Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Construction Project Scenario: Conceptual Design and Implementation Report
Answered

Task 1

(Learners are to sketch this practical Construction Project scenario and use and apply it where specified or needed as a an example or case study especially in the consideration of construction materials, services and methods choices suggested) You have been appointed to prepare an initial conceptual design and implementation report on Industrial Complex (2 km by 2 km) near a couple of near parallel highways 12km apart that both link the megacity of London to an international airport in the outskirts of London, Heathrow to be specific. The site of this complex is separated from one of the highways by a large fast flowing River that flows parallel to these highways and finally finds its way into the River Thames. This River which is about 20m wide lies in the middle of the 4 kilometer land space between the chosen Industrial complex site and one of the two highways.

The Client who is a private investor needs twenty (20) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the highway on the other side of the site 6 km away the river, which is not only necessary but required as a key element of the project. The factory buildings are made of both steel, concrete and other materials (to be specified). These industrial and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project.

(a) Explain how the construction industry has developed and encompassed professionalism within its structures.

(b) Demonstrate the scope and linkage between all parties within a construction organisation. In general and with respect to the scenario provided.

(c) Identify different types of contractual work tendered by contractors and justify the use of the specific type of tender for the given industrial complex scenario.

(d) Analyse how the construction industry has developed overall in terms of company structures, its employees and contracted work. Justify the company structure you

will choose for the current scenario.

(e) Critically evaluate how construction companies have developed their structure and business ethos. What is its impact on the scenario provided?

(a) Identify the different types of construction companies in the market and the key features of different types. Suggest the type of Construction Company for the given scenario and justify its suitability.

(b) Explain the relationship that may exist between the companies working on the construction project.

(c) Analyse the link which connects construction companies.

(d) Compare the main factors which differentiate between construction company contracts and tenders.

(a) Identify, with examples, modern construction processes and sequences used within today’s industry, highlighting the way they respond to sustainability needs in the current scenario.

(b) Explain contract planning techniques used within micro and macro projects. Choose the most suitable contract planning techniques for the current scenario and justify their suitability.

(c) Identify where BIM impacts upon operations and construction companies in the current scenario

(d) Analyse how construction has developed in terms of innovation, designs, and within contracts for micro and macro projects, and the interrelationship with BIM. How it will benefit the current scenario.

support
close