Free Sample   Sample Career Resume

100000+

Students can't be Wrong!

747553

Orders

4.9/5

Ratings

4974

PhD Experts

GET BEST GRADE, ORDER NOW

250 Words

Sample Career Resume

  362 Downloads   |   9 Pages 2,245 Words   |   Published Date: 16/06/2015

 

Resume of:

Career Objective: To achieve a respectable position in the power electronics field, through utilizing the academic and the professional skills. To attain this I would like to work in a innovative and participative working environment.

Educational Qualification:

B.Sc. in Electronics from Bharatiyar University

Grade:

Project Grade:

Post Diploma in Power Electronics from NTTF Training Institute.

Grade:

Project Grade:

Professional Experiences:

Currently working for American Power Conversion (APC) - A Schneider Electric Company Pvt. Ltd.

Tenure 1: October 2011 to December 2011

Main Project: “Charger current too low failure in Tomcat model”

Target of the Project: To ensure the failure of the TOMCAT reduced to 11% from current rate of 40%.

My role: Test Engineer in Plant 5

Major Role: To monitor the failures in the PCB level testing and to provide suitable actions

Tenure 2: May 2012 to July 2012

Main Project: “Automation of In-circuit Test program up-gradation”

Target of the Project: To ensure that each of the test system has the latest program and tester

My role: Senior Test Engineer in Plant 5

Major Role:

  • To take care of the testing materials for a given production line
  • To support the testing needs of the Indian manufacturing group
  • To ensure the safety measures
  • To conduct meeting with Cross-functional team and doing analysis of the breakdowns
  • To identify the defects in the process flow and to ensure 100% NPF
  • To up-grade the test equipments and conduct regular preventive maintenance
  • To provide training to the test engineers and to develop work instruction manuals for the test engineers

Tenure 3: August 2012 to October 2012

Main Project: “Programming failure reduction in Cheetha Model ”

Target of the Project: To ensure that not a single non-programmed board should go to UPS build line after conformal coating.

My role: Senior Test Engineer in Plant 5

Major Role:

  • To take care of the testing equipments
  • To ensure the safety precautions within the working areas and its adjacent areas
  • To conduct meeting with my team on the OEE and FTY issues
  • To implement test specifications in ATE using Lab View, C, C++
  • To develop prototype of new test equipments
  • To conduct training for the teat engineers and to develop training documents
  • To assist the engineers to develop hardware and the software
  • To test the engineering documentation
  • To develop safety awareness within the employees

Software Skills:

  • In-depth knowledge of Microsoft Office package (Word, Excel, Poewr point and Access)
  • Schneider Professional drawing program
  • Knowledge of Lab View, C and C++

Personal Information:

  • Full Name:
  • Date of Birth:
  • Nationality:
  • Contact Number:
  • E-mail ID:
  • Passport Number:
  • Validity Period:
  • Marital Status:

Career Episode -1

Duration: October 2011 to December 2011

Name of the Company: APC

Designation: Test Engineer

INTRODUCTION

C.E.1 : This project covers the period October, 2011 to Dececember,2011. I handled this project at American Power Conversion (APC) (where I am working)-A Schneider Electric Company (I) Pvt.Ltd,IDF5,#187/3¼/3 Jigani,Bangalore-562106,Karnataka,India.

 

My designation during this project was Test Engineer.

The project was -   ” Charger Current Too low Failure in Tomcat model”

BACK GROUND:

C.E.1.1 : The nature of the engineering project was to ensure that the failure target of TOMCAT ( UPS System) was kept at 11% as against the existing failure rate of 40%. The features of the TOMCAT ups system are:

  • 15-20kVA, Double conversion UPS
  • UPS can be configured as 3:3, 3:1 or 1:1 for single feed or dual feed.
  • In Bypass Mode, Inverter can work as PFC to keep charger and logic power supply functional incase PFC is unable to operate
  • Unit can be turned-on without batteries.
  • Smart Battery Management, through CAN communication between UPS and Battery Packs

C.E.1.2: The objective of the project was to ensure and keep the failure target of TOMCAT at 11% as against an existing failure rate of 40%. The other objective was to bring out much efficient performance of the product through minimizing the TOMCAT failure.

C.E.1.3: The nature of my particular work area was to closely monitor all the failures in the PCB level testing and provide corrective action. As a team member of DPU reduction team, I collected all failure rates related to this product in PCB functional test.

C.E.1.4: ORGANIZATION CHART

 manager

 table

In the above chart I am working in plant 5 as a Senior Test Engineer

C.E.1.5: My duties and responsibilities are as follows:

C.E.1.5A: As a member of test engineering team, I am responsible to take care of test relates equipment like In Circuit Testers (i.e Teradyne ICT machines), PCB Functional test jigs and test fixtures for UPS Testing.

C.E.1.5B: Responsible to ensure safety measures in work place and supporting to health and safety department to implement safety feature in testing area. Identifying risks and giving mitigation for identified risks.

C.E.1.5C: Schedule meeting in weekly basis with my team to discuss OEE (Overall Equipment efficiency), and FTY (First through Yield) and plan tasks for forthcoming week.

C.E.1.5D: Responsible to Implement test specifications in ATE using Lab View / C, C++             software.

C.E.1.5E: Constructs prototype of new test equipment and work with construction test team to debug of high volume production test hardware and software.

C.E.1.5F: Modifies existing test hardware and software to support new products and validate new designed test jigs.

C.E.1.5G: Conduct training session to test group on new test setup and preparing work instruction to operate.

C.E.1.5H: Assists design engineers in the development of hardware and software to meet detailed test specifications and works with design engineering to correct design related problems.

C.E.1.5I: Drafts and reviews test engineering documentation to ensure accuracy.

C.E.1.5J: Completes all fixture release procedures, including documentation, checklist, and specifications.

C.E.1.5K: Test and evaluate new and alternate sourcing of instruments and spare parts.

C.E.1.5 L: To conduct safety training and awareness to test jig users periodically.

C.E.1.5 M: Ensure all preventive maintenance and checks for instrument calibration   dues.

C.E.1.6: PERSONAL WORKPLACE ACTIVITY

C.E.1.6A: How you applied your engineering knowledge & skills:

  1. In my POST Diploma in Power Electronics ( NTTF Training Center,)second semester I have learned Microcontroller 8086.This helped me to understand the functionally and the response of the programming IC
  2. In my POST Diploma in Power Electronics ( NTTF Training Center,)second semester I have learned PIC microcontroller .This helps me to understand the functionality of the RTC µC
  3. In My B.Sc. Electronics which I have completed from Bharatiyar University I have Learned Microcontroller 8085 which helps me in understanding the functionality of RTC µC

C.E.1.6B: Tasks delegated to me & how I accomplished them

The test process that was followed was to do the ICT test then programming and then send the board for conformal coating. After doing the conformal coating the boards will be send to the final build line for assembling to ups. The assembled ups will be undergoing final test if the RTC board is not programmed it will fail in the start up. We were not doing any verification for the board whether it is programmed correctly and there is no Quasar entry for this board (Quasar is database for checking the pass or fail of board with the board serial number). Operator in a tracking sheet tracked this where some time the operator fails to update and it was human depended. As per the procedure is concern, there is a switch that the operator needs to select in the RTC board for doing programming. Sometimes if the operator forgets to select the switch in the right-position and it will program wrongly.

 

To overcome this failure I have made an automated test setup to perform the programming verification before sending to the conformal coating. I have designed a BON (bed of nails) which can be interfaced with Functional tester. The bon consist of a controller unit which is used in the UPS .In the ups the Rtc board will be connected to a main controller. As per the main controller instruction, it is performing the function. My idea is to simulate the same this by powering up the controller .The controller will be interfaced with a computer that is loaded lab view program. The communication with the controller and the computer will be mode bus communication. Through mode bus communication, the computer is checking the hex data present in the address lines whether it is programmed or not.

For the following test steps of functional test it is necessary to put the RTC1 PCBA under full operation, this means that serial communication with Application PCBA µC via CMX1 PCBA has to be established to read out values of RTC1 PCBA and to check all functionality of PVO1 µC.

For that reason, it is necessary to connect the RTC1 PCBA via S400 connector and via a CMX1 PCBA to an AIC electronic control block (application - , display - , terminal - , HHP_I1 - and HHP_MC1 - PCBA). In addition, test equipment (e.g. a LABVIEW tester) with modbus communication function (or PC with “MBU-PARAM” software tool) has to be connected to the electronic control block to exchange data with RTC1 µC via application PCBA software interface.

Following software has to be used on AIC electronic control block (inside fixture):

Application PCBA:              

1   (XCAPP_iX1.1IE06#1.mot)

HHP_MC1 PCBA:              

(XCLC1_iX1.1IE02#9.run)

RTC1: (device under test):     (XCRTC1_X1.1IE02#1.hex)

This step is only necessary, to check at beginning whether the content of the EEPROM and software version of AIC controlblock (parts of fixture) are O.K.

First power up to build up the configuration for modbus communication

-Apply +24V ±0,2V DC at HHP_I1 PCBA from P24M1 (X4-2,4,9) to 0VM (X4-1,3,8)

-Apply +5V ±0,1V DC at HHP_MC1 PCBA from P5F (X1-18,24,38) to 0VF (X1-20,32,36)

-Apply +15V ±0,1V DC at HHP_MC1 PCBA from P7F (X1-12) to 0VF (X1-20,32,36)

Next is modbus diaog setup by start the labview modbus communication tool. modbus address “248” since this value is always accepted.

-Read object MODE until this object become “OK”; timeout = 1min

-Write 0x0002 to object PARA to enable parameter access via modbus

- Write 0x23FF to object SVCD to enable RTC1 test parameters

RS422 communication RTC1-APP:

First power up to build up the configuration for modbus communication

-Apply +24V ±0,2V DC at HHP_I1 PCBA from P24M1 (X4-2,4,9) to 0VM (X4-1,3,8)

-Apply +5V ±0,1V DC at HHP_MC1 PCBA from P5F (X1-18,24,38) to 0VF (X1-20,32,36)

-Apply +15V ±0,1V DC at HHP_MC1 PCBA from P7F (X1-12) to 0VF (X1-20,32,36)

Next is modbus diaog setup by start the labview modbus communication tool. modbus address “248” since this value is always accepted.

-Read object MODE until this object become “OK”; timeout = 1min

-Write 0x0002 to object PARA to enable parameter access via modbus

- Write 0x23FF to object SVCD to enable RTC1 test parameters

-Wait 5sec. after Modbus communication has been established

- Read object RTST to verify if RS422 connection between application and RTC1 PCBA is working; timeout = 10s.The response should be 0x0001

-Read RTC1 software version

-Check self test Results

Read object RTER to verify if selftest results after power up are O.K.; timeout = 10s

The response should be 0x0001

Read RTC1 software version

Read object RTST to verify if RS422 connection between application and RTC1 PCBA is working; timeout = 10s

Power off

Switch OFF all power supplies from above “Power ON” test step (24V, 5V, 15V)

After this the test is completed the serial number of the board will be send to Quasar

Any particular difficulties/problems you encountered and how you solved them

First I have planned a manual test setup to verifying the RTC boards .With a pc and jig verify the board and then send the serial number manually to the Quasar (serial number tracking database). Then I found that it is not a full proof system and there is a chance of operator to skip the test. The I discussed with the lab view engineer to develop a lab view program .After confirmation I have made BON which can be interface with the fixture then with the help of lab view program the quasar entry will be automated and the problem is solved.

Summery

My view of the overall project is that all the objectives of the project were met i.e. Programming failure reduction in Cheetha Model.

The project met is its goal i.e. (a)After impimenthin the programming verification test I have noticed zero failure in the ups build line (b) No board are moving to scrap because the failure able to monitor before conformal coating itself (c) saving the cost of 37872$ per annum.

 

I was fully involved in the project and I have received appreciation certificate from management for cost saving of USD 37872 per annum. I was able to apply my knowledge and work skills to deliver the requirements of the project. I was able to apply design techniques, and function independently and as a team.

MyAssignmenthelp.com delivers assignment help to millions of students of USA. We have in-house teams of assignment writers who are experts on wide ranges of subjects. We have appointed teams of native writers who provide assignment help to students in New York City and all over the USA. They are skilled assignment writers who successfully cater to search terms like’ do my assignment in the USA' and readily entertain queries related to write my assignments.

Most Downloaded Sample of No Subject

  215 Download  |   2 Pages 339 Words

Question:Discuss about the professional developers comprehend software? Answer:I have been working in the USA Technologies for nine months now, and it ...

Read More

  155 Download  |   3 Pages 654 Words

Question:Describe about the Rethinking Oil Nationalism? Answer:1. The engineering discipline that I have chosen is Mechanical Engineering and I have se...

Read More

  132 Download  |   6 Pages 1,441 Words

Question:Explain about the Advertising for An integrated marketing communication perspective? Answer:Introduction:Social media has become the part of...

Read More

  0 Download  |   3 Pages 561 Words

Question:Discuss about the Comprehensive Model of Interpersonal.   Answer:Introduction:The meteorological analogy given by Mr. Andy Grove, Cha...

Read More

  181 Download  |   3 Pages 514 Words

In the article, Kohn (2006) has argued that homework is not only needless but also counterproductive for children. The author adopts a contextual review method to pro...

Read More

  363 Download  |   7 Pages 1,553 Words

Tourism AustraliaTourism Australia has established 13 offices all around the globe to target 22 of its most advantageous markets. The key strategy behind the adve...

Read More

  243 Download  |   5 Pages 1,108 Words

THE ERA OF GLOBALIZATIONToday’s world is by and far moving at a jet set speed and an exponential rate towards the horizon of collaborating the whole world i...

Read More

  362 Download  |   9 Pages 2,013 Words

Feelings or No feelingsMilgram’s experiment was a fascinating thing done to a group of people resulting into more fascinating insight into the behaviors, fe...

Read More

  364 Download  |   5 Pages 1,136 Words

AbstractEngineers are the pioneer for global development and professionals are catalysts for problem solving but void of any rules, regulations, code of conduct o...

Read More

  0 Download  |   13 Pages 3,228 Words

QuestionDiscuss about the Motivational Skills in Project Management.  Answer:Introduction:In the present time, the main focus of the project man...

Read More

  0 Download  |   6 Pages 1,333 Words

Question:Discuss about the Impact of Globalization in Living Standard.  Answer:IntroductionContemporary industries and businessperson follow glo...

Read More

  0 Download  |   15 Pages 3,659 Words

Question:Discuss about the Singapore Productivity Growth Sluggish.  Answer:IntroductionThis essay outlines the different macroeconomic events ...

Read More

  185 Download  |   2 Pages 277 Words

  The economic conditions are dynamic in nature therefore it is important to keep the track of the digitization and innovation that is happening across ...

Read More

  209 Download  |   6 Pages 1,319 Words

IntroductionPlanning process means to prepare for the future. The future outcomes are determined by the organizational plans of the present (Zwikael & Globers...

Read More

  221 Download  |   7 Pages 1,511 Words

INTRODUCTION  The logistics management is an act of managing the supply chain which involves the transfer of goods as well as services from the poin...

Read More

  267 Download  |   8 Pages 1,843 Words

IntroductionThe norms of culture have been misunderstood for emotional abuse within the indigenous population. This time it had been the Yorganop group, the agenc...

Read More

  99 Download  |   5 Pages 1,176 Words

Introduction  The media has been in a changing and dynamic form ever since the newer technologies have changed the paradigm of thinking (Anderson &a...

Read More

  40 Download  |   10 Pages 2,358 Words

"(Name)" is the current principal of my school (School name) with a leadership term of above 30 years. The journey of *--- as a leader was full of tribulations, cha...

Read More

  154 Download  |   3 Pages 558 Words

 An intriguing issue to look at in the migration aspect is the thing that happens when women get abandoned. Spouses who migrate leave their wives to take car...

Read More

  243 Download  |   5 Pages 1,056 Words

 The significance of the primaries in 2008 can be seen as the first since 1928 that no occupant leader was in the race for the democratic designation. Furthe...

Read More