New

Learn smart - Learn online. Upto 88% off on courses for a limited time. View Courses

Securing Higher Grades Costing Your Pocket? Book Your Assignment at The Lowest Price Now!
loader
Add File

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!

Stuck on Your Question?

Get 24x7 live help from our Top Tutors. All subjects covered.

loader
250 words

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Students Who Viewed This Also Studied

23 Pages
290JA Bachelor of Landscape Design

Question: Abstract: The thesis explores the utilisation of Virtual reality (VR) technology during the process of design of landscape architecture. Today, Landscape architecture is going to be a si ...

Course

290JA

Type

Programming

Subject

Civil Engineering

University

University Of Canberra

Season

Fall

5 Pages
EG7032 Highway and Railway Engineering

You are an engineer working for an engineering consultancy who has been commissioned by a transport authority to provide technical assistance related to the following highway and railway problems: 1. ...

Course

EG7032

Type

Programming

Subject

Civil Engineering

University

James Cook University

0 Page
Implementation of BIM

...

Course

UBLMGW15M

Subject

Civil Engineering

University

University of the West of England

Season

Fall

5 Pages
TMS10803 Thermal Conductivity

Choose the material from combo box.2. Using the sliders, fix a particular diameter for the portion of the test slab in contact with the main heater, and a thickness for the entiresla . Adjust the c ...

Course

TMS10803

Type

Programming

Subject

Civil Engineering

University

Open University Malaysia

KB7034 Building Information Modelling Management

Question

Answered

Question:

Module Learning Outcomes (MLOs).

1. Deconstruct existing information management practices used by Construction Industry actors and communicate their impact upon the industry business model.

2. Critically appraise the scope and role of Building Information Modelling within the context of the Construction industry.

3. Critique existing Construction Industry research efforts, and approaches to problem-solving on real life BIM-enabled projects, to identify, and learn from areas to improve aspects of project delivery through the application of the management, theory or practice of BIM.

4. Produce and present original work for academic review.

It requires the submission of an individual, written case study report whereby you are to self-select a BIMenabled Project Case Study, for the purposes of analysis and reflection around the management, theory and practice of BIM. The ‘unit of analysis’ in this case study report ultimately, remains construction project delivery, and how it could be improved through the use of BIM.

Analysis: This written submission should fully introduce the ‘case’, provide a project description and position it within an Architectural Engineering and Construction (AEC) context. It should also identify key project challenges, evaluate any BIM-enabled solutions, and articulate any BIM-related ‘lessons learned’ that can inform and be generalized to future practice.

Reflection: Through theoretical, and evidence-based perspectives, reflect also upon the key elements of BIM-enabled project delivery practice that you perceive have been applied on the selected project case. Discuss this by making using of current and salient academic (and relevant professional) literature from the subjects knowledge-base.

Therefore, the project case study acts a ‘contextual vehicle’ you then use to evidence your independent research and learning around Building Information Modelling Management, Theory and Practice. Component 1 is worth 100% of the module. It will be submitted and assessed electronically, and it addresses all Module Learning Outcomes.

Coursework Tasks to be Completed by Students

Select a suitable BIM-enabled case study project that is ripe for analysis. This could be a prominent, widely available BIM-enabled case, where useful materials are readily and publicly available, or one thatthe student is currently, or has previously worked on. Such a project should only be one that you have normal access to information. If such a project is a ‘building’ or ‘live site’, then this should only be one that you have the ‘normal’, and ‘necessary’ permissions to access externally and/or internally (i.e. you are not to engage in any trespass of any building/site that you do not have normal permission to enter). Also notethat you should not 'cold-contact' professionals to attempt to arrange access to any project that you do not have normal access to.

If you need a discussion to advise if the proposed BIM-enabled project is suitable for the purposes of case study analysis, then arrange to have this discussion with one of the module tutors by teaching week 6.

In addition to the case study analysis, you should throughout the module, be equipping yourself on other related aspects of contemporary Construction Project Management practice. To do this and develop your topic specific knowledge and understanding, and help you develop your intellectual skills and abilities in this subject, you are to engage with the academic and professional literature around the art, science, and discipline of Construction Project Management.

Therefore, in addition to describing the BIM-enabled case study project itself, your coursework submission is expected primarily draw upon, and refer to, the body of academic work in this area. You should evidence this engagement via appropriate and quality in-text referencing, that is cited correctly throughout. It is also reasonable to expect that some elements in your review will also be informed by discussions held in the module or from any credible BIM-related websites  highlighting current issues and offering additional supporting information.

Again, the work is to be properly structured and supported through ‘academic’ research using appropriateand quality references which are cited correctly throughout. A separate, properly formatted references list must also be provided in the submission at the end of the document.

Expected Size of Submission

§ This written work should be formatted using ‘Arial’ font, of font size ‘11’, with 1.5 line spacing.

§ The upper maximum limit for this work. This word count includes:

§ Any abstract (if provided).

§ The main body of text.

§ In text citations [e.g. (Smith, 2011)].

§ Direct quotations from primary or secondary source material.

§ Title & Contents page.

§ Words within tables, figures, and illustrations.

§ Glossary.

§ Footnotes.

Diagrams, illustrations, photographs etc.and tables are welcome to support the text, but must be fully incorporated into the submission, integrated and following the text that fully explains why they are exhibited. 200 words will be counted for each separate figure/table used.

The work must form a structured and coherent whole. No contents page or superfluous front matter is required. Only a basic front sheet for the submission is to be provided, that identifies the student number (not name), the total number of words used (excluding references section), and the number of figures/tables used.

'Footnotes'/’Endnotes’ will be permitted, as they can offer sufficient value, providing, their use is minimal, sufficiently concise, and appropriate - they offer only 'clarifying' information, or add 'adjacent' value to the sentences already written. In other words, they are not to be used to 'hide' words that would otherwise normally be expected to be contained within the main body of the  text, and their use will be considered in accordance with the University policy regarding word limits.

KB7034 Building Information Modelling Management

Answer in Detail

Solved by qualified expert

Get Access to This Answer

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Hac habitasse platea dictumst vestibulum rhoncus est pellentesque. Amet dictum sit amet justo donec enim diam vulputate ut. Neque convallis a cras semper auctor neque vitae. Elit at imperdiet dui accumsan. Nisl condimentum id venenatis a condimentum vitae sapien pellentesque. Imperdiet massa tincidunt nunc pulvinar sapien et ligula. Malesuada fames ac turpis egestas maecenas pharetra convallis posuere. Et ultrices neque ornare aenean euismod. Suscipit tellus mauris a diam maecenas sed enim. Potenti nullam ac tortor vitae purus faucibus ornare. Morbi tristique senectus et netus et malesuada. Morbi tristique senectus et netus et malesuada. Tellus pellentesque eu tincidunt tortor aliquam. Sit amet purus gravida quis blandit. Nec feugiat in fermentum posuere urna. Vel orci porta non pulvinar neque laoreet suspendisse interdum. Ultricies tristique nulla aliquet enim tortor at auctor urna. Orci sagittis eu volutpat odio facilisis mauris sit amet.

Tellus molestie nunc non blandit massa enim nec dui. Tellus molestie nunc non blandit massa enim nec dui. Ac tortor vitae purus faucibus ornare suspendisse sed nisi. Pharetra et ultrices neque ornare aenean euismod. Pretium viverra suspendisse potenti nullam ac tortor vitae. Morbi quis commodo odio aenean sed. At consectetur lorem donec massa sapien faucibus et. Nisi quis eleifend quam adipiscing vitae proin sagittis nisl rhoncus. Duis at tellus at urna condimentum mattis pellentesque. Vivamus at augue eget arcu dictum varius duis at. Justo donec enim diam vulputate ut. Blandit libero volutpat sed cras ornare arcu. Ac felis donec et odio pellentesque diam volutpat commodo. Convallis a cras semper auctor neque. Tempus iaculis urna id volutpat lacus. Tortor consequat id porta nibh.

174 More Pages to Come in This Document. Get access to the complete answer.

MyAssignmenthelp.com has been helping students of USA for over a decade now. We have dedicated teams of experts who provide assignment help to students in New York City, Boston, Chicago, etc. Owing to their extensive knowledge and years of experience in academic writing, they successfully cater to searches can someone do my assignment in USA or can experts write my assignments.

More KB7034 KB7034 Building Information Modelling Management: Questions & Answers

Q
icon

We aren't endorsed by this University

290JA Bachelor of Landscape Design

Question: Abstract: The thesis explores the utilisation of Virtual reality (VR) technology during the process of design of landscape architecture. Today, Landscape architecture is going to be a significant intersection of various disciplines such as ecology, social, economic and environmental is ...

View Answer
Q
icon

We aren't endorsed by this University

EG7032 Highway and Railway Engineering

You are an engineer working for an engineering consultancy who has been commissioned by a transport authority to provide technical assistance related to the following highway and railway problems: 1. Site Investigations (20%)1a). A site investigation conducted on a proposed highway route revealed 10 ...

View Answer
Q
icon

We aren't endorsed by this University

Implementation of BIM

...

View Answer
Q
icon

We aren't endorsed by this University

TMS10803 Thermal Conductivity

Choose the material from combo box.2. Using the sliders, fix a particular diameter for the portion of the test slab in contact with the main heater, and a thickness for the entiresla . Adjust the cold water temperature using the slider.  Using the white knobs, fix the value of same voltage ...

View Answer

Content Removal Request

If you are the original writer of this content and no longer wish to have your work published on Myassignmenthelp.com then please raise the content removal request.

Choose Our Best Expert to Help You

icon

5% Cashback

On APP - grab it while it lasts!

Download app now (or) Scan the QR code

*Offer eligible for first 3 orders ordered through app!

screener
ribbon
callback request mobile
Have any Query?