whatsapp

Connect on Whatsapp : +97143393999, Uninterrupted Access, 24x7 Availability, 100% Confidential. Connect Now

Securing Higher Grades Costing Your Pocket? Book Your Assignment at The Lowest Price Now!
loader
Add File

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!

ISYS5003 Technological Infrastructure

tag 0 Download 17 Pages / 4,089 Words tag 15-11-2020
  • Course Code: ISYS5003
  • University: Curtin University
    icon

    MyAssignmentHelp.com is not sponsored or endorsed by this college or university

  • Country: Australia

Question:

Submission: 1. Submit your completed Final Report Assignment to the Assignment blackboard link under the Assessment Folder. The link is named Technological Infrastructure Assignment – Semester 1 – 2018. 2. Also submit your completed Assignment to the Technological Infrastructure – Assignment TurnItIn link. 3. Electronic Presentations will also be submitted to the Assignment blackboard link under the Assessment Folder. The link is named Technological Infrastructure – Presentation – Semester 1 – 2018. 4. Instructions on how to upload your Assignment are available on blackboard, please check the Learning Hub: Guide to your online Assignments link. Submission Format:
 
• Please use the following naming conventions for your submissions: o TI-FINAL-REPORT-S1-2018-StudentNameStudentID o TI-PRESENTATION-S1-2018-StudentNameStudentID Assignment Weighting:
• The assignment is worth 35% of your final grade. (Final Report – 20% | Presentation – 15%) Final Report Format Requirements: • Font: Calibri
• Font Size: 11pt (normal text) 12pt bold (minor headings) 14pt bold (major headings)
• Font Spacing: 1.5 line spacing
• Page numbering: Right Aligned Bottom - Footer
• Header Format: 8pt, Right Aligned
• Approximately 3,000 to 3,500 words in length, excluding diagrams; appendices; and references.
• The assignment should contain no less than two academic journal references. Chicago Referencing required. Presentation Requirements
 
 
• All presentations must be completed in MS PowerPoint format
• You are expected to present a 5-minute presentation that covers your recommended design and solution to the Case Study provided. Important Tips:
• Spell and Grammar Check your Assignment
• Avoid Plagiarism (Please refer to Page 7 of the Unit Outline) Plagiarism detection software will be used to detect plagiarism.
• The majority (95%) of your written work should be your own words. Technological Infrastructure | Final Report and Presentation | Semester 1 - 2018 2 |
 
P a g e Case Study – Western Australia Local Government The City of Mandurah is a popular retirement destination for many West Australians, favoured for its coastal lifestyle it has seen the population double in the past 15years. The surge in population has put great strain on the current City of Mandurah Council services and infrastructure. The CEO of the City of Mandurah Council has requested your consultancy service to address IT issues, capacity planning and network issues. The City of Mandurah has many services geographically dispersed across the region that includes suburbs such as Madora Bay, Silver Sands, San Remo, Dawesville, Bouvard and Falcon. As a result, the following buildings and services are dispersed throughout the city: Mandurah Head Office, Mandurah Aquatic and Recreation Centre, Mandurah Library, Falcon Library, Mandurah Museum, Mandurah Seniors and Community Centre, and Mandurah Waste Management Centre.
 
Current IT Infrastructure Currently the head office is the only location with any IT infrastructure in place. The head office has 40 desktop computers, 1 multifunctional printer, 1 Domain Controller, 1 File Server and 1 Print Server. In addition, the head office also has 48 Cat5 Communication Ports, 1 Cisco 48 port switch, 1 Cisco router and 1 ADLS2 Internet Connection. All other offices and building do not have any IT infrastructure in place. Criteria to be addressed for proposed IT Network Infrastructure You are expected to design a IT network infrastructure that addresses the following criteria.
 
 
• The City of Mandurah intends to connect all of the existing external offices (both libraries, aquatic and recreation centre, museum, seniors and community centre, and waste management centre) to the head office via a fast internet connection, to allow data sharing, and access to council IT applications.
• All external offices are expected to have at least 5 networked computers and printing services.
• All external offices will allow staff to login to the head office remotely.
• The Council expects to introduce IP Phone facilities to all offices by 2020. • All IT services and infrastructure will be centralised at the head office.
• Mandurah is a popular destination and it is expected that the population will double again over the next ten years, and as a result the infrastructure should include allowances for expansion. Technological Infrastructure | Final Report and Presentation | Semester 1 - 2018 3 | P a g e Report .
 
Requirements: You are to propose a detailed high-level network solution that addresses the Criteria of the City of Mandurah and the report should cover the following: 1. A set of detailed network diagrams that shows the proposed network infrastructure. (ULO 3) 2. An analysis, recommendation and justification of Local Area Network Technology and Infrastructure required. (ULO 2) 3. An analysis, recommendation and justification of Wide Area Network Technology and Infrastructure. (ULO 2) 4. A list of hardware and software specifications for all Servers, Workstations, Printers, Tablets and Networking Devices (including NOS and application software). (ULO 2) 5. A plan of how you would address any Security concerns in relation to the operating systems and network. (ULO 1) You should ensure that all components in the proposed infrastructure would work together effectively.
 
 
• Any assumptions you make should be documented.
• Green IT technologies should be considered in your design.
• Explanatory notes should be provided detailing why specific technology choices have been made.
• As a consultant you should draw on your expertise to advise the Council when necessary. If, in your professional opinion, there are requirements which have not been specified but you feel should be included, you should include them in your recommendations. (ULO 1)
 
• Information transmitted between the external offices could be sensitive, and therefore you should address any potential security concerns. PLEASE NOTE THIS FINAL REPORT FULLFILLS THE REQUIREMENTS FOR THE UNIT. IN PARTICULAR THIS ASSIGNMENT COVERS THE FOLLOWING UNIT LEARNING OUTCOMES AS LISTED IN THE UNIT OUTLINE ULO 1: Design and recommend appropriate Information Technology infrastructure for a range of organization types and circumstances ULO 2: Design and develop the technical infrastructure required for a real client application ULO 3: Evaluate and produce network design information Technological Infrastructure | Final Report and Presentation | Semester 1 - 2018 4 | P a g e Presentation Requirements You are expected to present your chosen IT Infrastructure design to the class in the form of a Formal Presentation. The presentation is expected to cover at least the following: 1. Introduction Slide / Agenda 2. A set of detailed network diagrams that shows the proposed network infrastructure. (ULO 3) 3. The local area network technologies you decided to choose and the reasoning. (ULO 2) 4. The wide area network technologies you decided to choose and the reasoning. (ULO2) 5.
 
The hardware and software specifications you decided to choose and the reasoning. (ULO 2) 6. Security concerns and how you would ensure security of the network. (ULO 1) 7. Assumptions / Green IT 8. Summary / Lessons Learnt / Recommendations. Please Note: You have a maximum of 5 minutes to present your design. You will be penalised if you exceed your overall time allocation of 5 minutes. PLEASE NOTE THIS PRESENTATION FULFILLS THE REQUIREMENTS FOR THE UNIT. IN PARTICULAR THIS ASSIGNMENT COVERS THE FOLLOWING UNIT LEARNING OUTCOMES AS LISTED IN THE UNIT OUTLINE ULO 1: Design and recommend appropriate Information Technology infrastructure for a range of organization types and circumstances ULO 2: Design and develop the technical infrastructure required for a real client application ULO 3: Evaluate and produce network design information
Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

Upload
Unique Document

Document
Under Evaluation

Get Money
into Your Wallet

Total 17 pages

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2020). Technological Infrastructure. Retrieved from https://myassignmenthelp.com/free-samples/isys5003-technological-infrastructure/it-issues.html.

My Assignment Help (2020) Technological Infrastructure [Online]. Available from: https://myassignmenthelp.com/free-samples/isys5003-technological-infrastructure/it-issues.html
[Accessed 20 August 2022].

My Assignment Help. 'Technological Infrastructure' (My Assignment Help, 2020) <https://myassignmenthelp.com/free-samples/isys5003-technological-infrastructure/it-issues.html> accessed 20 August 2022.

My Assignment Help. Technological Infrastructure [Internet]. My Assignment Help. 2020 [cited 20 August 2022]. Available from: https://myassignmenthelp.com/free-samples/isys5003-technological-infrastructure/it-issues.html.


We Can Help!

Get top notch assistance from our best tutors !
Excel in your academics & career in one easy click!

icon

Other Samples

Content Removal Request

If you are the original writer of this content and no longer wish to have your work published on Myassignmenthelp.com then please raise the content removal request.

icon

5% Cashback

On APP - grab it while it lasts!

Download app now (or) Scan the QR code

*Offer eligible for first 3 orders ordered through app!

screener
ribbon
callback request mobile
Have any Query?