Question: The construction works in Nepal are very risky. Most of the unskilled and semi-skilled workers at construction site are from villages who are not much aware about the safety as it to be(Mishra, 2019). Although the safety policy, rules and regulations and safety provisions are provided, most of the construction company are found not following the proper safety practices at site(Dahal, 2005). Lack of proper safety measures leads to the...
Question: 1.Design problems rarely have just one acceptable solution. There are usually many unacceptable solutions, and often quite a few acceptable solutions too, and the design exercise is to find a good (if not the “best”) acceptable solution. An acceptable solution would be one where the structure is safe and fit for purpose, but we would also look for solutions which have a “pleasing” form and appearance, economic...
Question: All assignments must be submitted by the date and time specified above. Students are required to submit an electronic copy of their completed assignment via the Assignments section of Canvas and follow any specific instructions. Any change to this instruction will be advised via Canvas. The following module learning outcomes and professional body learning outcomes are tested in this assessment: (1)Demonstrate critical understandin...
Question: Learning outcomes: By the end of the module, you should be able to: Learning Outcome 1 - You will be able to develop and recommend strategies for the development of group dynamics including displaying team building skills, leadership qualities and self development. Learning Outcome 2 - You will plan contributions and develop effective solutions to problems within your award discipline. Learning Outcome 3 - You will produce a care...
Note About South Elevation DrawingYou are asked to do the following for Phase 3 of the design project:? *Exterior Column Design at grid J6 (based on concentric axial compression only). o Note, there seems to be an error in the south elevation drawing – there is a column located at J6, asshown in the foundation plan, but it does not show in the south elevation drawing. o The column shown in the set of drawings is an HSS, but for this pr...
Calculating Bending Moments and Shear Forces for Simply Supported Steel and Concrete BeamsStudents will submit: ·calculations, including workings, to show their achievement of a solution to the assigned questions ·short written statements, explaining: ostatutory requirements for structural designs osafety factors for live loads, dead loads and imposed loads determined in calculations o evaluating how bending moments determin...
Question:The submission is comprised of two parts: 1. Construction Information; to include: a. Site plan b. Floor plan c. Elevations d. Section e. Detail(s) f. Door and window schedules g. Outline bill of quantities h. Schedule of works All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information, and be numbered using an industry standard. Drawings should be produced using an ...
QuestionThe submission is comprised of two parts: 1. Construction Information; to include: a. Site plan b. Floor plan c. Elevations d. Section e. Detail(s) f. Door and window schedules g. Outline bill of quantities h. Schedule of works All drawings are to be on a minimum sheet size of A3. They should include a title block, showing project information, and be numbered using an industry standard. Drawings should be produced using an in...
Solution to the Diffusion EquationConsider two simultaneously deposited concentration spikes of salt (i.e. D=10-9m2s-1), each of mass M located at x = 3m and x = 7m along a narrow conduit.=(note: questions b, e, and f are optional. If you have nothing better to do, and/oryou want to challenge yourself, try them) a. What is the solution to the diffusion equation for this scenario, i.e. what isC(x,t)? b. Show that the expression C(x,t) you wro...
Overview of the development of construction and its impact on the built environmentThe submission is in the form of an individual brochure, with supporting drawings. This should be written in a concise, formal style. The selection of font face, font size and line spacing are left to your discretion, but the report must be readable and clear. You are required to make use of headings, paragraphs and subsections as appropriate. All drawing...
QuestionThis assessment is designed to give the student practical experience to develop a sound knowledge of the essential surveying procedures and recording protocols. On successful completion of the assignment, the student should be able to:- 1.Carry out a topographical survey using surveying instruments, record findings and use fieldwork data to produce a scaled survey drawing. 2.Accurately carry out levelling exercises. 3.Und...
Logical approach to design of slabs, beams and columns·Logical approach to design of slabs, beams and columns showing the efficiency of each member regarding bending, shear, compression and deflection, as appropriate; ·Practical application of judgement to ensure the reinforced concrete structure is economical to construction; ·Presentation of the portfolio with technical drawings is an important factor in convincing ...
Question: Take off quantities on dimension paper in accordance with NRM2 for the internal finishes/decoration (floor, wall, ceiling and skirting) and masonry (superstructure only - external and internal walls) as shown on the assignment drawings You may assume/note the following (this is not a complete list of assumptions you may wish to make); • Note you are not required to extend your dimensions • External wall : 102.5 bric...
Project BriefProject Brief TAHE Ventures have retained you as the lead consultant to advise on traffic and transportation issues relating to proposals for their new gas and oil field development involving hydraulic fracking. The site is located off a major road single 2-lane (S2) on the site of a former coal mining estate. Specifically, you are required to 1) Provide pavement design solutions for the major highway to accomodate the anticipat...
Understanding the Basics of SEO Surface settlement assessment due to tunnelling (i) A single 10m diameter tunnel is to be constructed 28m below ground surface level within London Clay using a conventional shield. An overlying 3.5m diameter tunnel is located 12m below ground level and at a right angles to the new tunnel. In addition an important building (15m by 15m by 100m high) is located at ground surface level directly ...