Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Maximizing Revenue from Buildings and Resources in a Network

Task Description

At each of the 12 positions you plan to build one building that is either a quarry, or a factory, or a market. There are three types of resources: gold, diamonds, and jewellery. Every year the same amount of resources are being sent from building to building over the connections. There is a limitation though for each connection: In every year the sum of all resources that are being sent over a connection cannot exceed 165 units in total (for example, if 100 units of gold are being sent from a to b, then the amount of diamonds that are being sent from b to a is at most 65).

Every year you have 850 units of energy available. Energy is not transported through the network, but is available everywhere.
• Every year a quarry produces 200 units of gold and 75 units of diamonds. This costs 100 units of energy.
• Every year a factory uses 70 units of gold and 20 units of diamonds and produces 60 units of jewellery.

This costs 300 units of energy.

• The market sells gold, diamonds, and jewellery.
A unit of gold gives £150.
A unit of diamonds gives £200.
A unit of jewellery gives £1000.

Selling costs no energy. The sum of all revenues of all markets is called the total revenue. Resources cannot be carried over between years. Quarries and factories are not required to use up all resources. You can decide to forward or destroy an arbitrary amount of resources. The forwarding and the destruction of resources cost no energy. You also do not have to sell everything that gets sent to a market. You can forward
those resources instead. It obviously makes no sense to forward jewellery through a market instead of selling it, but it could in principle be useful to forward gold or diamonds instead of selling them, so that they can be converted to jewellery at a factory.

Quarries and factories can run on an efficieny lower than 100%. Their input, their output, and their energy usage scale down linearly. On the next page is a graphical presentation of an optimal solution for a specific fixed arrangement of buildings. Quarries are yellow, factories are blue, and markets are red. G stands for gold, D stands for diamond, J stands for jewellery. The efficiencies are shown within the circles

 

In principle it is possible to send resources in opposing directions at the same time over a connection, but this example makes no use of that. The energy consumption in this example is (82.5% + 37.5% + 60% + 10.40% + 60% + 10.91%)· 100 + (100% + 96.19%)· 300, which (with more decimal digits) is exactly 850. The total revenue in this example is (with more decimal digits than in the figure) £(240 + 145.468)· 150 + £(66.8129 + 90)· 200 +£117.719 · 1000, which (with more decimal digits) is £206902.0468. 

Your task is to place the buildings, set the efficiencies, and route the resources so that the total revenue is maximised.

1. Write a program P1 in a programming language of your choice that creates an .lp file and then calls glpsol to solve the task for a fixed placement of buildings.


2. Since for every location there are three possible buildings, there are 312 = 531 441 many placements of buildings in total. Write a program P2 that calls your program P1 on each placement and selects the optimal one. My old laptop can solve 1000 such LPs in roughly 5 seconds, so this computation takes less than one hour 

support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close