($24,341.50)

 Stairway (Basement - Floor 2)

$0.00

$0.00

$0.00

$0.00

$0.00

$11,991.50

$0.00

($11,991.50)

 Stairway Floor(3 - 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$5,021.50

$0.00

($5,021.50)

 Stairway Floor( 5 -6)

$0.00

$0.00

$0.00

$0.00

$0.00

$11,991.50

$0.00

($11,991.50)

 Stairway Floor( 7 - 8)

$0.00

$0.00

$0.00

$0.00

$0.00

$11,991.50

$0.00

($11,991.50)

Patios

$0.00

$0.00

$0.00

$0.00

$0.00

$3,101.00

$0.00

($3,101.00)

Internal wall

$0.00

$0.00

$0.00

$0.00

$0.00

$375,000.00

$0.00

($375,000.00)

External wall

$0.00

$0.00

$0.00

$0.00

$0.00

$425,000.00

$0.00

($425,000.00)

Screeding

$0.00

$0.00

$0.00

$0.00

$0.00

$287,280.00

$0.00

($287,280.00)

 Partitions

$0.00

$0.00

$0.00

$0.00

$0.00

$77,223.00

$0.00

($77,223.00)

 Dry wall

$0.00

$0.00

$0.00

$0.00

$0.00

$85,000.00

$0.00

($85,000.00)

Interior doors

$0.00

$0.00

$0.00

$0.00

$0.00

$12,460.00

$0.00

($12,460.00)

Windows

$0.00

$0.00

$0.00

$0.00

$0.00

$18,080.00

$0.00

($18,080.00)

Security doors

$0.00

$0.00

$0.00

$0.00

$0.00

$12,400.00

$0.00

($12,400.00)

Tiles

$0.00

$0.00

$0.00

$0.00

$0.00

$107,605.00

$0.00

($107,605.00)

Glazing works

$0.00

$0.00

$0.00

$0.00

$0.00

$32,720.00

$0.00

($32,720.00)

Decoration

$0.00

$0.00

$0.00

$0.00

$0.00

$280,000.00

$0.00

($280,000.00)

 Carpeting

$0.00

$0.00

$0.00

$0.00

$0.00

$31,600.00

$0.00

($31,600.00)

Plumbing systems (Main Line)

$0.00

$0.00

$0.00

$0.00

$0.00

$9,760.00

$0.00

($9,760.00)

Plumbing systems (Floor. 1-2)

$0.00

$0.00

$0.00

$0.00

$0.00

$7,840.00

$0.00

($7,840.00)

Plumbing systems (Floor. 3-4)

$0.00

$0.00

$0.00

$0.00

$0.00

$7,840.00

$0.00

($7,840.00)

Plumbing systems (Floor. 4-6)

$0.00

$0.00

$0.00

$0.00

$0.00

$7,840.00

$0.00

($7,840.00)

Plumbing systems (Floor. 7-9)

$0.00

$0.00

$0.00

$0.00

$0.00

$7,840.00

$0.00

($7,840.00)

 Electrical Fixtures (Distribution)

$0.00

$0.00

$0.00

$0.00

$0.00

$28,000.00

$0.00

($28,000.00)

 Electrical Fixtures (Floor. 1-2)

$0.00

$0.00

$0.00

$0.00

$0.00

$18,840.00

$0.00

($18,840.00)

 Electrical Fixtures (Floor. 3-4)

$0.00

$0.00

$0.00

$0.00

$0.00

$18,840.00

$0.00

($18,840.00)

 Electrical Fixtures (Floor. 5-6)

$0.00

$0.00

$0.00

$0.00

$0.00

$18,840.00

$0.00

($18,840.00)

 Electrical Fixtures (Floor. 7-9)

$0.00

$0.00

$0.00

$0.00

$0.00

$18,840.00

$0.00

($18,840.00)

 Systems Controls

$0.00

$0.00

$0.00

$0.00

$0.00

$25,000.00

$0.00

($25,000.00)

 Fire alarms

$0.00

$0.00

$0.00

$0.00

$0.00

$10,740.00

$0.00

($10,740.00)

 Mechanical Fixtures (Elevators etc)

$0.00

$0.00

$0.00

$0.00

$0.00

$95,000.00

$0.00

($95,000.00)

 Mechanical Fixtures (Floor 1- 4)

$0.00

$0.00

$0.00

$0.00

$0.00

$88,950.00

$0.00

($88,950.00)

 Mechanical Fixtures (Floor 5- 9)

$0.00

$0.00

$0.00

$0.00

$0.00

$88,000.00

$0.00

($88,000.00)

Access roads

$0.00

$0.00

$0.00

$0.00

$0.00

$877,616.00

$0.00

($877,616.00)

Signages

$0.00

$0.00

$0.00

$0.00

$0.00

$2,000.00

$0.00

($2,000.00)

Parking lot

$0.00

$0.00

$0.00

$0.00

$0.00

$827,616.00

$0.00

($827,616.00)

 Testing 1

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 2

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 3

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 4

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 5

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 6

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 7

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 8

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 9

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Testing 10

$0.00

$0.00

$0.00

$0.00

$0.00

$5,592.00

$0.00

($5,592.00)

 Inspections 1

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 2

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 3

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 4

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 5

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 6

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 7

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 8

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 9

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

 Inspections 10

$0.00

$0.00

$0.00

$0.00

$0.00

$7,064.00

$0.00

($7,064.00)

Precedence Table

Cash flow Report- in the above diagrams it is clear that the implication of the resource estimation using the management of the works and the implication of the smart management processing. The resource management has been implied   with the consideration for the management of the smart and effective implication development. The most of the resource expenditure has been done in the month of February-March of 2019 and May-June of 2020. The implication would also be resulted for the management of the activities for taking care of the work related to the implication of the work and forming the management process. The development of the factors and implication of works and it would allow the calculation of the effective management process.  The resource usage has shown the cost estimates and the probable management of the factors aligning the work development and formation of the specific implication. The management has been implied with the consideration of the resource management and processing.  The alignment would be effectively managed with the work developed and aligned with the significant development.

The resources of the project has been non-uniformly distributed across the timeline and work scheduled. The bar graphs have been helpful for aligning with the formation of the works and utilization of the smart project alignment. The non-uniform deposition of the specific resources over the period of time.  The requirement of the works has been diverse and it has resulted in forming the management of the specific work requirements for the users. The different level of requirements of the factors for aligning the management work development.

Resource management can be implied with the help of the resource distribution and the management of the works and implying the utilization of work for the implication. The confinement of the works with the completeness management of the resources would be effective. It is possible that the process of refining the resources and distributing the works would be implied successfully. The alignment and the work distribution has been managed with the confinement of the work developing the implication of the smart project resource management.

Task Mode

WBS

Task Name

% Complete

Duration

Auto Scheduled

0

Project Apex_first 25

24%

495 days

Auto Scheduled

1

   Preliminaries

99%

85 days

Auto Scheduled

1.1

      Planning

99%

25 days

Auto Scheduled

1.1.1

         Identify mission and Objectives, Create Project Charter

100%

7 days

Auto Scheduled

1.1.2

         Create Business Plan and Issue

100%

5 days

Auto Scheduled

1.1.3

         Create Project Initiation Document and Issue

99%

12 days

Auto Scheduled

1.2

      Design

100%

73 days

Auto Scheduled

1.1

         Soil Investigation

100%

3 days

Auto Scheduled

1.2

         Architectural

100%

60 days

Auto Scheduled

1.2.3

         Structural

100%

15 days

Auto Scheduled

1.2.4

         Mechanical

100%

10 days

Auto Scheduled

1.2.5

         Electrical

100%

15 days

Auto Scheduled

2

   Basement and Floors 1 - 9

16%

440 days

Auto Scheduled

2.1

      Earthworks

100%

44 days

Auto Scheduled

2.1.1

         Survey

100%

5 days

Auto Scheduled

2.1.2

         Excavation

100%

10 days

Auto Scheduled

2.1.3

         Groundworks

100%

44 days

Auto Scheduled

2.1.3.1

            Grading

100%

5 days

Auto Scheduled

2.1.3.2

            Water Control

100%

29 days

Auto Scheduled

2.1.3.3

            Erosion control

100%

29 days

Auto Scheduled

2.1.3.4

            Underground utilities

100%

10 days

Auto Scheduled

2.2

      Structures

37%

136 days

Auto Scheduled

2.2.1

         Reinforcements

37%

136 days

Auto Scheduled

2.2.1.1

            Piles (Precast)

100%

14 days

Auto Scheduled

2.2.1.2

            Columns

47%

44 days

Auto Scheduled

2.2.1.2.1

               Columns (Basement - Floor 2)

50%

28 days

Auto Scheduled

2.2.1.2.2

               Columns (Floor 3 - 4)

100%

10 days

Auto Scheduled

2.2.1.2.3

               Columns (Floor 5 - 6)

0%

20 days

Auto Scheduled

2.2.1.2.4

               Columns (Floor 7 - 9)

80%

10 days

Auto Scheduled

2.3.3

      Stairway

100%

8 days

Auto Scheduled

2.3.3.1

         Stairway (Basement - Floor 2)

100%

2 days

Auto Scheduled

2.3.3.2

         Stairway Floor(3 - 4)

100%

2 days

Auto Scheduled

2.3.3.3

         Stairway Floor( 5 -6)

100%

4 days

Auto Scheduled

2.3.3.4

         Stairway Floor( 7 - 8)

100%

4 days

Auto Scheduled

2.3.4

      Patios

100%

1 day

Task Mode

WBS

Task Name

% Complete

Auto Scheduled

0

Project Apex_last 25

74%

Auto Scheduled

1

   Preliminaries

99%

Auto Scheduled

1.1

      Planning

99%

Auto Scheduled

1.1.1

         Identify mission and Objectives, Create Project Charter

100%

Auto Scheduled

1.1.2

         Create Business Plan and Issue

100%

Auto Scheduled

1.1.3

         Create Project Initiation Document and Issue

99%

Auto Scheduled

1.2

      Design

100%

Auto Scheduled

1.1

         Soil Investigation

100%

Auto Scheduled

1.2

         Architectural

100%

Auto Scheduled

1.2.3

         Structural

100%

Auto Scheduled

1.2.4

         Mechanical

100%

Auto Scheduled

1.2.5

         Electrical

100%

Auto Scheduled

2

   Basement and Floors 1 - 9

75%

Auto Scheduled

2.1

      Earthworks

100%

Auto Scheduled

2.1.1

         Survey

100%

Auto Scheduled

2.1.2

         Excavation

100%

Auto Scheduled

2.1.3

         Groundworks

100%

Auto Scheduled

2.1.3.1

            Grading

100%

Auto Scheduled

2.1.3.2

            Water Control

100%

Auto Scheduled

2.1.3.3

            Erosion control

100%

Auto Scheduled

2.1.3.4

            Underground utilities

100%

Auto Scheduled

2.2

      Structures

100%

Auto Scheduled

2.2.1

         Reinforcements

100%

Auto Scheduled

2.2.1.1

            Piles (Precast)

100%

Auto Scheduled

2.2.1.2

            Columns

100%

Auto Scheduled

2.2.1.2.1

               Columns (Basement - Floor 2)

100%

Auto Scheduled

2.2.1.2.2

               Columns (Floor 3 - 4)

100%

Auto Scheduled

2.2.1.2.3

               Columns (Floor 5 - 6)

100%

Auto Scheduled

2.2.1.2.4

               Columns (Floor 7 - 9)

100%

Auto Scheduled

2.2.1.3

            Slab-Beams

100%

Auto Scheduled

2.2.1.3.1

               Slab -Beams (Basement - Floor 2)

100%

Auto Scheduled

2.2.1.3.2

               Slab-Beams (Floor 3- 4)

100%

Auto Scheduled

2.2.1.3.3

               Slab-Beams (Floor 5 - 6)

100%

Auto Scheduled

2.2.1.3.4

               Slab-Beams (Floor 7 - 9)

100%

Auto Scheduled

2.2.1.4

            Roofing

100%

Auto Scheduled

2.2.1.4.1

               Roofing Trusses

100%

Auto Scheduled

2.2.1.4.2

               Roofing Cover

100%

Auto Scheduled

2.3

      Concrete

100%

Auto Scheduled

2.3.1

         Columns

100%

Auto Scheduled

2.3.1.1

            Columns (Basement - Floor 2)

100%

Auto Scheduled

2.3.1.2

            Columns Floor( 3 - 4)

100%

Auto Scheduled

2.3.1.3

            Columns Floor( 5 - 6)

100%

Auto Scheduled

2.3.1.4

            Columns Floor( 7 - 9)

100%

Auto Scheduled

2.3.2

         Slab-Beams

100%

Auto Scheduled

2.3.2.1

            Slab-Beams (Basement - Floor 2)

100%

Auto Scheduled

2.3.2.2

            Slab-Beams Floor( 3 - 4)

100%

Auto Scheduled

2.3.2.3

            Slab-Beams Floor( 5 - 6)

100%

Auto Scheduled

2.3.2.4

            Slab-Beams Floor( 7 - 8)

100%

Auto Scheduled

2.3.3

      Stairway

100%

Auto Scheduled

2.3.3.1

         Stairway (Basement - Floor 2)

100%

Auto Scheduled

2.3.3.2

         Stairway Floor(3 - 4)

100%

Auto Scheduled

2.3.3.3

         Stairway Floor( 5 -6)

100%

Auto Scheduled

2.3.3.4

         Stairway Floor( 7 - 8)

100%

Auto Scheduled

2.3.4

      Patios

100%

Auto Scheduled

2.3.4

      Blockwall-Masonry

100%

Auto Scheduled

2.4.1

         Bockwall

100%

Auto Scheduled

2.4.1.1

            Internal wall

100%

Auto Scheduled

2.4.1.2

            External wall

100%

Auto Scheduled

2.4.1.3

            Screeding

100%

Auto Scheduled

2.5

      Interior -Finishes

59%

Auto Scheduled

2.5..5

         Partitions

100%

Auto Scheduled

2.5.1

         Dry wall

100%

Auto Scheduled

2.5.2

         Insulation

55%

Auto Scheduled

2.5.2.1

            Interior doors

100%

Auto Scheduled

2.5.2.2

            Windows

100%

Auto Scheduled

2.5.2.3

            Security doors

60%

Auto Scheduled

2.5.2.4

            Tiles

36%

Auto Scheduled

2.5.2.5

            Glazing works

80%

Auto Scheduled

2.5.2.6

            Decoration

0%

Auto Scheduled

2.5.4

         Carpeting

0%

Auto Scheduled

2.6

      MEP systems

100%

Auto Scheduled

2.6.1

         Plumbing

100%

Auto Scheduled

2.6.1.1

            Plumbing systems (Main Line)

100%

Auto Scheduled

2.6.1.2

            Plumbing systems (Floor. 1-2)

100%

Auto Scheduled

2.6.1.3

            Plumbing systems (Floor. 3-4)

100%

Auto Scheduled

2.6.1.4

            Plumbing systems (Floor. 4-6)

100%

Auto Scheduled

2.6.1.5

            Plumbing systems (Floor. 7-9)

100%

Auto Scheduled

2.6.2

      Electrical

100%

Auto Scheduled

2.6.2.1

         Electrical Fixtures (Distribution)

100%

Auto Scheduled

2.6.2.2

         Electrical Fixtures (Floor. 1-2)

100%

Auto Scheduled

2.6.2.3

         Electrical Fixtures (Floor. 3-4)

100%

Auto Scheduled

2.6.2.4

         Electrical Fixtures (Floor. 5-6)

100%

Auto Scheduled

2.6.2.5

         Electrical Fixtures (Floor. 7-9)

100%

Conclusion

The assignment had include the construction works of making sure that the work gas been implied with the utilization of the successive management works. The alignment had been helpful for maintaining the works and it would be helpful for aligning the works and improving the management process.

References

Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project Management Institute.

Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach. Routledge.

Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management: The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.

Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.

Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and technology. Routledge.

Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.

Walker, A. (2015). Project management in construction. John Wiley & Sons.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2021). Project Management Essay: Developing A Network Diagram And Schedule.. Retrieved from https://myassignmenthelp.com/free-samples/dnsc6262-directed-computational-project-management/planning-scheduling-and-controlling.html.

"Project Management Essay: Developing A Network Diagram And Schedule.." My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/dnsc6262-directed-computational-project-management/planning-scheduling-and-controlling.html.

My Assignment Help (2021) Project Management Essay: Developing A Network Diagram And Schedule. [Online]. Available from: https://myassignmenthelp.com/free-samples/dnsc6262-directed-computational-project-management/planning-scheduling-and-controlling.html
[Accessed 25 April 2024].

My Assignment Help. 'Project Management Essay: Developing A Network Diagram And Schedule.' (My Assignment Help, 2021) <https://myassignmenthelp.com/free-samples/dnsc6262-directed-computational-project-management/planning-scheduling-and-controlling.html> accessed 25 April 2024.

My Assignment Help. Project Management Essay: Developing A Network Diagram And Schedule. [Internet]. My Assignment Help. 2021 [cited 25 April 2024]. Available from: https://myassignmenthelp.com/free-samples/dnsc6262-directed-computational-project-management/planning-scheduling-and-controlling.html.

Get instant help from 5000+ experts for
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing: Proofread your work by experts and improve grade at Lowest cost

loader
250 words
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Plagiarism checker
Verify originality of an essay
essay
Generate unique essays in a jiffy
Plagiarism checker
Cite sources with ease
support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close