The report focuses on a case study related to rapid prototyping. The aim of this report is to highlight the project management issues of the case study. Frank Billing dreamt of building of rapid prototyping [1]. His dream job was to work for a rapid prototype machine development as he realized its potential in the marketplace. After completion of the Engineering degree, he went for a job at Cocable to clear his debts and school loans. After working with the company for three years, he finally got the chance to work on rapid prototyping. The Case study assessment is elaborated in the following paragraphs.
Frank worked day and night for three months to build the machines according to the specifications. However, the machine failed to perform in its test run although it was built according to the specification. This mainly occurred because of a problem detected in the CAD model. The length of the model was 62 inches long, while the actual length should have been 55 inches. This made the project fail drastically and redesigning of the RP machines would have taken a lot of time and money. This resulted in entire project running late and in over budget. Therefore, lesson learnt from this case is that, it is utmost essential to have a clear picture of the requirements and specifications of a particular project.
The possible causes of the problem is listed below-
1) Frank’s machines were optimized for a length of 48 inches and 55 inches were marked to be the safe length. 62 inches went outside the range.
2) The machines if redesigned would have required different processors, actuators and adhesion process, which would have gone out of budget [2].
3) A proper project management plan was not considered for developing the prototype model.
4) Thorough research about the specification of the project was not properly performed before the project initiation.
5) The project requirements were not properly clarified. The specification of the rapid Prototyping machines were given to Frank and he right away started working on it without clarifying the requirements with the company further [3].
6) The scope of the project was not clearly defined. Frank did not take any follow up with the company after initiating the work on the project. This was one of the major causes of the problems faced with the project. It was essential to ensure that the project scope is correct by developing a proper project plan and strategic approach to the development of the rapid prototype machines. This was significantly important since the machines were to be built for airplane engines and there could not be any room for error [4].
7) Another major cause of the project failure was the tight schedule. Developing the machines according to the specifications was essential and they were needed to be perfect. Developing a perfect product requires a considerable amount of time that was not given to Frank. Frank worked day and night to build the machines and the tight schedule left little room for undergoing a proper testing phase.
8) The machines were not tested before the test run. System testing is necessary for every product to be developed as it reveals the bugs present in a system. Frank was not entirely at fault for this issue as it was not possible to perform proper testing procedures of the machines. However, being a developer, he should have considered performing at least the essential testing phases of the machine development. This could have saved him from the embarrassment, and time loss [5].
After considering the probable causes of the problem, it can be well understood that it was fault of the entire project management team. Lack of proper project management plan and systemic methodologies was the source of the problem. Therefore, the payment for the changes should be Cocable and Frank can be charged a fine for not following the specifications of the machine properly [6].
Steps that could have been taken to avoid the problems stated above are listed below-
1) Cocable should have held regular meetings with Frank to know about the project progress. This could have helped in identifying the problem in the initial phase of development.
2) Frank should have clarified the specification with the company before initiating the project
3) Frank should have developed a proper project management plan before project initiation. This could have helped in identifying the tight schedule of the project and could have helped him in clarifying for extra time.
4) The project should not have been done in a tight schedule as it was mainly built for an airplane and the perfection of the machines was important.
5) Cocable should have given this project to an experienced RP machine developer [7].
Therefore, from the above discussion, it can be concluded that there were a varied number of loophole in the project management and execution of the project. The problem with the newly developed rapid prototype machines could have been identified in the development stage if proper testing of the machines were performed. This could have also saved Cocable from significant loss of time and money. Frank did a mistake of knot crosschecking the specifications and the testing the RP machine he was building. The damage could have been controlled or avoided if the project was not executed in a tight schedule
I. Campbell, D. Bourell and I. Gibson, "Additive manufacturing: rapid prototyping comes of age", Rapid Prototyping Journal, vol. 18, no. 4, pp. 255-258, 2012.
Pham, Duc, and Stefan S. Dimov. Rapid manufacturing. Springer Science & Business Media, 2012.
H. Kerzner, Project management. Hoboken, New Jersey: John Wiley & Sons, Inc, 2017.
Mirza, Muhammad Nabeel, Zohreh Pourzolfaghar, and Mojde Shahnazari. "Significance of scope in project success." Procedia Technology 9 (2013): 722-729.
Larson, Erik W., and Clifford Gray. Project Management. McGraw-Hill, 2013.
Young, Trevor L. Successful project management. Vol. 52. Kogan Page Publishers, 2013.
Pham, Duc, and Stefan S. Dimov. Rapid manufacturing. Springer Science & Business Media, 2012.
To export a reference to this article please select a referencing stye below:
My Assignment Help. (2018). Rapid Prototyping Comes Of Age. Retrieved from https://myassignmenthelp.com/free-samples/rapid-prototyping-comes-of-age.
"Rapid Prototyping Comes Of Age." My Assignment Help, 2018, https://myassignmenthelp.com/free-samples/rapid-prototyping-comes-of-age.
My Assignment Help (2018) Rapid Prototyping Comes Of Age [Online]. Available from: https://myassignmenthelp.com/free-samples/rapid-prototyping-comes-of-age
[Accessed 26 January 2021].
My Assignment Help. 'Rapid Prototyping Comes Of Age' (My Assignment Help, 2018) <https://myassignmenthelp.com/free-samples/rapid-prototyping-comes-of-age> accessed 26 January 2021.
My Assignment Help. Rapid Prototyping Comes Of Age [Internet]. My Assignment Help. 2018 [cited 26 January 2021]. Available from: https://myassignmenthelp.com/free-samples/rapid-prototyping-comes-of-age.
MyAssignmenthelp.com has appointed best assignment experts who are wizards of words. Our writers know every trick of crafting high quality write-ups within a short period. With years of experiences, we have become one of the most prolific assignment help services in the USA. We deliver custom-made help to students with writing different types of assignments. We guarantee total need-based and timely service, and this is why increasing numbers of students prefer to buy assignment online.
Answers: 1. Contrasting Access Control for Risks, Threats and Vulnerabilities i) The access control in respect to threats can be demonstrated for two types of threats, which are internal threats and external threats. The internal threats occur from the individuals, who have legalized access like employees or other personnel of a company. It is quite difficult to prevent or detect them as they have legalized access to the systems (Yang et al....
Read MoreAnswer: Describe the steps that you would include in the plan to migrate these services? The aim of the Meta soft board is to create a strategy that will help in migrating their web services in to the cloud server, so that they can get better flexibility and the efficiency will also get increased. Before migrating to the cloud server, there are some major concerns that are needed to be considered to be as the essential part. This are as follo...
Read MoreAnswer: Introduction The principal determination of the document is to focus on the significance of 3D technology which is a new concept in the manufacturing industry. This new technology has enhanced specifications compared to the previous technologies. The 3D printing technologies are accurate and flexible, and it is used to manufacture a wide range of materials (Lu, Li & Tian, 2015). This advanced technology works on a three-dime...
Read MoreAnswer: Introduction Ethics is a set of moral principles. It is a discipline dealing with what is good and bad and with moral duty and obligation (webster, 2018). They form the basic beliefs and standards that run an organizations and institutions. In this case, the ethical issues dictate how the information about the patient should be handled. This study uses Max’s situation as a case study for the analysis of ethical i...
Read MoreAnswer: Introduction Smiths Security is a firm located in Australia that deals with security businesses such as fire monitoring services, armored vehicles, alarm monitoring, and security guards. The head office is located in Sydney and has data center across all the major cities in Australia such as Brisbane, Perth, Melbourne, Adelaide, and Sydney). Sydney office houses the main data center. At every site there is 2 business application serve...
Read MoreJust share requirement and get customized Solution.
Orders
Overall Rating
Experts
Our writers make sure that all orders are submitted, prior to the deadline.
Using reliable plagiarism detection software, Turnitin.com.We only provide customized 100 percent original papers.
Feel free to contact our assignment writing services any time via phone, email or live chat. If you are unable to calculate word count online, ask our customer executives.
Our writers can provide you professional writing assistance on any subject at any level.
Our best price guarantee ensures that the features we offer cannot be matched by any of the competitors.
Get all your documents checked for plagiarism or duplicacy with us.
Get different kinds of essays typed in minutes with clicks.
Calculate your semester grades and cumulative GPa with our GPA Calculator.
Balance any chemical equation in minutes just by entering the formula.
Calculate the number of words and number of pages of all your academic documents.
Our Mission Client Satisfaction
I am writing to you to let you know that I am extremely impressed with your recent work. You\'ve dedicated years of service to this company, and your work exemplifies and principles now more than ever. Thank you for all that you have done to help us ...
Australia
Very good experience, so happy with the result. Very highly and strongly recommend this website.
Australia
I got a good price and quality work was provided to me in a short period of time. I scored really well in my assignment. All the rework was done in time which is great.
Australia
They have provided me with work having 0% plagiarism which really helped me to score well in my assignment.
Australia