1.You are required to submit one detailed plan of this report for the group, which will be discussed and peer-reviewed in class. If you do not submit and pass this formative assessment work then the mark for the final report will be capped .
2.Your mark for the effectiveness of the group working will be based on your own self-assessment together with a peer assessment by your colleagues and will be moderated by the class tutor based on your presentation and her observations. This will be submitted individually and marks for members of the group may vary;
3.All members of the group are collectively responsible for ensuring that all of the preparation work and the final report are completed to a standard with which they are all satisfied, within the time available.
Coronavirus Pandemic: Conversion of Sports centres to Nightingale Hospital- Temporary hospitals that are in place to treat Covid patients in the UK.The smallest of the three schemes is the Manchester Central will have capacity for 1,000 patient beds and NEC in Birmingham and ExCel in London have capacity for 5,000 beds.
Q: Write an academic report that addresses the following from a Project Management Perspective that addresses the following
Create a Work Breakdown Structure (WBS) around 20 work packages that details the activities involved in all phases of the lifecycle including project management activities.
(Use Word, Visio, PowerPoint or similar app to do this and include it in your report).
Using the work packages from your WBS create a network diagram (ND) including the duration, ES/EF, LS/LFand float time estimates and showing any dependencies on previous packages. Highlight the critical path(s) in your diagram.
(Use Word, Visio, PowerPoint or similar app to do this and include it in your report)
Using the packages, durations and dependencies from your ND create a resource- levelled schedule and Gantt chart for your project to show the sequence in which the packages will be completed.
(Use Microsoft Project (MSP) or similar project management software to do this and include it in your report).
Critically analyse how the project manager may use these tools to plan, monitor and manage the scope and delivery of the project to meet client requirements, including any changes that may be required during the course of the project.
Font – Aerial, size 12; 1.5 line space; text justified on the left and right of the page; Relevant graphics should be used in each section with a full citation.