Get Instant Help From 5000+ Experts For
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing:Proofread your work by experts and improve grade at Lowest cost

And Improve Your Grades
myassignmenthelp.com
loader
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Guaranteed Higher Grade!
Free Quote
wave

Only one student per group is to submit the reports through the vUWS submission links. Groups should aim to submit early and view the originality report. This will allow you to identify any parts of your assessment you have accidentally plagiarised. Students are encouraged to edit and resubmit before the due date! Submission of drawings and other collected documents is required for the final report through a separate submission link in vUWS. Any drawing or document that is referenced in the report should be attached to this link.


Do not attach full drawings to the report. A submission link will be available in the assessment folder in vUWS 1 week before the due dates.You will be required to submit this assessment through Turnitin. Ensure that you do not cut and paste from your sources as this will be identified in Turnitin as plagiarism. You are required to paraphrase and provide in-text references to support your discussions. Make sure that you provide a full reference list at the end of the assessment.

Location and Subdivision

The objective of the report is to enhance the design of a warehouse building. The analysis of a structure is essential as the reliability quality of the structure is explored. Can the building withstand the loading conditions? That is the issue solicited amid most from the investigation. The structural investigation is basic since it distinguishes the basic parts that need extraordinary consideration. Moreover, the analysis comprehends the plan of the structure in more detail. All aspects of the structure has a reason and this ought to be recognized before any alterations are made.

The location of the site is located along Beaconsfield street, and also be accessed through O’Riordan street or Doody street as demonstrated.The structure to be dissected is a warehouse building used to store cultivating gear and items. The building encounters a great stresses on different parts being applied by several load conditions. It is not possible to do an analysis of the whole building at once. Therefore, for a comprehensive analysis the structure is sub divided into portions for easier analysis. Additionally, unique parts of the building serve more imperative parts than others. In this report the roof truss, joints and column support are thought to be the most essential parts.

Steel schedule

Properties

Section

Number

Length (ft)

Total length

Weight/length

Total weight of steel (pounds)

W 14 X 132

2

30

60

132

7920

W 14 X 120

2

40

80

120

9600

W 16 X 40

7

30

210

40

8400

W 27 X 94

2

40

80

94

7520

W 18 X 50

5

40

200

50

10,000

W 14 X 43

2

30

60

43

2580

W 18 X 84

9

25

225

84

18,900

W 14 X 109

12

25

300

109

32700

W 24 X 68

2

44

88

68

5984

Cost

Properties

Section

Number

Length (ft)

Total length

Cost per length

Total cost

W 14 X 132

2

30

60

$50

$3000

W 14 X 120

2

40

80

$46

$3680

W 16 X 40

7

30

210

$28

$5880

W 27 X 94

2

40

80

$35

$2800

W 18 X 50

5

40

200

$30

$6000

W 14 X 43

2

30

60

$25

$1500

W 18 X 84

9

25

225

$40

$9000

W 14 X 109

12

25

300

$48

$14400

W 24 X 68

2

44

88

$38

$3344

Duration of completion

The schedule showing the site activities that will be carried out from the beginning to the end while specifying the number of days shows that a total of 303 days are fully required, for all the activities to be tackled. 

S.No

Activity description

Duration in days

Comment

1

Quantity survey

7

2

Order material

5

3

Delivery and storage of material

25

For every shipment

4

Drawing preparation of the warehouse of structural steel

12

5

Preparation of the warehouse joist

12

6

Drawing preparation of warehouse deck

12

7

Drawing preparation of warehouse miscellaneous steel

12

8

Warehouse drawing approval structural steel

12

For every batch

9

Drawing approval  of the warehouse joist

12

10

Approval of the warehouse deck

12

11

Drawing approval  of the warehouse miscellaneous steel

12

12

Fabrication of the warehouse  steel

15

For every lot

13

Fabrication of the warehouse joists

25

14

Fabrication of warehouse deck

25

15

Fabrication of the warehouse miscellaneous steel

10

16

Building of the warehouse structural steel including joist

25

For every sequence

17

Building of the warehouse deck

25

18

Building of warehouse of miscellaneous steel

20

19

Inspection of the warehouse and testing fabrications

20

Inspection of the warehouse and testing building

5

From the Intec steel warehouse, the clerk of work whom we got from the site, was not willing at the first instance to pay attention to our questions and request to acquire part of the documentation that he was holding, this was because more critical work was going on by the site workers and he was supposed to explain and countercheck on each progress throughout the site and at the same point he thought we are investigators, but later he agreed and allowed us to take photo for the floor plan and the plan connections plan, that comprises of roof truss connection, beam to column connections for both welding and bolts at all the joints.

The site was first visted on 20th August 2018, and a duration of approximately one hour was taken, we also visited the 28th August 2018 and approximately one hour too was taken by the group members. We were granted entry first by the security guard of the site, and directed as to the clerk of work who was also present in the site, who granted us permission to atleast learn on the site, we were able to see beam to column end plate connection, column base connection, roof truss and bracing and bracing connections.

Steel Schedule

The calculations involve in designing the core connection of the warehouse, which includes, beam to column end plate connection, column base connection, roof truss and bracing and bracing connections

Beam to column  end plate connection

Ref

Calculations

Output

BS EN

1993-1-1

NA 2.4 (Gardner and Nethercot, 2011)

BS EN

10025-2

Table 7(REAL, Couto, Lopes and Rodrigues, 2010.)

BS EN

1993-1-1

NA 2.15

Access steel

document

SN013a-EN-EU

3.5, Table 3.3

Access Steel

document

SN014a-

EN-EU

BS EN

1993-1-1

6.1(1)

Table 2.1

BS EN

1993-1-8

NA 2.3

Table NA.1

Access Steel

document

SN018a-

EN-EU(Bureau, 2006.)

SN014a-

EN-EU

3.6.1 &

Table 3.4

Steel

document

SN014a-EN-EU(Bureau, 2006.)

3.6.1 &

Table 3.4

BS EN

1993-1-

8:2005 3.7

BS EN

1993-1-1

6.2.6(2)

Access Steel

document

SN014a-ENEU

3.6.1 &

Table 3.4

The initial size of the components of the connection

Column 254 × 254 × 73 UKC in S275 steel

Beam 457 × 191 × 82 UKB in S275 steel

For the beam, fy = 275 N/mm2; fu = 410 N/mm2;

hb = 460mm;

tw = 9.9mm; tf = 16mm

For the plate, fu = 410 N/mm2

VcRd =  = 723 kN

Design shear force at ULS,VEd = 230 kN

Since 230 < 0.75 Vc,Rd , a partial depth endplate is proposed.

hb< 500 mm, so 8 or 10 mm endplate is proposed.

End plate depth is minimum 0.6 hb = 276 mm; propose 280 mm.

Take M20 bolts, number of bolts = 239/74 = 3.2

6 M20 bolts are proposed.

Bolt details

The bolts are fully threaded, non-preloaded, M20 8.8, 60 mm long.

Tensile stress area of bolt As = 245 mm2

Diameter of the holes d0 = 22 mm

Diameter of the washer dw = 37 mm

Yield strength fyb = 640 N/mm2

Ultimate tensile strength fub = 800 N/mm2

Limits for locations and spacing of bolts

End distance e1 = 55 mm

Minimum = 1.2d0 = 1.2 × 22 = 26.4 mm < 55 mm, OK

Edge distance e2 = 50 mm

Limits are the similar as those for end distance.

Minimum = 1.2d0 = 1.2 × 22 = 26.4 mm < 50 mm, OK

Spacing p1 = 85 mm

Minimum = 2.2d0

2.2d0 =   2.2 *22 = 48.4 mm < 85 mm, OK

14tp = 14*10 =140 mm > 85 mm

Spacing  on the horizontal gauge p3 = 100 mm

Minimum = 2.4d0

2.4d0 =  2.4*22 = 52.8 mm < 100 mm, OK

Weld design

For full strength “side” welds

Throat (a)  0.39 × tw

a  0.39 × 9.9 = 3.86 mm; adopt throat (a) of 4mm,

leg = 6 mm

Partial factors for resistance

M0 = 1.0

M2 = 1.25 (for shear)

M2 = 1.1 (for bolts in tension)Mu = 1.1

The partial factor for resistance Mu is used for the tying resistance.

Elastic checks are not appropriate; irreversible deformation is expected.

The connection should be ductile in order to satisfy design requirement that act as nominally pinned. For the UK, and based on SN014, the ductility requirement satisfies the end plate, which comply to the following conditions:

tp =

    =  = 12 mm

Since tp = 10 mm < 12 mm, ductility is ensured.

Bolts in shear

Assuming the shear plane passes through the threaded portion of the bolt, the shear resistance FV,Rd of a single bolt is given by:

FV,Rd =

Introducing a factor of 0.8 to allow for the presence of tension in the bolts.

For bolt class 8.8, take  v = 0.6, therefore,

FV,Rd =  = 75.2 kN

For 6 bolts, VRd,1= 6 × 75.2 = 451 kN

End plate in bearing

The bearing resistance of a single bolt, Fb,Rd is given by:

   Fb,Rd   =

For end bolts,

b =min( min(0.83;1.95;1.0) = 0.83

For inner bolts,

b =min(min (1.04 ; 1.95 ; 1.0)= 1.0

Therefore k1 = min(2.8 

= min(2.8= minimum (4.66; 2.5) = 2.5

Therefore, for the end bolts,

Fb,Rd   =  = 136.1 kN

And for the inner bolts,

Fb,Rd   =  = 164.0 kN

The bearing resistance of the bolts

= 2 ×136.1 + 4 × 164 = 928 kN

Group of Fasteners

The shear resistance value = 75.2 kN this valueis less than the bearing resistance, to determine the  resistance of the group of fasteners is equal to the number of fasteners multiplied by the small design resistance which we take 75.2 kN

Resistance of the group = 6 × 75.2 = 451 kN

Beam web in shear

Shear resistance is checked only for the area of the beam web connected to the end plate.

Vpl,Rd =

Introduction of 0.9 is used to calculate the plastic shear resistance of a plate

Vpl,Rd =  = 396 kN

The design shear resistance of the connection is

396 kN, > 230 kN, OK

Tying resistance of end plate

Bolts in tension

The tension resistance for a single bolt is given

  Ft,Rd =

K2 = 0.9

Ft,Rd =  = 160.4 kN

For 6 bolts, Ft,Rd = 6*160.4 =  962 kN

VEd = 230 kN

Weld throat

thickness,

a = 4 mm

Leg = 6 mm

VRd,1 = 451 kN

VRd,2 = 928 kN

VRd,8 = 396 kN

NRd,u,1 = 962 kN

Column base connection

Ref

Calculations

Outcome

BS EN

1990-1-1

NA 2.2.3.2

Table NA

A1.2(B)

BS EN

1992-1-1

Table 3.1(Beeby and Narayanan, 2005)

BS EN

1992-1-1

NA 2

Table NA 1

BS EN

1992-1-1

NA 2

Table NA 1

BS EN

1993-1-8

6.2.5(4) (Gardner and Nethercot, 2011)

Design conditions for column

Characteristic force due to permanent action, FG,k = 466 kN

Characteristic force due to variable action, FQ,k = 416 kN

Ultimate Limit State (ULS)

Partial factors for actions

Partial factor for permanent action G = 1.35

Partial factor for variable action Q = 1.5

Reduction factor  ξ = 0.925

Combination of actions for ULS

Design value of combined actions

NEd = 0.925 × 1.35 × 466 + 1.5 × 416 = 1206 kN

Column details

Serial size 254 × 254 × 73 UKC in S275 steel

Height of section h = 254.1 mm

Breadth of section b = 254.6 mm

Thickness of flange tf = 14.2 mm

Thickness of web tw = 8.6 mm

Cross sectional Area A = 93.1 cm2

Section perimeter = 1490 mm

Partial factors for resistance

MO = 1.0   M2 = 1.25

Base plate details

Strength of foundation concrete to be C25/30

( fck =30 N/mm2)

fcd =

   =

= 17 N/mm2

Area required =  = 70941 mm2

Effective area ≈ 4c2 + Section perimeter × c + section area

where c is the cantilever outstand of the effective area, as shown

below.

70941 = 4c2 + 1490c + 9310

Solving, c = 37.6mm

=

=

= 112.9  > 37.6 mm

Therefore there is no overlap between the

Flanges

Thickness of base plate (tp)

tp =  = 16.2 mm

tp < 40, therefore nominal design strength = 275 N/mm2.

Adopt 20mm thick base plate in S275 material

Connection of base plate to column

Assuming the axial force to be transferred by direct bearing, this is achieved through normal fabrication processes.  Nominal welds are needed in connection of the baseplate to the column, where in a full profile 6mm fillet welds are always considered.

Axial force

NEd = 1206 kN

fcd = 17 N/mm2

tp = 20 mm

Roof Truss

Ref

Calculations

Outcome

BS EN 1991-

1-1

Tables 6.9 &

6.10

NA 2.2.3.2

Table

NA.A1.2(B)

6.1(1)

NA 2.15

NA 2.4

BS EN

10210-1

Table A3(Brettle and Brown, 2009)

Eq.(6.10) for

Class 3

Sections

BS EN 1993-

1-1

NA 2.23

The truss that is designed  supports a roof that is only accessible during a normal maintenance and repair. The truss has a span of 14 m and also having 15° pitch. The imposed roof load due to snow obtained from BS EN 1991-1-3 is less than 0.6 kN/m2, therefore the characteristic imposed roof load is taken from BS EN 1991-1-1. The truss uses hollow sections for its tension chord, rafters, and internal members. The truss is fully welded.

Carrying out a truss analysis involves placing concentrated loads at the joints of the truss. At this point let us assume that the joints are pinned in the analysis and therefore only axial forces will carried by members.

Characteristic actions

Permanent actions

Self-weight of roof construction 0.75 kN/m2

Self-weight of services 0.15 kN/m2

Total permanent actions 0.90 kN/m2

Variable actions

Imposed roof load 0.60 kN/m2

Total imposed action 0.60 kN/m2

 

Ultimate Limit State (ULS)

Partial factors for actions

Partial factor for permanent action G = 1.35

Partial factor for variable action Q = 1.5

Reduction factor  ξ = 0.925

Design value of combined actions

= 0.925 × 1.35 × 0.9 + 1.5 × 0.6 = 2.02 kN/m2

Design values of combined actions on purlins supported by truss

For the distance of 3.5 m between purlins centre to centre

Design value = 2.02 *3.5/ cos150 = 7.32 kN/m

Design value of combined actions on truss

For a purlin span of 6 m

Fd = 7.32 * 6 = 43.92 kN

Truss analysis (due to forces Fd )

Reaction force at support A RA  =2 *Fd = 87.8 kN

At joint A = FAB  *sin150 + (RA-W/2) = 0

        FAB * cos150 + FAC = 0

At joint B  FBC + W*cos15o = 0

FBD - FAB - W *sin150 = 0

At joint C FBC *sin750 + FCD * sin300 = 0

FCE – FAC - FBC *cos750 + FCD *cos300 = 0

Partial factors for resistance

MO = 1.0 

M1 = 1.0  

 M2 = 1.25

Design of Top Chords Maximum design force = 255 kN

(compression)

Try 100 * 100 * 5 square hollow section in S355 steel

Material properties:

modulus of elasticity E = 210000 N/mm2

steel grade S355 and thickness  16 mm

Yield strength fy = 355 N/mm2

 =  = 0.81

Section properties:

Depth and width of section h, b = 100 mm

Thickness t = 5 mm

Radius of gyration iz = 38.6 mm

Area A = 1870 mm2

Classification of the cross-section:

c = 100 – 3 × 5 = 85 mm

 = 17

Class 3 limit = 42e = 42 × 0.81 = 34.

17 < 34, so the section is at least class 3

Compression resistance of the cross-section:

Nc,Rd =  =  = 663 kN

Therefore, the compressive design resistance is adequate.

Flexural buckling resistance:

Determine the non-dimensional slenderness for flexural buckling:

 =

Where, Lcr = 1.0 *LAB =  = 3623 mm

Therefore, λ1 =  =  = 76.4

 =  =

Determine the reduction factor due to buckling

X =

Where, 0.5[1 +

And

0.5[1 +

   = 1.36

X =

  = 0.52

Nb,Rd =  =  = 345 kN

Therefore, the design flexural buckling resistance of the selected

100 × 100 × 5 SHS is satisfactory.

Design of bottom chords

Maximum design force = 246 kN (in tension)

The bottom chord will also be a 100 × 100 × 5 SHS, S355. By inspection, the design tension resistance is equal to the design plastic resistance of the cross section.

Npl,Rd =  =  = 663 kN

663 kN > 246 kN, OK

Design of internal members

Maximum design compression force = 42 kN

Maximum design tension force = 82 kN

Maximum length in compression is = 970 mm

Try a 70 × 70 × 5 SHS, in S355 steel.

Following the same design process as above, the following resistances can be calculated:

Flexural buckling resistance (Lcr = 970mm), Nb,Rd = 419 kN

Tension resistance, Npl,Rd = 450 kN

Thus all internal members will be selected as

70 × 70 × 5 SHS, in S355 steel.

Serviceability limit state (SLS)

The deflections should be checked under un-factored variable loads and that permanent load should not be included.

Partial factors for actions

Partial factor for permanent action G = 1.0

Design value of combined actions

= 1.0 * 0.6 = 0.6 kN/m2

Design value of combined actions on truss

= 6 × 0.6 × 3.5/Cos 150 = 13.0 kN

Deflection

The maximum allowable deflection is assumed to be span/300;

Span/300 = 14000/300 = 46.67 mm.

The maximum deflection of the truss is obtained for the SLS value of combined actions (i.e. Fd = 13.4 kN). The deflection at the apex was found to 6.4 mm when all of the joints are assumed to be pinned. Deflection is therefore satisfactory.

Connections

Protecting the joint will depend on the type of joint, joint geometry and the powers subjected to the individuals members.

The obstruction of joint is checked at the design stage, so proper individuals can be guaranteed that notwithstanding the individuals opposing the design load, the joints can likewise exchange the part powers without reinforcing.

The design of hollow section joints is shrouded in BS EN 1993 - 1-8

Fd = 43.92 kN

FAB = –255 kN

FAC = 246 kN

FBC = –42 kN

FBD = –243 kN

FCD = 82 kN

FCE = 164 kN

NEd =255 kN

The section is at

least Class 3

Nc,Rd > NEd

NEd = 246 kN

Npl,Rd > NEd

NEd = 42 kN

Loading on the structure and strength calculations 

It should note that loads will act on different parts of the structure almost all directions. In some cases the load will acts alone while other times simultaneously. Loads which will result into production of the highest stresses will be used for analysis of the building.

Usually those structures ought to be intended to oppose forces that may cause damage. Structures ought to be solid and hardened to withstand the stresses caused by the acting loads. It is in this way essential to know the foreseen loading conditions. Calculations of the loads following up on a structure allowable stress values for design. These qualities decide the plan of the joints, beams and columns utilized in developing the building. Structures are intended for a particular reason.

Loads on structures are ordered into two major classes. Gravity loads and parallel loads. Gravity loads pull vertically downwards because of gravity while parallel loads act in the level bearing.

Connection detail

Column Analysis

The columns mandate is to link the foundation and the roof truss, the main stresses that are projected to the column are snow load and wind load, where buckling of the column will be resulted by the snow load, whereas the wind load will result to column to act as a cantilever beam having distributed load.

Column base Joint

The column base is expected to be strong and firm in order to be able to provide rigidity that will be required during vibrations. The role of the base is to give support to the column that supports the roof truss and also the walls of the entire building. This is an indication that the base strength need to be extreme higher 

In addition, the loads acting on the bolt will depend on the loads that are acting on the column. The loads will incorporate; wind load and column weight. These loads apply compression, tension and shear forces on the bolt. In some cases the forces may act together for instance tension and compression or the forces can act alone. Bearing weight on the bolt because of the plate is additionally experienced on the bolt.

The wind load acting on the side of the column creates a bending moment at the base. The bending moment of the jolt results to one portion of the bolt encountering strain and the other half compression. The point load at the highest point of the column because of the snow load and load of the column itself, results to compression at the base subsequently helping in the tying down. This thus lessens the bending moment of the bolts caused by the wind load. This prompts the conclusion that the wind load is most basic load acting on the bolts.

Core Connections

Bracing analysis

The bracing are predominantly intended to shield the columns and assemblies of trusses from the wind load. They are found on the sides of the building where the wind first comes into contact.

The part in the supporting absorbs a portion of the force caused by the wind load. This prevents the force being exchanged to different trusses and column members.

Truss connection analysis

The beams that connect the members together ought to be firm and sufficiently solid to oppose the load caused by the snow load. The beams are additionally used to join the roof material  together with the trusses. The beams are required not to deflect or have high stresses because of their essential use.

Construction of the steel structure

Discuss the following five aspects of the construction of your structure:

Prefabrication of the steel components

The steel components that ranges from column, beams and boilts were purchased at Australia steel institute and packed on heavy loriers which were used as a means of transportation to the site store that has been temporary build within the site.

Construction sequence

The Intec warehouse steel structure construction started by first carrying ou a geotechnical reserch, which was foolowed building the foundation of the structure, the colums and rafters where then erected, and beams were punched and welded to the columns, this was followed by the girts, purlins and frame openings, later on the roofs and walls will by screwing the sheeting to the frames for walling and later roof pannel, lastly the aesthetic by adding bells and whistles.

Ease and safe erection procedures

The structure was easily erected by first starting with the colums, followed by beams, and ending up with walls and roofings.

Efficient site management

The site was easily managed by the clerk of work, who had assigned the steel expertise role and responsibility to report to him incase of any problem that may arise at each and every point of the construction work.Material handling

The materials where handled mainly using craines since they very heavy, similarly all the workers were all equipped with construction safety cloathes

Composite slab comprise of profiled steel decking with an in-situ strengthened concrete top. The decking serves as perpetual formwork to the concrete, and also gives an adequate shear bond to the concrete so that, when the concrete has achieved in its strength, the two materials act together compositely.Composite beams are typically hot rolled or manufactured steel sections that demonstration compositely with the slab. The composite collaboration is accomplished by the connection of shear connectors to the top flange of the beam. These connectorsfor the most part appear as headed studs. preceding setting the concrete. The shear connectors give adequate longitudinal shear association between the beam and the concrete with the goal that they act together structurally.

Composite slabs and bars are usually utilized with steel columns in the buildings structures due to the speed of development and general auxiliary economy that can be accomplished.

The design of the building for quality before analysis is very amazing on the grounds that the vast majority of the beams, columns, roof trusses and bracing connections can oppose the forces caused by the given loads. Distinctive loading conditions are connected on the structure to see whether the structure will in any case be steady. Nonetheless, a few beams under certain loading conditions have exceptionally high stresses and deflections. Safety values for deflections and stresses are ascertained in the analysis. In the event that the structure encounters estimations of stress and deflections that are near the safety values, at this point it need a new process redesign of the members of the structure.

References

Beeby, A.W. and Narayanan, R.S., 2005. Designers' Guide to EN 1992-1-1 and EN 1992-1-2. Eurocode 2: Design of Concrete Structures: General Rules and Rules for Buildings and Structural Fire Design. Thomas Telford.

Brettle, M.E. and Brown, D.G., 2009. Steel Building Design: Concise Eurocodes. SCI Publication P, 362, p.2009.

Bureau, A., 2006. NCCI: Elastic critical moment for lateral torsional buckling. SN003a-EN-EU, Access Steel< project. access-steel. com/Content/Content. htm>[26.11. 06].

Bureau, A., 2006. NCCI: Shear resistance of a simple end plate connection. SN014a-EN-EU, Access Steel< project. access-steel. com/Content/Content. htm>[26.11. 06].

Gardner, L. and Nethercot, D.A., 2011. Designers' Guide to Eurocode 3: Design of Steel Buildings. ICE publishing.

REAL, P., Couto, C., Lopes, N. and Rodrigues, J.P., 2010. Stability Check of Steel Frames Exposed to Fire. In Structures in Fire: Proceedings of the Sixth International Conference (p. 27). DEStech Publications, Inc.

Cite This Work

To export a reference to this article please select a referencing stye below:

My Assignment Help. (2021). Design Analysis Of Warehouse Building: Steel Schedule And Core Connections. Retrieved from https://myassignmenthelp.com/free-samples/200470-construction-technology/separate-submission.html.

"Design Analysis Of Warehouse Building: Steel Schedule And Core Connections." My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/200470-construction-technology/separate-submission.html.

My Assignment Help (2021) Design Analysis Of Warehouse Building: Steel Schedule And Core Connections [Online]. Available from: https://myassignmenthelp.com/free-samples/200470-construction-technology/separate-submission.html
[Accessed 19 April 2024].

My Assignment Help. 'Design Analysis Of Warehouse Building: Steel Schedule And Core Connections' (My Assignment Help, 2021) <https://myassignmenthelp.com/free-samples/200470-construction-technology/separate-submission.html> accessed 19 April 2024.

My Assignment Help. Design Analysis Of Warehouse Building: Steel Schedule And Core Connections [Internet]. My Assignment Help. 2021 [cited 19 April 2024]. Available from: https://myassignmenthelp.com/free-samples/200470-construction-technology/separate-submission.html.

Get instant help from 5000+ experts for
question

Writing: Get your essay and assignment written from scratch by PhD expert

Rewriting: Paraphrase or rewrite your friend's essay with similar meaning at reduced cost

Editing: Proofread your work by experts and improve grade at Lowest cost

loader
250 words
Phone no. Missing!

Enter phone no. to receive critical updates and urgent messages !

Attach file

Error goes here

Files Missing!

Please upload all relevant files for quick & complete assistance.

Plagiarism checker
Verify originality of an essay
essay
Generate unique essays in a jiffy
Plagiarism checker
Cite sources with ease
support
Whatsapp
callback
sales
sales chat
Whatsapp
callback
sales chat
close