The submission is in the form of a report. The report should be technical and written in a concise and formal business style. As such, your choice of font face and font size should contribute to the clarity of the information. The report should be well- structured, using headings, sub-sections and paragraphs as appropriate and should contain the sketch of the main scenario as provided. Any images, graphics, or text that is derived from other sources must be correctly referenced using a standard form of citation. A bibliography should be included and in a standard academic format.
LO1 Describe the construction industry with reference to company structures and other activities
LO2 Explain different types of construction companies within the market and their relationships within the tendering process.
LO3 Discuss the key stages in a construction project, and how Building Information Modelling informs the different stages.
LO4 Analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health & safety
The Client who is a private investor needs twenty (20) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the highway on the other side of the site 6 km away the river, which is not only necessary but required as a key element of the project. The factory buildings are made of both steel, concrete and other materials (to be specified). These industrial and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project
LO1 Describe the construction industry with reference to company structures and other activities.
TASK 1
(a) Explain how the construction industry has developed and encompassed professionalism within its structures. (b) Demonstrate the scope and linkage between all parties within a construction organisation. In general and with respect to the scenario provided. (c) Identify different types of contractual work tendered by contractors and justify the use of the specific type of tender for the given industrial complex scenario. (d) Analyse how the construction industry has developed overall in terms of company structures, its employees and contracted work. Justify the company structure you will choose for the current scenario. (e) Critically evaluate how construction companies have developed their structure and business ethos. What is its impact on the scenario provided?
LO2 Explain different types of construction companies within the market and their relationships within the tendering process
TASK 2
(a) Identify the different types of construction companies in the market and the key features of different types. Suggest the type of Construction Company for the
given scenario and justify its suitability. (b) Explain the relationship that may exist between the companies working on the construction project. (c) Analyse the link which connects construction companies. (d) Compare the main factors which differentiate between construction company contracts and tenders.
LO3 Discuss the key stages in a construction project, and how Building Information
Modelling informs the different stages
TASK 3
(a) Identify, with examples, modern construction processes and sequences used within today’s industry, highlighting the way they respond to sustainability needs in the current scenario. (b) Explain contract planning techniques used within micro and macro projects. Choose the most suitable contract planning techniques for the current scenario and justify their suitability. (c) Identify where BIM impacts upon operations and construction companies in the current scenario
(d) Analyse how construction has developed in terms of innovation, designs, and within contracts for micro and macro projects, and the interrelationship with
BIM. How it will benefit the current scenario.
LO4 Analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health & safety
Task 4
(a) Explain how health & safety has now become an integrated part of the construction process. (b) Describe the government legislation which has benchmarked health &
safety within construction. In general and with reference to the current scenario. (c) Discuss the role of collaboration and communication in ensuring safe working practices. By considering the current scenario as an example. (d) Demonstrate how the construction industry has benefited through changes in health & safety legislation. (e) Evaluate the impact of health & safety legislation, how it has evolved the drivers for it, and its advantages or weaknesses within construction.