Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Project Management: Contractors, Owners, and the Cost of Change
Answered

Assignment

Mr. Ibrahim, a tooling engineer, had a dream job. He worked for the state, meaning he had connections. He worked out of the resident engineer’ s office, meaning he had money. He worked with foreigners, meaning he had connections and money. On the job site, he was with the maintenance department. As it was his job to inspect and maintain the equipment, he noticed that CNC tool machines, per contract specification, were delivered with a reduced number of grooves than they were contracted for. The grooves were shallow, and the total machinery weighed less. Ibrahim reported this to his boss, Abdullah - Kadir, who then ordered him to go ahead with the delivery as planned.

Ibrahim and Abdullah - Kadir represent the owners. They are also the new people in leading positions within the company. There weren’t any former employees who knew about the history and people working under the contractor, which left Ibrahim and Abdullah - Kadir unfamiliar with past occurrences. So, a very difficult game had to be played by the ambitious players, even though they didn’t know the history.

 When Ibrahim returned with the data, which included the type of tool machine, the dimensions of the groove, and the number of grooves, he learned that all the machines delivered are different from contract specification. In fact, Mr. Ibrahim realized that the contractor worked off a different machine specification. After informing his boss about these results, he was given orders to ask the contractor to change the machine specification, meaning the grooves’ number and size for future delivery. This resulted in a project change. This was the logic of the owner and represented how the owners viewed the issue. Since all the iron used to produce these machines was already paid for by Mr. Ibrahim’ s predecessor, the owner did not expect to pay any extra for this change. In fact, the owner expected to get the money back because the new specification could result in the use of less iron. Unfortunately, the contractor saw this as an attempt to introduce a new order. The contractor was not aware of the consequence of these project changes. He did not link these project changes with the cost, even though this was a significant change.

With the new specification, the contractor needed to use a better iron than the one Mr. Ibrahim’ s predecessor had originally paid for. In fact, the new iron was the technologically better iron, and therefore, it cost more. The iron of the higher technological value was used to produce a higher quality of grooves. The people working for the contractor failed in explaining this to the owner.  So, these were two different views concerning the same issue. By the end of the project, the cost of the change was tremendous. The owner refused to pay the final amount. The contractor’ s representatives were astonished.

What can a contractor do to prevent such a mistake in the future?

Illustrate these stakeholders’ relationships to the project manager? 

1.Top Management

2.Project Team

3.Your Manager

4.Peers

5.Resource Managers

6.Internal Customers

7.External customer

8.Government

9.Contractors

10.Suppliers

support
close