EFB106 Cost Benefit Analysis For Project Appraisal

tag 3 Downloads 3 Pages / 610 Words tag 21-08-2020

Question:

Adani Mine Case Study

Case description

The Indian conglomerate, the Adani Group, proposed to build an integrated coal mind, rail and port project in Queensland (hereinafter referred to as The Project). The company stated that it intends to ship the coal to India for the use of its power stations. The three main components of The Project are:

  • The Charmichael Coal Mine: the mine is proposed for the Galilee Basin in Queensland with six open cut pits and five underground mines over an area of 30km long. It would be the largest coal mind ever built in Australia and would be amongst the biggest in the world. Adani has initial approval to mine up to 60 million tonnes of coal per annum (Mtpa) from the site for 30 years. It plans to operate the mind for at least 60 years, extracting at least 2.3 billion tonnes of product coal in the process.
  • The Carmichael Railway: Adani proposed to build the North Galilee Basin rail to transport the coal to a port on the coast of Queensland.
  • The Abbot Point Port: Adani already owns and operates the existing 50Mtpa coal export terminal at Abbot Point (Terminal 1). The terminal is currently shared amongst multiple coal mines in the north of the Bowen Basin. Adani plans to continue to use this terminal to export coal from the Carmichael mine. In addition, it has received approval for a new coal mine terminal - Terminal 0 at Abbot Point. This terminal will have a capacity of up to 70Mtpa. It would be needed when the Carmichael mine is operating at full capacity. The new terminal and the continuing use of Terminal 1 will increase Adani’s coal export capacity to 120Mtpa. All the coals will be shipped through the Great Barrier Reef and the World Heritage Area. However, it is still unclear if Terminal 0 is fully needed should the Carmichael does not operate at full capacity, and whether or not the Take or Pay contracts with existing users of Terminal 1 would be renewed.

Extra information: The Adani Group owns large coal power stations and transmission infrastructure in India. It plans to own all aspects of the power infrastructure in India. Recently, the media has reported that the company has failed to provide sufficient environmental consideration in its business operation in India.

Task 1 : Provide critical analysis of Fahrer (2015)

Task 2: Suppose that you are requested to re-conduct the socio-economic cost and benefit analysis for the project, what would you do in order to improve the quality of the analysis. Few areas of focus: classification and quantification of impacts, monetary valuation of impacts, analysis of impacts, costs and benefits among stakeholders. Provide suggestions and justifications for your suggestions.

 
Download Sample Now

Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.

Upload
Unique Document

Document
Under Evaluation

Get Money
into Your Wallet

Total 3 pages

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2020). Cost Benefit Analysis For Project Appraisal. Retrieved from https://myassignmenthelp.com/free-samples/efb106-cost-benefit-analysis-for-project-appraisal.

"Cost Benefit Analysis For Project Appraisal." My Assignment Help, 2020, https://myassignmenthelp.com/free-samples/efb106-cost-benefit-analysis-for-project-appraisal.

My Assignment Help (2020) Cost Benefit Analysis For Project Appraisal [Online]. Available from: https://myassignmenthelp.com/free-samples/efb106-cost-benefit-analysis-for-project-appraisal
[Accessed 06 October 2022].

My Assignment Help. 'Cost Benefit Analysis For Project Appraisal' (My Assignment Help, 2020) <https://myassignmenthelp.com/free-samples/efb106-cost-benefit-analysis-for-project-appraisal> accessed 06 October 2022.

My Assignment Help. Cost Benefit Analysis For Project Appraisal [Internet]. My Assignment Help. 2020 [cited 06 October 2022]. Available from: https://myassignmenthelp.com/free-samples/efb106-cost-benefit-analysis-for-project-appraisal.


Stuck on Any Question

Our best expert will help you with the answer of your question with best explanation.

question
We will use e-mail only for:

arrow Communication regarding your orders

arrow To send you invoices, and other billing info

arrow To provide you with information of offers and other benefits

loader
250 words
Error goes here

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

We Can Help!

Get top notch assistance from our best tutors !
Excel in your academics & career in one easy click!

icon

Other Samples

Content Removal Request

If you are the original writer of this content and no longer wish to have your work published on Myassignmenthelp.com then please raise the content removal request.

icon

5% Cashback

On APP - grab it while it lasts!

Download app now (or) Scan the QR code

*Offer eligible for first 3 orders ordered through app!

screener
ribbon
callback request mobile
Have any Query?