Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave
Infrastructure Project Management: Life Cycle, Performance, Asset Management, and Safety Analysis

Learning Outcomes

Learning Outcomes

1.Critically analyse the interaction and mutual impact between infrastructure project, society and the environment, and the sphere of influence of the project manager in impacting those outcomes.

2.Critically evaluate the specific nature of infrastructure projects with regards to the challenges, stakeholders, governance and funding/financial arrangements, noting how these specificities impact on the project management process.

3.Critically analyse options for managing the complete life cycle of infrastructure projects in terms of the key performance indicators that will ensure quality outcomes.
Reflect on their abilities and disposition to work within this field of project management, and how they may need to adapt their leadership style to improve their effectiveness in achieving project outcomes.

This assessment adopts a similar case study approach but focuses on the implementation and decommissioning phases of an integrated infrastructure project. You may use the case study selected for Assessment 1 or an alternative case study which you believe will better address the requirements for examining and analysing the management of the project life cycle, project performance, asset management and sustainability and operational security and safety as specified in this brief. Your analysis and findings from the case study can be structured in four parts as follows:

Part 1: Infrastructure Project Life Cycle,

Part 2: Managing Infrastructure Project Performance,

Part 3: Asset Management and Sustainability, and

Part 4: Infrastructure Project Security and Safety.

Particular attention should be paid to reference material addressing control processes, quality management, risk management, supply chain management and project leadership. As a guide, the case study analysis should address the following requirements:

Part A

Explain the approach project leadership utilised to manage the project. How was quality integrated into the project management function?
Describe the risks associated with this project and the assessment of these risks. Explain what was done to mitigate/manage these risks throughout the project life cycle.
Explain how the project leadership managed the supply chains for the project. Were there any difficulties in integrating quality management and control processes into supply chain network?
Explain if leadership integrated quality into the process and if so, how?
Describe what tools might have been used in the project’s life cycle to aid in the above tasks.
Identify opportunities for best practice improvement in the management of the project’s life cycle.
Were any infrastructure support systems put in place for the project?

Part 2

You will note a focus on the definition of project performance, the importance of building high performance teams, monitoring and controlling performance risks, monitoring and managing the supply chain of an infrastructure project, and approaches to project procurement. As a guide, the case study analysis should address the following requirements:

Explain how the project defined project performance
Explain how the project monitored and controlled the project’s performance risks
Explain how the project monitors and manages the performance of the supply chain in the project
Explain if there is a relationship between the approaches to procurement and the infrastructure project’s actual performance
Did the project utilise an integrated project team that promoted project performance? Is there a link between team building and project performance?
Do you think there were opportunities for improvement in the management of the project? Describe what improvements you would suggest.

Part 3

The emphasis is on asset maintenance and sustainability-based management throughout the complete life cycle from planning to post completion. As a guide, the case study analysis should address the following requirements:

Explain the commissioning steps for the project
Explain how project leadership managed the following:

Contract handover and sign-off

Infrastructure maintenance issues

Strategic planning for maintenance

Explain the techniques the project utilised for maintenance management

What methods and techniques did the project use for managing the critical infrastructure and the assets from a sustainability perspective? What are the best practice approaches to asset management?

Part 4

You will note an emphasis on safety and security from different perspectives including facility vulnerability, safety considerations after disaster events, disaster management information system requirements and decision-making tools, contamination/hazard sites and contingency models. As a guide, the case study analysis should address the following requirements:

What were some of the broader operational issues for the project?

Were there any strategies in place for dealing with safety and security threats?

How did the project identify security and safety threats? What methods were used?

Were there any safety and security issues and, if so, what was the project management response to these issues and how were they managed?

Do you think the project leadership had the ability and disposition to deal with serious safety and security issues on the project?

What types of techniques were used for safety and security management?

In considering these requirements, always be mindful of, and reflect on, the findings and the lessons learnt from the case study and how they can be applied in your own personal development and professional career. Highlight any specific instances where your strengths and limitations as a project manager have been identified.

support
close