Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
GUI and Control Program Creation for an Elevator

Demonstrate the following knowledge and understanding

  • Systematically categorize the concepts, principles and techniques for object-oriented programming and software engineering process.

Demonstrate the following skills and abilities

  • Analyse a complex problem and apply a programming language to design, develop and critically evaluate a software solution to the given problem; and analyse and apply a range of concepts, principles and techniques to the software development process.

Task

Task 1: To create a GUI which contains

  • Two request buttons corresponding to the two floors, respectively
  • One control panel with two buttons and a display window
  • Two display areas that display the status of the elevator, i.e. which floor the elevator currently stays, one is of each floor
  • A log button, which trigger the historical information of the elevator operation to be displayed

Task 2: To create a control program that processes the events published by the GUI.

  • When any request button is pressed,

The elevator appears in the corresponding floor

Then the display areas and the display window on the control panel show the corresponding floor number at the same time

  • When the floor number buttons on the control panel are pressed,

The elevator appears to the corresponding floor

Then the display areas and the display window on the control panel show the corresponding floor number at the same time

Task 3: To create a log which record all operations.

  • The corresponding status of the elevator and the time information is stored in a database (it can be MS Access or other equivalent databases)
  • To display the information which has been stored in the database on the GUI

Task 4:

To animate the events described in Task 2 using delegation and timer

Task 5: To optimise the programs developed in Tasks 1 to 4.

  • Optimise the portability by using relative path instead of absolute path
  • Optimise the maintainability by avoiding any duplication among the event handlers over the database related functions
  • Optimise the robustness by eliminating logical errors and handling exception
  • Optimise the efficiency of GUI by implementing multiple tasks concurrently via BackgroundWorker
  • The elevator might have more than two floors, apply the “state design pattern” in the program to accommodate future changes of the requirement. The state is expected to be dispatched dynamically rather than determined by if/switch=

Task 6:

To prepare a test report, the “Marking Matrix with Self-Assessment” table (which is listed at the end of document) should be included in the report

support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close