Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave

Describe about the Operations Strategy For Functional and Formation Processing.

Project Objectives

The formation of the improved functional and formation processing had been implied for developing the formation of the smart processing and formation (Kerzner and Kerzner 2017). The aligning of the improved project management had been developed for effectively executing the formation of the improved functional and formation process. The formation of the improved activities had been developed for forming the using of the operations. The aligning of the activities had been managed for easing the management for easing the aligning of the processes supporting the using of the processing. The project management processing for the formation of the Fronthy Coffee house formation had been effectively managed for easing the management of the aligning process.

The following assignment is a specific project proposal document that helps in easing the information processing for the formation of the operations and formation. The report would include the processing of the effective project objectives, time schedule formation, and performance analysis for the formation of the effective and smart processing management. The risk communication management, and HR management would also be formed supporting the using of the smart processing and formation. The documentation of these parts of reports had been effectively developed for supporting the management of the activities aligning the simplification of the operations.

The project of Formation of Fronthy Coffee House had been effectively formed for supporting the aligning of the improved and effective coffee house at the required location. The objectives of the project would include,

  • To develop a technologically advanced coffee house at the required location as per the client’s requirements
  • To support the implication of the operations supporting the formation of the effective project plan
  • To distribute the work in specific work packages for executing the completion of the work

The following section would explain the objectives of the project in detailed expression,

Coffee House Formation: The Formation of Fronthy Coffee House has the main objective of developing a coffee house for the implementation of the activities. The coffee house formation had been eased by the formation of the infrastructure formation and aligning of the effective construction of the coffee house. The formation of the coffee house had been effectively developed for ease of the effective and using of the profound system formation. The formation of the coffee house had been effectively developed for easing the implication of the improved operations for listing the management of the formation. The coffee house formation had been effectively developed for listing the management of the improved formation formation.

Project Plan Formation: The project plan formation had been formed implying the use of the traditional waterfall model. The waterfall model would allow the simplification of the using of the factors aligning for easing the implication of the successive formation. The project plan formation had been effectively developed for aligning the using of the waterfall model formation. The waterfall model had been effectively developed for easing the using of the smart formation model. The project plan activities had been formed one after another constraint so that the project would employ the ease of specific aligning method.

Time Schedule

Work Package Formation: The formation of the effective work package aligning for the project for implementing the formation of the smart formation methods. The work package formation had been helpful for easing the simplification of the factors aligning the waterfall model. The following is the list of activities included in the project,

WBS

Task Name

0

Formation of Fronthy Coffee House

1

Initiation Phase

1.1

Requirements are identified

1.2

Resources are accumulated

1.3

Charter Documents are made

1.4

Submission of documents

1.5

Sign off

2

Planning Phase

2.1

Activities are highlighted

2.2

Scheduling is done

2.3

Complete Plan is made

2.4

Plan Approval

3

Execution Phase

3.1

Contract Agreement

3.2

Infrastructure Formation

3.3

Equipments are installed

3.4

Interior works are done

3.5

Ground works are done

3.6

Windows, Doors, and Roof is made

3.7

Furniture and Fixtures are made

3.8

Fire safety and Emergency exit is added

3.9

Security Cameras are added

4

Closure Phase

4.1

Final Inspection of the coffee house

4.2

Reports are made

4.3

Submission of documents

4.4

Sign off

4.5

Closed

The following is the work breakdown structure of the project of ‘Formation of Fronthy Coffee House’,

The project of ‘Formation of Fronthy Coffee House’ had been effectively resulted in developing the aligning of the improved functional formation. The project schedule had been formation of the improved functional management. The aligning of the Ms-Project document had been formed for easing the implementation of the improved functional and formation process. The time schedule for the project is given below,

WBS

Task Name

Duration

Start

Finish

Predecessors

0

Formation of Fronthy Coffee House

50 days

Mon 8/20/18

Fri 10/26/18

1

   Initiation Phase

8 days

Mon 8/20/18

Wed 8/29/18

1.1

      Requirements are identified

2 days

Mon 8/20/18

Tue 8/21/18

1.2

      Resources are accumulated

3 days

Wed 8/22/18

Fri 8/24/18

2

1.3

      Charter Documents are made

2 days

Mon 8/27/18

Tue 8/28/18

3

1.4

      Submission of documents

1 day

Wed 8/29/18

Wed 8/29/18

4

1.5

      Sign off

0 days

Wed 8/29/18

Wed 8/29/18

5

2

   Planning Phase

10 days

Thu 8/30/18

Wed 9/12/18

2.1

      Activities are highlighted

2 days

Thu 8/30/18

Fri 8/31/18

6

2.2

      Scheduling is done

3 days

Mon 9/3/18

Wed 9/5/18

8

2.3

      Complete Plan is made

5 days

Thu 9/6/18

Wed 9/12/18

9

2.4

      Plan Approval

0 days

Wed 9/12/18

Wed 9/12/18

10

3

   Execution Phase

25 days

Thu 9/13/18

Wed 10/17/18

3.1

      Contract Agreement

2 days

Thu 9/13/18

Fri 9/14/18

11

3.2

      Infrastructure Formation

5 days

Mon 9/17/18

Fri 9/21/18

13

3.3

      Equipments are installed

3 days

Mon 9/24/18

Wed 9/26/18

14

3.4

      Interior works are done

3 days

Thu 9/27/18

Mon 10/1/18

15

3.5

      Ground works are done

4 days

Tue 10/2/18

Fri 10/5/18

16

3.6

      Windows, Doors, and Roof is made

3 days

Mon 10/8/18

Wed 10/10/18

17

3.7

      Furniture and Fixtures are made

2 days

Thu 10/11/18

Fri 10/12/18

18

3.8

      Fire safety and Emergency exit is added

2 days

Mon 10/15/18

Tue 10/16/18

19

3.9

      Security Cameras are added

1 day

Wed 10/17/18

Wed 10/17/18

20

4

   Closure Phase

7 days

Thu 10/18/18

Fri 10/26/18

4.1

      Final Inspection of the coffee house

3 days

Thu 10/18/18

Mon 10/22/18

21

4.2

      Reports are made

2 days

Tue 10/23/18

Wed 10/24/18

23

4.3

      Submission of documents

1 day

Thu 10/25/18

Thu 10/25/18

24

4.4

      Sign off

1 day

Fri 10/26/18

Fri 10/26/18

25

4.5

      Closed

0 days

Fri 10/26/18

Fri 10/26/18

26

Table 1: Project Schedule table

The formation of the effective and smart project schedule had been based on the use of the effective project scheduling activities. The deployment of the smart processing had been helpful for the formation of the smart project final deliverable. The project schedule had been formed considering the aligning of the effective aligning of the project schedule. The waterfall model formation had been used for the completion of the project schedule. The project phases had been evaluated with the formation of the four phases namely initiation, planning, execution, and closure. The following is the explanation of the project plan phases,

Initiation Phase: The initiation phase comprise of developing the effective and improved project initialization activities. The project initialization had been formed for successfully initialization of the project activities and it comprises of requirements are identified, resources are accumulated, charter documents are made, submission of documents, and sign off.

Plan Formation Phase: The planning phase would involve the formation of the activities and scheduling them in a proper time phased timeline for easing the formation of the project plan. The plan formation phase would involve the formation of the effective and improved formation of the activities like activities are highlighted, scheduling is done, complete plan is made, and plan approval.

Execution Phase: The execution phase comprise of executing the activities of the smart formation and using of the project plan formation. The activities of the phase involve contract agreement, infrastructure formation, equipments are installed, interior works are done, ground works are done, windows, doors, and roof is made, furniture and fixtures are made, fire safety and emergency exit is added, and security cameras are added.

Work Package Formation

Closure Phase: The closure phase would involve the activities of final inspection of the coffee house, reports are made, submission of documents, sign off, and closed. It would result in the final report formation and the closure of the project operations. 

The cost analysis had been based on the simplification of the resource usage and aligning of the specific formation process. The cost analysis had been formed for easing the aligning for usage record formation and using for the final documentation.

The following is the budget for the project,

Resource Name

Work

Standard Rate

Cost

Analyst

16 hrs

$40.00/hr

$640.00

Project Manager

72 hrs

$80.00/hr

$5,760.00

Documenter

48 hrs

$45.00/hr

$2,160.00

Planner

80 hrs

$50.00/hr

$4,000.00

Contractor

56 hrs

$75.00/hr

$4,200.00

Workers

96 hrs

$60.00/hr

$5,760.00

Technician

32 hrs

$65.00/hr

$2,080.00

Architect

40 hrs

$70.00/hr

$2,800.00

Construction Materials

1

$5,000.00

$5,000.00

Interior Components

1

$1,500.00

$1,500.00

Windows

1

$400.00

$400.00

Doors

1

$400.00

$400.00

Roofshed

1

$400.00

$400.00

Furniture and Fixtures

1

$900.00

$900.00

Fire Extinguisher

1

$600.00

$600.00

Security Cameras

1

$1,150.00

$1,150.00

Documents

2

$500.00

$1,000.00

Equipments

1

$1,250.00

$1,250.00

Total Budget

$40,000.00

The budget formation would involve the resource usage for the project and it has been shown below,

Resource Name/Activity Involved in

Usage

Analyst

16 hrs

   Requirements are identified

16 hrs

Project Manager

72 hrs

   Resources are accumulated

24 hrs

   Contract Agreement

16 hrs

   Final Inspection of the coffee house

24 hrs

   Sign off

8 hrs

Documenter

48 hrs

   Charter Documents are made

16 hrs

   Submission of documents

8 hrs

   Reports are made

16 hrs

   Submission of documents

8 hrs

Planner

80 hrs

   Activities are highlighted

16 hrs

   Scheduling is done

24 hrs

   Complete Plan is made

40 hrs

Contractor

56 hrs

   Infrastructure Formation

40 hrs

   Fire safety and Emergency exit is added

16 hrs

Workers

96 hrs

   Ground works are done

32 hrs

   Windows, Doors, and Roof is made

24 hrs

   Infrastructure Formation

40 hrs

Technician

32 hrs

   Equipments are installed

24 hrs

   Security Cameras are added

8 hrs

Architect

40 hrs

   Interior works are done

24 hrs

   Furniture and Fixtures are made

16 hrs

Construction Materials

1

   Resources are accumulated

1

Interior Components

1

   Interior works are done

1

Windows

1

   Windows, Doors, and Roof is made

1

Doors

1

   Windows, Doors, and Roof is made

1

Roofshed

1

   Windows, Doors, and Roof is made

1

Furniture and Fixtures

1

   Furniture and Fixtures are made

1

Fire Extinguisher

1

   Fire safety and Emergency exit is added

1

Security Cameras

1

   Security Cameras are added

1

Documents

2

   Submission of documents

1

   Charter Documents are made

1

Equipments

1

   Resources are accumulated

1

The performance analysis is a method/strategy that had been helpful for keeping an eye on the progress of the human resources for doing the project activities. The performance analysis had been based on the simplification of the activities and aligning the using of the improved communication process.  

The performance analysis had been based on the use of Triage, Diagnosis, and Treatment activities. The using of triage had been helpful for forming an opportunity and gap analysis for the project progress. The formation of the diagnosis of the project activities had been helpful for taking care of the expected formation management. The use of the improved analysis had been helpful in listing the formation of the function. The root cause had been analysed while taking care of the using of the information tool management. The treatment is done for modifying the implication of the improved functions aligning the using of the effective information gathering.

Risk management is formed for easing the using of the effective and improved aligning of the risk mitigation and formation process (Larson et al. 2014). The risk management had been effectively developed for easing the management of the processing. The management of the risk processing had been formed for easing the management processing. The risk management processing had been effectively developed for listing the aligning processing. The risk management had been effectively managed for deploying the management of the processing aligning the risk management. The risk management for the project of Formation of Fronthy Coffee House is given below,

Risk Name

Description

Likelihood

Severity

Mitigation

Delay in Completion

The delay in completion is the primary issue of the formation of the project aligning.

High

Low

Project Schedule Formation

Over Budget

The shortage of resources would result in the over budget issues of the project

Medium

Medium

Provisional Budget should be made

Quality Issues

The inferior quality of the materials would result in the formation of the issues of project

High

Medium

Quality Management Plan should be implied

Construction Problems

The construction problems had been resulted in forming the major setback for the formation of the coffee house interior

Low

High

SDLC should be used for easing the implication of the operation formation

Contractor Disagreement

The difference between the contractor and the client would also result in causing the major problem for the project completion

Low

High

Proper document and negotiation documentation should be made

The communication management plan is formed for easing the methods of information transfer in the organization (Romiszowski 2016). The documentation of these parts of reports had been effectively developed for supporting the management of the activities aligning the simplification of the communication. The formation of the improved functional and formation processing had been implied for developing the formation of the smart processing and formation. The aligning of the improved project communication had been developed for effectively executing the formation of the improved functional and formation process. The formation of the improved activities had been developed for forming the using of the communication. The following table would show the communication plan for the project of Formation of Fronthy Coffee House,

Sender

Communication Means

Frequency

Communication Purpose

Receiver

Project Manager

Face to face talk

Once

Resource Requirement

Client

Project Manager

Reports, Meetings

Monthly

Client Requirements

Project Team

Client

Report, face to face talk

Once

Client Requirements

Project Manager

Client

Reports, Meetings

Once

Change Requirements

Project Manager

Project Team

Report, face to face talk

Weekly

Project Resource Requirements

Contractor

Project Team

Emails

Monthly

Project Progress

Project Manager

Contractor

Reports, Meetings

Weekly

Project Progress

Project Manager

Execution Phase

The HRM plan involves the usage of the human resources in the project for ensuring that the project is completed successfully. The HRM plan would include the aligning of the resources as per the need and formation of the project phases for ensuring the completion of the project (Mir and Pinnington 2014). The HRM had been effectively based on the aligning of the resources for successful execution of the projects. The documentation of these parts of reports had been effectively developed for supporting the management of the activities aligning the simplification of the HRM management. The formation of the improved functional and formation processing had been implied for developing the formation of the smart processing and formation. The aligning of the improved project management had been developed for effectively executing the formation of the improved functional and formation process. The formation of the improved activities had been developed for forming the using of the HRM management. The HRM would also involve the training and documentation of the policies aligning to the working culture of the organization. The following is the Human Resource Usage for the project of Formation of Fronthy Coffee House,

WBS

Task Name

Resource Names

1.1

Requirements are identified

Analyst

1.2

Resources are accumulated

Project Manager,

1.3

Charter Documents are made

Documenter,

1.4

Submission of documents

Documenter

2.1

Activities are highlighted

Planner

2.2

Scheduling is done

Planner

2.3

Complete Plan is made

Planner

3.1

Contract Agreement

Project Manager

3.2

Infrastructure Formation

Contractor, Workers

3.3

Equipments are installed

Technician

3.4

Interior works are done

Architect,

3.5

Ground works are done

Workers

3.6

Windows, Doors, and Roof is made

Workers,

3.7

Furniture and Fixtures are made

Architect,

3.8

Fire safety and Emergency exit is added

Contractor,

3.9

Security Cameras are added

Technician,

4.1

Final Inspection of the coffee house

Project Manager

4.2

Reports are made

Documenter

4.3

Submission of documents

Documenter,

4.4

Sign off

Project Manager

It can be concluded from the assignment that the project proposal documents had helped in easing the information processing for the formation of the operations and formation. The report had included the processing of the effective project objectives, time schedule formation, and performance analysis for the formation of the effective and smart processing management. The risk communication management, and HR management had also be formed supporting the using of the smart processing and formation. The documentation of these parts of reports had been effectively developed for supporting the management of the activities aligning the simplification of the operations. The formation of the improved functional and formation processing had been implied for developing the formation of the smart processing and formation. The aligning of the improved project management had been developed for effectively executing the formation of the improved functional and formation process. The formation of the improved activities had been developed for forming the using of the operations. The aligning of the activities had been managed for easing the management for easing the aligning of the processes supporting the using of the processing. The project management processing for the formation of the Fronthy Coffee house formation had been effectively managed for easing the management of the aligning process. 

Bromiley, P. and Rau, D., 2016. Operations management and the resource based view: Another view. Journal of Operations Management, 41, pp.95-106.

Dhar, S., and Bose, I. 2015. Framework for Using New Age Technology to Increase Effectiveness of Project Communication for Outsourced IT Projects Executed from Offshore. In Workshop on E-Business (pp. 207-211). Springer, Cham.

Eldredge, L.K.B., Markham, C.M., Ruiter, R.A., Kok, G. and Parcel, G.S., 2016. Planning health promotion programs: an intervention mapping approach. John Wiley & Sons.

Fainstein, S.S. and DeFilippis, J. eds., 2015. Readings in planning theory. John Wiley & Sons.

Fleming, Q. W., and Koppelman, J. M. 2016. Earned value project management. Project Management Institute.

Goetsch, D.L. and Davis, S.B., 2014. Quality management for organizational excellence. Upper Saddle River, NJ: pearson.

Haksever, C. and Render, B., 2018. Service and Operations Management. World Scientific Books.

Harrison, F., and Lock, D. 2017. Advanced project management: a structured approach. Routledge.

Heagney, J. 2016. Fundamentals of project management. Amacom.

Hitt, M.A., Carnes, C.M. and Xu, K., 2016. A current view of resource based theory in operations management: A response to Bromiley and Rau. Journal of Operations Management, 41(10), pp.107-109.

Kato, T., Nakajima, T., Saito, T., Okitsu, J., Shiga, Y. and Miki, Y., Hitachi Ltd, 2015. Operations management methods and devices thereof in information-processing systems. Pearson

Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Kerzner, H. and Kerzner, H.R., 2018. Developing operational strategies. John Wiley & Sons.

Kerzner, H., and Kerzner, H. R. 2017. Project management: a systems approach to planning, scheduling, and controlling. John Wiley and Sons.

Larson, E. W., Gray, C. F., Danlin, U., Honig, B., and Bacarini, D. 2014. Project management: The managerial process (Vol. 6). Grandview Heights, OH: McGraw-Hill Education.

Lee, H. K., Keil, M., Smith, H. J., and Sarkar, S. 2017. The roles of mood and conscientiousness in reporting of self?committed errors on IT projects. Information Systems Journal, 27(5), 589-617.

Leigh, N.G. and Blakely, E.J., 2016. Planning local economic development: Theory and practice. SAGE publications.

Marchewka, J. T. 2014. Information technology project management. John Wiley and Sons.

Meredith, J. R., Mantel, S. J., Shafer, S. M., and Sutton, M. M. 2014. Project management in practice. Wiley.

Mir, F. A., and Pinnington, A. H. 2014. Exploring the value of project management: linking project management performance and project success. International journal of project management, 32(2), 202-217.

Nicholas, J. M., and Steyn, H. 2017. Project management for engineering, business and technology. Routledge.

Rodríguez, A., Ortega, F., and Concepción, R. 2016. A method for the evaluation of risk in IT projects. Expert Systems with Applications, 45, 273-285.

Romiszowski, A.J., 2016. Designing instructional systems: Decision making in course planning and curriculum design. Routledge.

Schönberger, M., and ?irjevskis, A. 2017. Successful IT/IS Projects in Healthcare: Evaluation of Critical Success Factors.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2021). Operations Strategy For Functional And Formation Processing. Retrieved from https://myassignmenthelp.com/free-samples/u03775-operations-strategy/formation-process.html.

"Operations Strategy For Functional And Formation Processing." My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/u03775-operations-strategy/formation-process.html.

My Assignment Help (2021) Operations Strategy For Functional And Formation Processing [Online]. Available from: https://myassignmenthelp.com/free-samples/u03775-operations-strategy/formation-process.html
[Accessed 28 March 2024].

My Assignment Help. 'Operations Strategy For Functional And Formation Processing' (My Assignment Help, 2021) <https://myassignmenthelp.com/free-samples/u03775-operations-strategy/formation-process.html> accessed 28 March 2024.

My Assignment Help. Operations Strategy For Functional And Formation Processing [Internet]. My Assignment Help. 2021 [cited 28 March 2024]. Available from: https://myassignmenthelp.com/free-samples/u03775-operations-strategy/formation-process.html.

Get instant help from 5000+ experts for
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing: Proofread your work by experts and improve grade at Lowest cost

loader
250 words
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Plagiarism checker
Verify originality of an essay
essay
Generate unique essays in a jiffy
Plagiarism checker
Cite sources with ease
support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close