Multiple Server System Simulation You are an engineering manager in charge of a service center where customers arrive to the center with an arrival rate l = 30 customer and hr. As shown in below figure, the service center has parallel 3 service stations each with a service rate m = 12 customer/hr. Both inter-arrival and service times are exponential.
-As an Engineering Manager of the service center, you decided to use the following five key performance measures (KPIs) are:
- Avg. customer waiting time (Wq) - Avg. time a customer spends in the service center (W) - Avg. number of customers waiting in the queue (Lq)
- Avg. number of customers in the service center (L)
- Avg. server utilization (U) Based on the given information, you need to estimate the five KPIs for the service center in order to monitor and improve its performance.
- Use queuing formulas in QM for Windows to estimate the 5 KPIs. - Name the model with your name - Show a screen shot your input and output screens
- Build an ARENA model of the service center
- Name the ARENA model with your name - Show a screen shot of details of each model element (Create, Process, etc.)
- Show the complete model picture.
- Run the model for 40 hours (one week) of operation and obtain results report.
- Study and understand all the elements of the simulation report. - Include the report of simulation results in the appendix.
- Use the simulation results to estimate the averages of same five KPIs.
- Compare QM to ARENA simulation results to simulation results and show differences (Use a table to compare results).
- What can you do to improve the accuracy of ARENA simulation results?
- Use ARENA to sketch one server utilization with run time (40 hrs), what do you conclude?