Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Interdisciplinary Engineering Case Study: Design, Manufacturing, and Improvements

Task:
Purpose of this assignment
Introduce inter disciplinary engineering case study
Scenario
The KOREAN factory of Hi-Tech Metal, Inc. primarily manufactures plumbing system parts for gas pipes, drainage pipes, water supply pipes and hoses etc. A mainframe computer was used for scheduling, but it took a lot of time and unnecessarily put heavy workload on scheduling managers and on-site workers. Following are the associated problems to meet customers’ needs Lengthy 3 to 4 days schedule drafting time, caused by mainframe computer’s long processing time. Inflexibility of mainframe computer to sudden order changes, leading to tedious manual calculation and direct on-site adjustment Extra workload for on-site workers One-month base scheduling that cannot meet customers’ need.
Task 1
Considering above scenario Summarize the design process for the finished component [Identify components, explain the utilities and design process (5/7/10 step) for components] This provides evidence for [CLO 2].
Task 2
Considering above scenario determine the manufacturing process for the finished components [Based on the stake holders, explain the manufacturing process for each component] This provides evidence for [CLO 3].
Task 3
Considering above scenario identify the manufacturing system for the components [Based on the stakeholder, strategic goals , explain the manufacturing system This provides evidence for [CLO 4].
Task 4
Considering above scenario justify improvements and alternatives to design and manufacturing of plumbing system.[Improvements, alternative systems, explain the IoT systems and Industry4.0 impacts]This provides evidence for [CLO 6] Evidence checklist Assessment Criteria Is Evidence provided?
Task 1
Written paragraph with 200 words and with references Y/N
Task 2
Written paragraph with 200 words and with references Y/N
Task 3
Written paragraph with 200 words and with references Y/N
Task 4
Written paragraph with 200 words and with references Y/N
 
Sources of information Class handouts and materials Moodle Engineering Book Internet website and relevant references.

support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close