Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave

Write the Project Claims and Damages Report For Behavioural Factors.

Preferred form of procurement

The preferred form of procurement as an outcome from the negotiation process for Project 1 proposed in the PPMP20011 Projects Negotiation and Conflict Report was Fixed Price Procurement Contract type as it would help in utilizing the human labours to possibly best level.

The subthemes and KSAE’s that will best mitigate and reduce project claims and damages are itemized in the following tables.

  • Platform Foundation (p. 117-118)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

1. Motivation and Context

Technical KSAE: Medium Level of Experimental- motivation for forming the utilization of the motivation and context development of the activities for the platform development in Queensland Health Payroll system development.

Project Management KSAE: High Value of best value motivational for focusing on the implication of the project activities for the platform development for Queensland Health Payroll system development.

Business Solution KSAE: Low Level of Experimental- motivation as it is not included for the platform development for Queensland Health Payroll system development.

Relational KSAE: Medium Level of Relational rationale as it results in forming the rationale thinking required for the platform development for Queensland Health Payroll system development.

2. Joint Governance structure

Technical KSAE: Medium Level of Governance Processes as some activities would require implication of governance process for the platform development for Queensland Health Payroll system development.

Project Management KSAE: Low Level of Governance Processes as governance is related to the decision making and not involved for management operations

Business Solution KSAE: Medium Level of Governance best value strategy as business solution would require the implication of the effective strategy for the platform development for Queensland Health Payroll system development.

Relational KSAE: Low level of Governance Structure as the platform development for Queensland Health Payroll system development would imply the deployment of only technical activities

3. Integrated Risk Mitigation Strategy

Technical KSAE: High Level of System Integration as the deployment of the activities for platform dependent would be eased by the implication of the risk management.

Project Management KSAE: Medium Level of risk mitigation action as the integrated risk management would be a part of the project management operations in Queensland Health Payroll system

Business Solution KSAE: Medium Level of System Integration for utilizing the integrated risk mitigation strategy for the platform development for Queensland Health Payroll system

Relational KSAE: Medium Level of Risk Sharing conversation for forming the implication of the activities aligning with the utilization of the effective integration management for Queensland Health Payroll system

4. Joint Communication Strategy

Technical KSAE: Low level of System Integration as platform foundation is not affected by the joint communication strategy in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as required for the formation of the platform foundation in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution is not related for the communication strategy development for Queensland Health Payroll system

Relational KSAE: Medium level of System Integration as effective joint communication is required for the investor analysis in the project of Queensland Health Payroll system

5. Co-location Strategy

Technical KSAE: Medium level of System Integration as co-location activities would align the implication of the platform foundation in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as project management would be required for the implication of activities in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution would not be facilitated by the system integration for Queensland Health Payroll system

Relational KSAE: Low level of System Integration as co-location strategy would not be required for the platform foundation in Queensland Health Payroll system

Behavioural Factors (p. 119-120)

Elements

KSAE’s to maximize the effectiveness  (pp. 123-133)

6. Authentic Leadership

Technical KSAE: High level of Resilience as resilient behaviour would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Project Management KSAE: High level of Appreciativeness as appreciativeness would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Business Solution KSAE: Low level of Authenticity as authenticity would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

Relational KSAE: Low level of Spirit as spirit factor would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

7. Trust-Control Balance

Technical KSAE: Low level of forms of trust as forms of trust would have low impact on the project activity and align the trust control balance for Queensland Health Payroll system

Project Management KSAE: High level of autonomy as autonomy would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Business Solution KSAE: High level of Safe work cultures as Safe work cultures would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Relational KSAE: High level of trust relationship building as trust relationship building would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

8. Commitment to be Innovative

Technical KSAE: High level of testing, prototyping, and experimenting as testing, prototyping, and experimenting would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation as innovation would have medium impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Business Solution KSAE: High level of commitment to continuous innovation as commitment to continuous innovation would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Relational KSAE: Low level of commitment to continuous innovation as commitment to continuous innovation would have low impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

9. Common best-for-project Mindset and Culture

Technical KSAE: Low level of outcomes and performance levels as outcomes and performance levels would have low impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Project Management KSAE: High level of alignment of common goals as alignment of common goals would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Business Solution KSAE: Medium level of value for money reporting as value for money reporting would have medium impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Relational KSAE: High level of challenge for excellence as challenge for excellence would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

10. No-blame Culture

Technical KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Project Management KSAE: Medium level of rationale No-blame Culture as rationale No-blame Culture would have medium impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Business Solution KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Relational KSAE: High level of rationale No-blame Culture as rationale No-blame Culture would have high impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Processes, routines, and means (p. 121-122)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

11. Consensus Decisions

Technical KSAE: Low level of Cultural drivers as Cultural drivers would have low impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Project Management KSAE: High level of enablers of consensus as Cultural drivers would have high impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Business Solution KSAE: Medium level of inhibitors of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Relational KSAE: Medium level of enablers of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

12. Learning and Continuous Improvement

Technical KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Project Management KSAE: High level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have high impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Business Solution KSAE: Medium level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Relational KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

13. Incentive Arrangements

Technical KSAE: Low level of managing tension between innovation and incentivisation as managing tension between innovation and incentivisation would have low impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation and incentivisation as innovation and incentivisation would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Business Solution KSAE: High level of incentive arrangements as incentive arrangements would have high impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Relational KSAE: Medium level of incentive arrangements as incentive arrangements would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

14. Pragmatic Learning-in-Action

Technical KSAE: Low level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Project Management KSAE: High level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Business Solution KSAE: High level of coaching and mentoring as coaching and mentoring would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Relational KSAE: Medium level of coaching and mentoring as coaching and mentoring would have medium impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

15. Transparency

Technical KSAE: medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Project Management KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

Business Solution KSAE: Medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Relational KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

16. Mutual Dependence and Accountability

Technical KSAE: Low level of enhancing enablers of mutual dependency  as enhancing enablers of mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Project Management KSAE: High level of mutual dependency as mutual dependency would have high impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Business Solution KSAE: Medium level of enhancing enablers of mutual dependency as enhancing enablers of mutual dependency would have medium impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Relational KSAE: Low level of mutual dependency as mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Project 2: Governance and decision-making

The preferred form of procurement as an outcome from the negotiation process for Project 2 proposed in the PPMP20011 Projects Negotiation and Conflict Report was Fixed Price Procurement Contract type as it would help in utilizing the human labours to possibly best level.

The subthemes and KSAE’s that will best mitigate and reduce project claims and damages are itemized in the following tables.

  • Platform Foundation (p. 117-118)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

1. Motivation and Context

Technical KSAE: Medium Level of Experimental- motivation for forming the utilization of the motivation and context development of the activities for the platform development in Queensland Health Payroll system development.

Project Management KSAE: High Value of best value motivational for focusing on the implication of the project activities for the platform development for Queensland Health Payroll system development.

Business Solution KSAE: Low Level of Experimental- motivation as it is not included for the platform development for Queensland Health Payroll system development.

Relational KSAE: Medium Level of Relational rationale as it results in forming the rationale thinking required for the platform development for Queensland Health Payroll system development.

2. Joint Governance structure

Technical KSAE: Medium Level of Governance Processes as some activities would require implication of governance process for the platform development for Queensland Health Payroll system development.

Project Management KSAE: Low Level of Governance Processes as governance is related to the decision making and not involved for management operations

Business Solution KSAE: Medium Level of Governance best value strategy as business solution would require the implication of the effective strategy for the platform development for Queensland Health Payroll system development.

Relational KSAE: Low level of Governance Structure as the platform development for Queensland Health Payroll system development would imply the deployment of only technical activities

3. Integrated Risk Mitigation Strategy

Technical KSAE: High Level of System Integration as the deployment of the activities for platform dependent would be eased by the implication of the risk management.

Project Management KSAE: Medium Level of risk mitigation action as the integrated risk management would be a part of the project management operations in Queensland Health Payroll system

Business Solution KSAE: Medium Level of System Integration for utilizing the integrated risk mitigation strategy for the platform development for Queensland Health Payroll system

Relational KSAE: Medium Level of Risk Sharing conversation for forming the implication of the activities aligning with the utilization of the effective integration management for Queensland Health Payroll system

4. Join Communication Strategy

Technical KSAE: Low level of System Integration as platform foundation is not affected by the joint communication strategy in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as required for the formation of the platform foundation in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution is not related for the communication strategy development for Queensland Health Payroll system

Relational KSAE: Medium level of System Integration as effective joint communication is required for the investor analysis in the project of Queensland Health Payroll system

5. Co-location Strategy

Technical KSAE: Medium level of System Integration as co-location activities would align the implication of the platform foundation in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as project management would be required for the implication of activities in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution would not be facilitated by the system integration for Queensland Health Payroll system

Relational KSAE: Low level of System Integration as co-location strategy would not be required for the platform foundation in Queensland Health Payroll system

  • Behavioural Factors (p. 119-120)

Elements

KSAE’s to maximize the effectiveness  (pp. 123-133)

6. Authentic Leadership

Technical KSAE: High level of Resilience as resilient behaviour would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Project Management KSAE: High level of Appreciativeness as appreciativeness would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Business Solution KSAE: Low level of Authenticity as authenticity would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

Relational KSAE: Low level of Spirit as spirit factor would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

7. Trust-Control Balance

Technical KSAE: Low level of forms of trust as forms of trust would have low impact on the project activity and align the trust control balance for Queensland Health Payroll system

Project Management KSAE: High level of autonomy as autonomy would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Business Solution KSAE: High level of Safe work cultures as Safe work cultures would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Relational KSAE: High level of trust relationship building as trust relationship building would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

8. Commitment to be Innovative

Technical KSAE: High level of testing, prototyping, and experimenting as testing, prototyping, and experimenting would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation as innovation would have medium impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Business Solution KSAE: High level of commitment to continuous innovation as commitment to continuous innovation would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Relational KSAE: Low level of commitment to continuous innovation as commitment to continuous innovation would have low impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

9. Common best-for-project Mindset and Culture

Technical KSAE: Low level of outcomes and performance levels as outcomes and performance levels would have low impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Project Management KSAE: High level of alignment of common goals as alignment of common goals would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Business Solution KSAE: Medium level of value for money reporting as value for money reporting would have medium impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Relational KSAE: High level of challenge for excellence as challenge for excellence would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

10. No-blame Culture

Technical KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Project Management KSAE: Medium level of rationale No-blame Culture as rationale No-blame Culture would have medium impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Business Solution KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Relational KSAE: High level of rationale No-blame Culture as rationale No-blame Culture would have high impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

  • Processes, routines, and means (p. 121-122)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

11. Consensus Decisions

Technical KSAE: Low level of Cultural drivers as Cultural drivers would have low impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Project Management KSAE: High level of enablers of consensus as Cultural drivers would have high impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Business Solution KSAE: Medium level of inhibitors of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Relational KSAE: Medium level of enablers of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

12. Learning and Continuous Improvement

Technical KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Project Management KSAE: High level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have high impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Business Solution KSAE: Medium level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Relational KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

13. Incentive Arrangements

Technical KSAE: Low level of managing tension between innovation and incentivisation as managing tension between innovation and incentivisation would have low impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation and incentivisation as innovation and incentivisation would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Business Solution KSAE: High level of incentive arrangements as incentive arrangements would have high impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Relational KSAE: Medium level of incentive arrangements as incentive arrangements would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

14. Pragmatic Learning-in-Action

Technical KSAE: Low level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Project Management KSAE: High level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Business Solution KSAE: High level of coaching and mentoring as coaching and mentoring would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Relational KSAE: Medium level of coaching and mentoring as coaching and mentoring would have medium impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

15. Transparency

Technical KSAE: medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Project Management KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

Business Solution KSAE: Medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Relational KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

16. Mutual Dependence and Accountability

Technical KSAE: Low level of enhancing enablers of mutual dependency  as enhancing enablers of mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Project Management KSAE: High level of mutual dependency as mutual dependency would have high impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Business Solution KSAE: Medium level of enhancing enablers of mutual dependency as enhancing enablers of mutual dependency would have medium impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Relational KSAE: Low level of mutual dependency as mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

  • Project 3: People and change

The preferred form of procurement as an outcome from the negotiation process for Project 2 proposed in the PPMP20011 Projects Negotiation and Conflict Report was Fixed Price Procurement Contract type as it would help in utilizing the human labours to possibly best level.

The subthemes and KSAE’s that will best mitigate and reduce project claims and damages are itemized in the following tables.

  • Platform Foundation (p. 117-118)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

1. Motivation and Context

Technical KSAE: Medium Level of Experimental- motivation for forming the utilization of the motivation and context development of the activities for the platform development in Queensland Health Payroll system development.

Project Management KSAE: High Value of best value motivational for focusing on the implication of the project activities for the platform development for Queensland Health Payroll system development.

Business Solution KSAE: Low Level of Experimental- motivation as it is not included for the platform development for Queensland Health Payroll system development.

Relational KSAE: Medium Level of Relational rationale as it results in forming the rationale thinking required for the platform development for Queensland Health Payroll system development.

2. Joint Governance structure

Technical KSAE: Medium Level of Governance Processes as some activities would require implication of governance process for the platform development for Queensland Health Payroll system development.

Project Management KSAE: Low Level of Governance Processes as governance is related to the decision making and not involved for management operations

Business Solution KSAE: Medium Level of Governance best value strategy as business solution would require the implication of the effective strategy for the platform development for Queensland Health Payroll system development.

Relational KSAE: Low level of Governance Structure as the platform development for Queensland Health Payroll system development would imply the deployment of only technical activities

3. Integrated Risk Mitigation Strategy

Technical KSAE: High Level of System Integration as the deployment of the activities for platform dependent would be eased by the implication of the risk management.

Project Management KSAE: Medium Level of risk mitigation action as the integrated risk management would be a part of the project management operations in Queensland Health Payroll system

Business Solution KSAE: Medium Level of System Integration for utilizing the integrated risk mitigation strategy for the platform development for Queensland Health Payroll system

Relational KSAE: Medium Level of Risk Sharing conversation for forming the implication of the activities aligning with the utilization of the effective integration management for Queensland Health Payroll system

4. Join Communication Strategy

Technical KSAE: Low level of System Integration as platform foundation is not affected by the joint communication strategy in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as required for the formation of the platform foundation in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution is not related for the communication strategy development for Queensland Health Payroll system

Relational KSAE: Medium level of System Integration as effective joint communication is required for the investor analysis in the project of Queensland Health Payroll system

5. Co-location Strategy

Technical KSAE: Medium level of System Integration as co-location activities would align the implication of the platform foundation in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as project management would be required for the implication of activities in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution would not be facilitated by the system integration for Queensland Health Payroll system

Relational KSAE: Low level of System Integration as co-location strategy would not be required for the platform foundation in Queensland Health Payroll system

  • Behavioural Factors (p. 119-120)

Elements

KSAE’s to maximize the effectiveness  (pp. 123-133)

6. Authentic Leadership

Technical KSAE: High level of Resilience as resilient behaviour would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Project Management KSAE: High level of Appreciativeness as appreciativeness would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Business Solution KSAE: Low level of Authenticity as authenticity would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

Relational KSAE: Low level of Spirit as spirit factor would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

7. Trust-Control Balance

Technical KSAE: Low level of forms of trust as forms of trust would have low impact on the project activity and align the trust control balance for Queensland Health Payroll system

Project Management KSAE: High level of autonomy as autonomy would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Business Solution KSAE: High level of Safe work cultures as Safe work cultures would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Relational KSAE: High level of trust relationship building as trust relationship building would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

8. Commitment to be Innovative

Technical KSAE: High level of testing, prototyping, and experimenting as testing, prototyping, and experimenting would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation as innovation would have medium impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Business Solution KSAE: High level of commitment to continuous innovation as commitment to continuous innovation would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Relational KSAE: Low level of commitment to continuous innovation as commitment to continuous innovation would have low impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

9. Common best-for-project Mindset and Culture

Technical KSAE: Low level of outcomes and performance levels as outcomes and performance levels would have low impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Project Management KSAE: High level of alignment of common goals as alignment of common goals would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Business Solution KSAE: Medium level of value for money reporting as value for money reporting would have medium impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Relational KSAE: High level of challenge for excellence as challenge for excellence would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

10. No-blame Culture

Technical KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Project Management KSAE: Medium level of rationale No-blame Culture as rationale No-blame Culture would have medium impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Business Solution KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Relational KSAE: High level of rationale No-blame Culture as rationale No-blame Culture would have high impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Processes, routines, and means (p. 121-122)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

11. Consensus Decisions

Technical KSAE: Low level of Cultural drivers as Cultural drivers would have low impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Project Management KSAE: High level of enablers of consensus as Cultural drivers would have high impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Business Solution KSAE: Medium level of inhibitors of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Relational KSAE: Medium level of enablers of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

12. Learning and Continuous Improvement

Technical KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Project Management KSAE: High level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have high impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Business Solution KSAE: Medium level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Relational KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

13. Incentive Arrangements

Technical KSAE: Low level of managing tension between innovation and incentivisation as managing tension between innovation and incentivisation would have low impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation and incentivisation as innovation and incentivisation would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Business Solution KSAE: High level of incentive arrangements as incentive arrangements would have high impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Relational KSAE: Medium level of incentive arrangements as incentive arrangements would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

14. Pragmatic Learning-in-Action

Technical KSAE: Low level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Project Management KSAE: High level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Business Solution KSAE: High level of coaching and mentoring as coaching and mentoring would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Relational KSAE: Medium level of coaching and mentoring as coaching and mentoring would have medium impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

15. Transparency

Technical KSAE: medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Project Management KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

Business Solution KSAE: Medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Relational KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

16. Mutual Dependence and Accountability

Technical KSAE: Low level of enhancing enablers of mutual dependency  as enhancing enablers of mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Project Management KSAE: High level of mutual dependency as mutual dependency would have high impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Business Solution KSAE: Medium level of enhancing enablers of mutual dependency as enhancing enablers of mutual dependency would have medium impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Relational KSAE: Low level of mutual dependency as mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

  • Project 4: Funding

The preferred form of procurement as an outcome from the negotiation process for Project 2 proposed in the PPMP20011 Projects Negotiation and Conflict Report was Fixed Price Procurement Contract type as it would help in utilizing the human labours to possibly best level.

The subthemes and KSAE’s that will best mitigate and reduce project claims and damages are itemized in the following tables.

  • Platform Foundation (p. 117-118)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

1. Motivation and Context

Technical KSAE: Medium Level of Experimental- motivation for forming the utilization of the motivation and context development of the activities for the platform development in Queensland Health Payroll system development.

Project Management KSAE: High Value of best value motivational for focusing on the implication of the project activities for the platform development for Queensland Health Payroll system development.

Business Solution KSAE: Low Level of Experimental- motivation as it is not included for the platform development for Queensland Health Payroll system development.

Relational KSAE: Medium Level of Relational rationale as it results in forming the rationale thinking required for the platform development for Queensland Health Payroll system development.

2. Joint Governance structure

Technical KSAE: Medium Level of Governance Processes as some activities would require implication of governance process for the platform development for Queensland Health Payroll system development.

Project Management KSAE: Low Level of Governance Processes as governance is related to the decision making and not involved for management operations

Business Solution KSAE: Medium Level of Governance best value strategy as business solution would require the implication of the effective strategy for the platform development for Queensland Health Payroll system development.

Relational KSAE: Low level of Governance Structure as the platform development for Queensland Health Payroll system development would imply the deployment of only technical activities

3. Integrated Risk Mitigation Strategy

Technical KSAE: High Level of System Integration as the deployment of the activities for platform dependent would be eased by the implication of the risk management.

Project Management KSAE: Medium Level of risk mitigation action as the integrated risk management would be a part of the project management operations in Queensland Health Payroll system

Business Solution KSAE: Medium Level of System Integration for utilizing the integrated risk mitigation strategy for the platform development for Queensland Health Payroll system

Relational KSAE: Medium Level of Risk Sharing conversation for forming the implication of the activities aligning with the utilization of the effective integration management for Queensland Health Payroll system

4. Join Communication Strategy

Technical KSAE: Low level of System Integration as platform foundation is not affected by the joint communication strategy in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as required for the formation of the platform foundation in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution is not related for the communication strategy development for Queensland Health Payroll system

Relational KSAE: Medium level of System Integration as effective joint communication is required for the investor analysis in the project of Queensland Health Payroll system

5. Co-location Strategy

Technical KSAE: Medium level of System Integration as co-location activities would align the implication of the platform foundation in Queensland Health Payroll system

Project Management KSAE: Medium level of System Integration as project management would be required for the implication of activities in Queensland Health Payroll system

Business Solution KSAE: Low level of System Integration as business solution would not be facilitated by the system integration for Queensland Health Payroll system

Relational KSAE: Low level of System Integration as co-location strategy would not be required for the platform foundation in Queensland Health Payroll system

Behavioural Factors (p. 119-120)

Elements

KSAE’s to maximize the effectiveness  (pp. 123-133)

6. Authentic Leadership

Technical KSAE: High level of Resilience as resilient behaviour would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Project Management KSAE: High level of Appreciativeness as appreciativeness would alter the project activity and align the authentic leadership for Queensland Health Payroll system

Business Solution KSAE: Low level of Authenticity as authenticity would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

Relational KSAE: Low level of Spirit as spirit factor would have low impact on the project activity and align the authentic leadership for Queensland Health Payroll system

7. Trust-Control Balance

Technical KSAE: Low level of forms of trust as forms of trust would have low impact on the project activity and align the trust control balance for Queensland Health Payroll system

Project Management KSAE: High level of autonomy as autonomy would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Business Solution KSAE: High level of Safe work cultures as Safe work cultures would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

Relational KSAE: High level of trust relationship building as trust relationship building would have high impact on the project activity and align the trust control balance for Queensland Health Payroll system

8. Commitment to be Innovative

Technical KSAE: High level of testing, prototyping, and experimenting as testing, prototyping, and experimenting would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation as innovation would have medium impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Business Solution KSAE: High level of commitment to continuous innovation as commitment to continuous innovation would have high impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

Relational KSAE: Low level of commitment to continuous innovation as commitment to continuous innovation would have low impact on the project activity and align the commitment to be innovative for Queensland Health Payroll system

9. Common best-for-project Mindset and Culture

Technical KSAE: Low level of outcomes and performance levels as outcomes and performance levels would have low impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Project Management KSAE: High level of alignment of common goals as alignment of common goals would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Business Solution KSAE: Medium level of value for money reporting as value for money reporting would have medium impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

Relational KSAE: High level of challenge for excellence as challenge for excellence would have high impact on the project activity and align the common best-for-project mindset and culture for Queensland Health Payroll system

10. No-blame Culture

Technical KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Project Management KSAE: Medium level of rationale No-blame Culture as rationale No-blame Culture would have medium impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Business Solution KSAE: Low level of facilitating mechanism for No-blame Culture as facilitating mechanism for No-blame Culture would have low impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

Relational KSAE: High level of rationale No-blame Culture as rationale No-blame Culture would have high impact on the project activity and align the No-blame Culture for Queensland Health Payroll system

  • Processes, routines, and means (p. 121-122)

Elements

KSAE’s to maximize the effectiveness (pp. 123-133)

11. Consensus Decisions

Technical KSAE: Low level of Cultural drivers as Cultural drivers would have low impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Project Management KSAE: High level of enablers of consensus as Cultural drivers would have high impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Business Solution KSAE: Medium level of inhibitors of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

Relational KSAE: Medium level of enablers of consensus as Cultural drivers would have medium impact on the project activity and align the consensus decisions for Queensland Health Payroll system

12. Learning and Continuous Improvement

Technical KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Project Management KSAE: High level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have high impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Business Solution KSAE: Medium level of lessons learnt knowledge transfer as lessons learnt knowledge transfer would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

Relational KSAE: Medium level of capacity of new ideas as capacity of new ideas would have medium impact on the project activity and align the learning and continuous improvement for Queensland Health Payroll system

13. Incentive Arrangements

Technical KSAE: Low level of managing tension between innovation and incentivisation as managing tension between innovation and incentivisation would have low impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Project Management KSAE: Medium level of innovation and incentivisation as innovation and incentivisation would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Business Solution KSAE: High level of incentive arrangements as incentive arrangements would have high impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

Relational KSAE: Medium level of incentive arrangements as incentive arrangements would have medium impact on the project activity and align the incentive arrangements for Queensland Health Payroll system

14. Pragmatic Learning-in-Action

Technical KSAE: Low level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Project Management KSAE: High level of action learning as action learning would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Business Solution KSAE: High level of coaching and mentoring as coaching and mentoring would have high impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

Relational KSAE: Medium level of coaching and mentoring as coaching and mentoring would have medium impact on the project activity and align the pragmatic learning-in-action for Queensland Health Payroll system

15. Transparency

Technical KSAE: medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Project Management KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

Business Solution KSAE: Medium level of accountability as accountability would have medium impact on the project activity and align the Transparency for Queensland Health Payroll system

Relational KSAE: High level of transparency as Transparency would have high impact on the project activity and align the Transparency for Queensland Health Payroll system

16. Mutual Dependence and Accountability

Technical KSAE: Low level of enhancing enablers of mutual dependency  as enhancing enablers of mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Project Management KSAE: High level of mutual dependency as mutual dependency would have high impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Business Solution KSAE: Medium level of enhancing enablers of mutual dependency as enhancing enablers of mutual dependency would have medium impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Relational KSAE: Low level of mutual dependency as mutual dependency would have low impact on the project activity and align the mutual dependence and accountability for Queensland Health Payroll system

Aibinu, A. and Papadonikolaki, E., 2016, September. BIM Implementation and Project Coordination in Design-Build Procurement. In Proceedings of the 32nd Annual ARCOM Conference (pp. 15-24). Association of Researchers in Construction Management.

Allen, M., Herring, K., Moody, J. and Williams, C., 2015. Project procurement: impact of contract incentives and penalties. International Journal of Global Business, 8(2), p.1.

Brahm, F. and Tarziján, J., 2015. Does complexity and prior interactions affect project procurement? Evidence from mining mega-projects. International Journal of Project Management, 33(8), pp.1851-1862.

Carithers, L.J., Ardlie, K., Barcus, M., Branton, P.A., Britton, A., Buia, S.A., Compton, C.C., DeLuca, D.S., Peter-Demchok, J., Gelfand, E.T. and Guan, P., 2015. A novel approach to high-quality postmortem tissue procurement: the GTEx project. Biopreservation and biobanking, 13(5), pp.311-319.

Chen, Y.Y., 2016. A Study of Project Procurement Strategy: the Perspective of Game Theory.

Dahiru, A. and Bashir, A.M., 2015. Risk Factors Influencing Construction Procurement Performance in Nigeria. Arid Zone Journal of Engineering, Technology and Environment, 11, pp.77-88.

De Marco, A., 2018. Procurement Management. In Project Management for Facility Constructions (pp. 149-154). Springer, Cham.

Duffield, S. and Whitty, S.J., 2015. Developing a systemic lessons learned knowledge model for organisational learning through projects. International journal of project management, 33(2), pp.311-324.

Fuller, M.A., Valacich, J.S., George, J.F. and Schneider, C., 2017. Information Systems Project Management: A Process and Team Approach, Edition 1.1. Prospect Press.

Ismail, W.N.W., Isa, S.S.M. and Yusop, N., 2018. Ideal Construction Procurement System based on Transaction Cost Approach. International Journal of Academic Research in Business and Social Sciences, 8(1), pp.807-814.

Lewis-Faupel, S., Neggers, Y., Olken, B.A. and Pande, R., 2016. Can electronic procurement improve infrastructure provision? Evidence from public works in India and Indonesia. American Economic Journal: Economic Policy, 8(3), pp.258-83.

Lloyd-Walker, B. and Walker, D., 2015, April. Collaborative project procurement arrangements. Project Management Institute.

Morozov, V., Kalnichenko, O. and Liubyma, I., 2016, February. The models of procurement management and information technologies for hybrid project management. In Modern Problems of Radio Engineering. Telecommunications and Computer Science (TCSET), 2016 13th International Conference on (pp. 609-612). IEEE.

Morozov, V.V. and Liubyma, I.O., 2016. The integration models of procurement management of hybrid projects in development of project-oriented enterprises. Bulletin of NTU" KhPI". Series: Strategic Management, Portfolio, Program and Project Management, 6(2 (1174)), pp.22-25.

Mosley Jr, J.C. and Bubshait, A.A., 2017. Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(6), pp.1004-1017.

Muhammad, B.A., Adamu, T. and Ladi, B.D., 2015. Appraisal of construction project procurement policies in Nigeria. American Journal of Engineering Research, 4(3), pp.19-24.

Nawi, M.N.M., Haron, A.T., Hamid, Z.A., Kamar, K.A.M. and Baharuddin, Y., 2014. Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects. Malaysia Construction Research Journal (MCRJ), 15(2), pp.29-38.

Philip, K., 2015. Allied health: untapped potential in the Australian health system. Australian Health Review, 39(3), pp.244-247.

Qian, X., Huang, M., Ching, W.K., Lee, L.H. and Wang, X., 2018. Mechanism design in project procurement auctions with cost uncertainty and failure risk. Journal of Industrial & Management Optimization, pp.1-34.

Schwalbe, K., 2015. Information technology project management. Cengage Learning.

Sullivan, C., Staib, A., Ayre, S., Daly, M., Collins, R., Draheim, M. and Ashby, R., 2016. Pioneering digital disruption: Australia’s first integrated digital tertiary hospital. The Medical journal of Australia, 205(9), pp.386-389.

Tapia, R.M. and Gransberg, D.D., 2018. Case Studies in Managing Geotechnical Risks During Procurement for Design–Build Projects (No. 18-03515).

Thite, M. and Sandhu, K., 2014. Where is My Pay? Critical Success Factors of a Payroll System–A System Life Cycle Approach. Australasian Journal of Information Systems, 18(2).

Turner, J.R., 2017. Contracting for project management. Routledge.

Tursunbayeva, A., Bunduchi, R., Franco, M. and Pagliari, C., 2016. Human resource information systems in health care: a systematic evidence review. Journal of the American Medical Informatics Association, 24(3), pp.633-654.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2020). Maximizing Project Effectiveness With KSAEs And Subthemes. Retrieved from https://myassignmenthelp.com/free-samples/ppmp20011-project-claims-and-damages-report/business-solution.html.

"Maximizing Project Effectiveness With KSAEs And Subthemes." My Assignment Help, 2020, https://myassignmenthelp.com/free-samples/ppmp20011-project-claims-and-damages-report/business-solution.html.

My Assignment Help (2020) Maximizing Project Effectiveness With KSAEs And Subthemes [Online]. Available from: https://myassignmenthelp.com/free-samples/ppmp20011-project-claims-and-damages-report/business-solution.html
[Accessed 20 April 2024].

My Assignment Help. 'Maximizing Project Effectiveness With KSAEs And Subthemes' (My Assignment Help, 2020) <https://myassignmenthelp.com/free-samples/ppmp20011-project-claims-and-damages-report/business-solution.html> accessed 20 April 2024.

My Assignment Help. Maximizing Project Effectiveness With KSAEs And Subthemes [Internet]. My Assignment Help. 2020 [cited 20 April 2024]. Available from: https://myassignmenthelp.com/free-samples/ppmp20011-project-claims-and-damages-report/business-solution.html.

Get instant help from 5000+ experts for
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing: Proofread your work by experts and improve grade at Lowest cost

loader
250 words
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Plagiarism checker
Verify originality of an essay
essay
Generate unique essays in a jiffy
Plagiarism checker
Cite sources with ease
support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close