Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Professional and Ethical Standards for Civil Engineering Projects

Assessment of Existing Building and Risk Assessments for Demolition

LO1 Understand the set of professional and ethical standards as required by the professional bodies.

LO2 Examine basic designs forms, common construction methods and techniques for various types of projects including concrete and steel frames and permanent ground water controls for various projects.

LO3 Appreciate the types of problems encountered in civil engineering projects and apply hazard and risk identification processes.

LO4 Understand legal and health safety regulations and their methods of compliance.

LO2 - Examine basic designs forms, common construction methods and techniques for various types of projects including concrete and steel frames and permanent ground water controls for various projects.

LO3- Appreciate the types of problems encountered in civil engineering projects and apply hazard and risk identification processes.

LO4- Understand legal and health safety regulations and their methods of compliance.

TASKS

Scenario: You are working as a Junior Engineer for ABC Design & Build Company. The company has been awarded a contract for a London-based university’s Future Campus Project with a project value of £50m.

The work will involve demolition of an existing library building, construction of a large 4 storeyatrium and construction of a new Annex building with a total of 4,000 m² new-build area. The work also comprises of 25,500 m² of refurbishment.

The client would like the campus to be open throughout the demolition process as well as during the refurbishment period.

The client requires that the construction of new building with a large basement, is completed within the Summer months before the beginning of the new academic year.

Task: You are required to prepare a report for your manager on the following aspects. The report must contain an Introduction and the key areas under the following heads: Demolition: You are to assess the existing building before the demolition and carry out the Risk assessments to ensure that the work is completed with all health & safety measures in place. Pile Foundation: Due to the size of the new building, pile foundations are required to carry the loads. You are required to justify the choice of the type of piles used, given the location of the university building in a busy city area. You must then describe the construction process and list any problems that could encounter during the construction process.

Basement Retaining wall: A new retaining wall is to be constructed to form a permanent part of the new basement to be constructed. Explain the construction process of the retaining wall. Suggest a suitable de-watering method to control any ground water control problem, that might arise.

Frame construction: Based on the client’s requirement, you must justify the choice of the type of frame material for the new Annex building. You must describe the construction process. Identify  any health or safety risks that the operations may create for others working at the site as well as the students/staff who are in vicinity of the construction. Frame Layout: Suggest a column grid spacing and draw a grid for the new building footprint of 45mx 30m